EVALUATION AND COMPARISON OF BIDS. 31.1 The Purchaser will evaluate and compare the bids, which have been determined to be substantially responsive. 31.2 The Purchaser's evaluation of a bid will take into consideration one or more of the following factors All the bids, which are opened, read out and considered for evaluation will be checked for qualification requirements in respect of technical and commercial aspects. Such of the bids, which do not meet the qualification requirements, will not be evaluated further. The bid is to be checked for its conformity to the technical specification. If it does not meet the technical Specification, the Bid will not be evaluated further. However, if in the opinion of the purchaser the bidder has offered equipment/material better than the technical specification the same may be considered. The bid may be rejected for the following reasons: 1. Not in the prescribed form 2. Insufficient bid security or bid not accompanied by the required bid security or proof of permanent bid security/exemption 3. Bids not properly signed 4. The bidder is a vendor who is banned from further business transactions and the period of ban is still in force. 5. Bid received after the due date and time 6. The bid is through telegram or fax 7. Bids submitted not as per measuring units mentioned in the tender document. For example: If the unit of measurement in tenders is in Kilolitres (KL) & if the bidder has quoted his rate for Litres with the same unit of measurement in kilo Litres (KL), then the bidder has to be disqualified as the bidder quoted rate is too low for Kilo Litre which is impossible to supply at that rate. ● Further, the purchaser may enquire from the bidder in writing for any clarification of the bid. The response of the bidder will also be in writing. However no change in the prices or substance of the bid will be sought, offered or permitted. ● Bids will be examined for completeness and for any computational errors. ● Arithmetical errors will be rectified on the following basis. O Where there is a discrepancy between the unit price and total price, the unit price will prevail and the total price will be corrected accordingly. O Where there is a discrepancy between words and figures, the amount in words will prevail. O If there is a discrepancy between the soft copy and the hard copy, the hard copy will prevail. O If the bidder does not attest any overwriting in the price column such Bids will be rejected. O Failure on the part of the bidder to agree to the above corrections will result in rejection of his offer and forfeiture of his bid security. ● It will be ensured that the required sureties have been furnished and that the documents have been properly signed. ● The purchaser’s evaluation of a bid shall take into consideration one or more of the following factors (a) Delivery schedule offered in the bid; (b) Deviations in payment schedule from that specified in the general terms and conditions of the contract and technical deviations. (c) The cost of components, mandatory spare parts, and service; (d) The availability of spare parts and after-sales services for the equipment offered in the Bid; (e) The projected operating and maintenance costs during the life of the equipment; The performance and productivity of the equipment offered; Other specific criteria indicated in the Bidding documents. In addition the Purchaser’s evaluation of a bid will take into account the net landed cost of the material at the final destination. For the purpose of evaluation net landed cost is arrived at by adding all elements of the basic price, allowable discount, GST & any other levies, packing & forwarding, freight charges, insurance (transit & storage) as quoted by the bidder, interest on advance if any, unloading at final destination, erection, servicing and other charges as called for. In addition any variation up or down in taxes and duties / new levies introduced subsequent to bid opening and before award will be considered for comparison purposes. The following criteria may be adopted for taxes and duties for evaluation a. It is the responsibility of the bidder to quote all taxes and duties correctly without leaving any column unfilled (see samples form 1).Where taxes and duties are not applicable the bidder should enter “NA”. If no duty / tax is leviable the same may be entered as “NIL”. If any column is left blank or filled vaguely like “as applicable”, the same will be loaded with the maximum of the other eligible Bids. b. Where there is an exemption of GST, the documentary evidence to that effect will be enclosed by the supplier. ● Prior to detailed evaluation, the responsiveness of each bid will be determined. A substantially responsive bid is one that conforms to all the terms and conditions of the bidding documents without material deviations. For this purpose superscription, qualification requirement, bid security, validity, delivery, payment term, price schedule, taxes and duties will be deemed to be the critical provisions and deviations in any one of these items will be deemed to be a material deviation. The purchaser may waive any minor informality, non-conformity or irregularity in the bid which does not constitute a material deviation, provided such waiver does not affect the relative ranking of any bidder. The purchaser will clearly indicate in the bid specification the methodology for evaluation of bids. (a) Bid price, which will include all, costs of manufacture and services at manufacturing place as well as, Transportation to destination stores, packing and forwarding, insurance and all Taxes & other legally permissible duties& levies payable. (b) Delivery schedule offered in the bid. (c) Deviations in payment schedule from that specified in the general terms and conditions of the contract. (d) The cost of components, mandatory spare parts, and service (e) The availability of spare parts and after-sales services for the equipment offered in the Bid; (f) The projected operating and maintenance costs during the life of the equipment; (g) The performance and productivity of the equipment offered; and/or (h) Other specific criteria indicated in the Bid Specification. (a) The Purchaser’s evaluation of a bid will take into account the Net Landed Cost of the Material at destination stores inclusive of all taxes and duties quoted by the Bidder. It is the responsibility of the bidder to quote all Taxes and Duties correctly without leaving any column unfilled. Where not applicable the column may be filled as “NA”. If no duty / tax is leviable the same may be filled as “NIL”. If any column is left blank the same is loaded with maximum of other eligible Bids. If any overwriting is not attested by the bidder in the price schedule such Bids will be rejected.
Appears in 6 contracts
Samples: Tender Specification, Tender Specification, Tender Specification
EVALUATION AND COMPARISON OF BIDS. 31.1 The Purchaser will evaluate and compare the bids, which have been determined to be substantially responsive.
31.2 The Purchaser's evaluation of a bid will take into consideration one or more of the following factors All the bids, which are opened, read out and considered for evaluation will be checked for qualification requirements in respect of technical and commercial aspects. Such of the bids, which do not meet the qualification requirements, will not be evaluated further. The bid is to be checked for its conformity to the technical specification. If it does not meet the technical Specification, the Bid will not be evaluated further. However, if in the opinion of the purchaser the bidder has offered equipment/material better than the technical specification the same may be considered. The bid may be rejected for the following reasons:
1. Not in the prescribed form
2. Insufficient bid security or bid not accompanied by the required bid security or proof of permanent bid security/exemption
3. Bids not properly signed
4. The bidder is a vendor who is banned from further business transactions and the period of ban is still in force.
5. Bid received after the due date and time
6. The bid is through telegram or fax
7. Bids submitted not as per measuring units mentioned in the tender document. For example: If the unit of measurement in tenders is in Kilolitres (KL) & if the bidder has quoted his rate for Litres with the same unit of measurement in kilo Litres (KL), then the bidder has to be disqualified as the bidder quoted rate is too low for Kilo Litre which is impossible to supply at that rate. ● Further, ,the purchaser may enquire from the bidder in writing for any clarification of the bid. The response of the bidder will also be in writing. However no change in the prices or substance of the bid will be sought, offered or permitted. ● Bids will be examined for completeness and for any computational errors. ● Arithmetical errors will be rectified on the following basis. O Where there is a discrepancy between the unit price and total price, the unit price will prevail and the total price will be corrected accordingly. O Where there is a discrepancy between words and figures, the amount in words will prevail. O If there is a discrepancy between the soft copy and the hard copy, the hard copy will prevail. O If the bidder does not attest any overwriting in the price column such Bids will be rejected. O Failure on the part of the bidder to agree to the above corrections will result in rejection of his offer and forfeiture of his bid security. ● It will be ensured that the required sureties have been furnished and that the documents have been properly signed. ● The purchaser’s evaluation of a bid shall take into consideration one or more of the following factors
(a) Delivery schedule offered in the bid;
(b) Deviations in payment schedule from that specified in the general terms and conditions of the contract and technical deviations.
(c) The cost of components, mandatory spare parts, and service;
(d) The availability of spare parts and after-sales services for the equipment offered in the Bid;
(e) The projected operating and maintenance costs during the life of the equipment; The performance and productivity of the equipment offered; Other specific criteria indicated in the Bidding documents. In addition the Purchaser’s evaluation of a bid will take into account the net landed cost of the material at the final destination. For the purpose of evaluation net landed cost is arrived at by adding all elements of the basic price, allowable discount, GST & any other levies, packing & forwarding, freight charges, insurance (transit & storage) as quoted by the bidder, interest on advance if any, unloading at final destination, erection, servicing and other charges as called for. In addition any variation up or down in taxes and duties / new levies introduced subsequent to bid opening and before award will be considered for comparison purposes. The following criteria may be adopted for taxes and duties for evaluation
a. It is the responsibility of the bidder to quote all taxes and duties correctly without leaving any column unfilled (see samples form 1).Where taxes and duties are not applicable the bidder should enter “NA”. If no duty / tax is leviable the same may be entered as “NIL”. If any column is left blank or filled vaguely like “as applicable”, the same will be loaded with the maximum of the other eligible Bids.
b. Where there is an exemption of GST, the documentary evidence to that effect will be enclosed by the supplier. ● Prior to detailed evaluation, the responsiveness of each bid will be determined. A substantially responsive bid is one that conforms to all the terms and conditions of the bidding documents without material deviations. For this purpose superscription, qualification requirement, bid security, validity, delivery, payment term, price schedule, taxes and duties will be deemed to be the critical provisions and deviations in any one of these items will be deemed to be a material deviation. The purchaser may waive any minor informality, non-conformity or irregularity in the bid which does not constitute a material deviation, provided such waiver does not affect the relative ranking of any bidder. The purchaser will clearly indicate in the bid specification the methodology for evaluation of bids.
(a) Bid price, which will include all, costs of manufacture and services at manufacturing place as well as, Transportation to destination stores, packing and forwarding, insurance and all Taxes & other legally permissible duties& levies payable.
(b) Delivery schedule offered in the bid.
(c) Deviations in payment schedule from that specified in the general terms and conditions of the contract.
(d) The cost of components, mandatory spare parts, and service
(e) The availability of spare parts and after-sales services for the equipment offered in the Bid;
(f) The projected operating and maintenance costs during the life of the equipment;
(g) The performance and productivity of the equipment offered; and/or
(h) Other specific criteria indicated in the Bid Specification.
(a) The Purchaser’s evaluation of a bid will take into account the Net Landed Cost of the Material at destination stores inclusive of all taxes and duties quoted by the Bidder. It is the responsibility of the bidder to quote all Taxes and Duties correctly without leaving any column unfilled. Where not applicable the column may be filled as “NA”. If no duty / tax is leviable the same may be filled as “NIL”. If any column is left blank the same is loaded with maximum of other eligible Bids. If any overwriting is not attested by the bidder in the price schedule such Bids will be rejected.
Appears in 1 contract
Samples: Tender Specification
EVALUATION AND COMPARISON OF BIDS. 31.1 The Purchaser will evaluate and compare the bids, which have been determined to be substantially responsive.
31.2 The Purchaser's evaluation of a bid will take into consideration one or more of the following factors All the bids, which are opened, read out and considered for evaluation will be checked for qualification requirements in respect of technical and commercial aspects. Such of the bids, which do not meet the qualification requirements, will not be evaluated further. The bid is to be checked for its conformity to the technical specification. If it does not meet the technical Specification, the Bid will not be evaluated further. However, if in the opinion of the purchaser the bidder has offered equipment/material better than the technical specification the same may be considered. The bid may be rejected for the following reasons:
1. Not in the prescribed form
2. Insufficient bid security or bid not accompanied by the required bid security or proof of permanent bid security/exemption
3. Bids not properly signed
4. The bidder is a vendor who is banned from further business transactions and the period of ban is still in force.
5. Bid received after the due date and time
6. The bid is through telegram or fax
7. Bids submitted not as per measuring units mentioned in the tender document. For example: If the unit of measurement in tenders is in Kilolitres (KL) & if the bidder has quoted his rate for Litres with the same unit of measurement in kilo Litres (KL), then the bidder has to be disqualified as the bidder quoted rate is too low for Kilo Litre which is impossible to supply at that rate. ● Further, ,the purchaser may enquire from the bidder in writing for any clarification of the bid. The response of the bidder will also be in writing. However no change in the prices or substance of the bid will be sought, offered or permitted. ● Bids will be examined for completeness and for any computational errors. ● Arithmetical errors will be rectified on the following basis. O Where there is a discrepancy between the unit price and total price, the unit price will prevail and the total price will be corrected accordingly. O Where there is a discrepancy between words and figures, the amount in words will prevail. O If there is a discrepancy between the soft copy and the hard copy, the hard copy will prevail. O If the bidder does not attest any overwriting in the price column such Bids will be rejected. O Failure on the part of the bidder to agree to the above corrections will result in rejection of his offer and forfeiture of his bid security. ● It will be ensured that the required sureties have been furnished and that the documents have been properly signed. ● The purchaser’s evaluation of a bid shall take into consideration one or more of the following factors
(a) Delivery schedule offered in the bid;
(b) Deviations in payment schedule from that specified in the general terms and conditions of the contract and technical deviations.
(c) The cost of components, mandatory spare parts, and service;
(d) The availability of spare parts and after-sales services for the equipment offered in the Bid;
(e) The projected operating and maintenance costs during the life of the equipment; The performance and productivity of the equipment offered; Other specific criteria indicated in the Bidding documents. In addition the Purchaser’s evaluation of a bid will take into account the net landed cost of the material at the final destination. For the purpose of evaluation net landed cost is arrived at by adding all elements of the basic price, allowable discount, GST & any other levies, packing & forwarding, freight charges, insurance (transit & storage) as quoted by the bidder, interest on advance if any, unloading at final destination, erection, servicing and other charges as called for. In addition any variation up or down in taxes and duties / new levies introduced subsequent to bid opening and before award will be considered for comparison purposes. The following criteria may be adopted for taxes and duties for evaluation
a. It is the responsibility of the bidder to quote all taxes and duties correctly without leaving any column unfilled (see samples form 1).Where taxes and duties are not applicable the bidder should enter “NA”. If no duty / tax is leviable the same may be entered as “NIL”. If any column is left blank or filled vaguely like “as applicable”, the same will be loaded with the maximum of the other eligible Bids.
b. Where there is an exemption of GST, the documentary evidence to that effect will be enclosed by the supplier. ● Prior to detailed evaluation, the responsiveness of each bid will be determined. A substantially responsive bid is one that conforms to all the terms and conditions of the bidding documents without material deviations. For this purpose superscription, qualification requirement, bid security, validity, delivery, payment term, price schedule, taxes and duties will be deemed to be the critical provisions and deviations in any one of these items will be deemed to be a material deviation. The purchaser may waive any minor informality, non-conformity or irregularity in the bid which does not constitute a material deviation, provided such waiver does not affect the relative ranking of any bidder. The purchaser will clearly indicate in the bid specification the methodology for evaluation of bids.
(a) Bid price, which will include all, costs of manufacture and services at manufacturing place as well as, Transportation to destination stores, packing and forwarding, insurance and all Taxes & other legally permissible duties& levies payable.
(b) Delivery schedule offered in the bid.
(c) Deviations in payment schedule from that specified in the general terms and conditions of the contract.
(d) The cost of components, mandatory spare parts, and service
(e) The availability of spare parts and after-sales services for the equipment offered in the Bid;
(f) The projected operating and maintenance costs during the life of the equipment;
(g) The performance and productivity of the equipment offered; and/or
(h) Other specific criteria indicated in the Bid Specification.
(a) The Purchaser’s evaluation of a bid will take into account the Net Landed Cost of the Material at destination stores inclusive of all taxes and duties quoted by the Bidder. It is the responsibility of the bidder to quote all Taxes and Duties correctly without leaving any column unfilled. Where not applicable the column may be filled as “NA”. If no duty / tax is leviable the same may be filled as “NIL”. If any column is left blank the same is loaded with maximum of other eligible Bids. If any overwriting is not attested by the bidder in the price schedule such Bids will be rejected.
Appears in 1 contract
Samples: Tender Specification
EVALUATION AND COMPARISON OF BIDS. 31.1 The Purchaser will evaluate and compare the bids, which have been determined to be substantially responsive.
31.2 The Purchaser's evaluation of a bid will take into consideration one or more of the following factors All the bids, which are opened, read out and considered for evaluation will be checked for qualification requirements in respect of technical and commercial aspects. Such of the bids, which do not meet the qualification requirements, will not be evaluated further. The bid is to be checked for its conformity to the technical specification. If it does not meet the technical Specification, the Bid will not be evaluated further. However, if in the opinion of the purchaser the bidder has offered equipment/material better than the technical specification the same may be considered. The bid may be rejected for the following reasons:
1. Not in the prescribed form
2. Insufficient bid security or bid not accompanied by the required bid security or proof of permanent bid security/exemption
3. Bids not properly signed
4. The bidder is a vendor who is banned from further business transactions and the period of ban is still in force.
5. Bid received after the due date and time
6. The bid is through telegram or fax
7. Bids submitted not as per measuring units mentioned in the tender document. For example: If the unit of measurement in tenders is in Kilolitres (KL) & if the bidder has quoted his rate for Litres with the same unit of measurement in kilo Litres (KL), then the bidder has to be disqualified as the bidder quoted rate is too low for Kilo Litre which is impossible to supply at that rate. ● Further, ,the purchaser may enquire from the bidder in writing for any clarification of the bid. The response of the bidder will also be in writing. However no change in the prices or substance of the bid will be sought, offered or permitted. ● Bids will be examined for completeness and for any computational errors. ● Arithmetical errors will be rectified on the following basis. O Where there is a discrepancy between the unit price and total price, the unit price will prevail and the total price will be corrected accordingly. O Where there is a discrepancy between words and figures, the amount in words will prevail. O If there is a discrepancy between the soft copy and the hard copy, the hard copy will prevail. O If the bidder does not attest any overwriting in the price column such Bids will be rejected. O Failure on the part of the bidder to agree to the above corrections will result in rejection of his offer and forfeiture of his bid security. ● It will be ensured that the required sureties have been furnished and that the documents have been properly signed. ● The purchaser’s evaluation of a bid shall take into consideration one or more of the following factors
(a) Delivery schedule offered in the bid;
(b) Deviations in payment schedule from that specified in the general terms and conditions of the contract and technical deviations.
(c) The cost of components, mandatory spare parts, and service;
(d) The availability of spare parts and after-sales services for the equipment offered in the Bid;
(e) The projected operating and maintenance costs during the life of the equipment; The performance and productivity of the equipment offered; Other specific criteria indicated in the Bidding documents. In addition the Purchaser’s evaluation of a bid will take into account the net landed cost of the material at the final destination. For the purpose of evaluation net landed cost is arrived at by adding all elements of the basic price, allowable discount, GST & any other levies, packing & forwarding, freight charges, insurance (transit & storage) as quoted by the bidder, interest on advance if any, unloading at final destination, erection, servicing and other charges as called for. In addition any variation up or down in taxes and duties / new levies introduced subsequent to bid opening and before award will be considered for comparison purposes. The following criteria may be adopted for taxes and duties for evaluation
a. It is the responsibility of the bidder to quote all taxes and duties correctly without leaving any column unfilled (see samples form 1).Where taxes and duties are not applicable the bidder should enter “NA”. If no duty / tax is leviable the same may be entered as “NIL”. If any column is left blank or filled vaguely like “as applicable”, the same will be loaded with the maximum of the other eligible Bids.
b. Where there is an exemption of GST, the documentary evidence to that effect will be enclosed by the supplier. ● Prior to detailed evaluation, the responsiveness of each bid will be determined. A substantially responsive bid is one that conforms to all the terms and conditions of the bidding documents without material deviations. For this purpose superscription, qualification requirement, bid security, validity, delivery, payment term, price schedule, taxes and duties will be deemed to be the critical provisions and deviations in any one of these items will be deemed to be a material deviation. The purchaser may waive any minor informality, non-conformity or irregularity in the bid which does not constitute a material deviation, provided such waiver does not affect the relative ranking of any bidder. The purchaser will clearly indicate in the bid specification the methodology for evaluation of bids.
(a) Bid price, which will include all, costs of manufacture and services at manufacturing place as well as, Transportation to destination stores, packing and forwarding, insurance and all Taxes & other legally permissible duties& levies payable.
(b) Delivery schedule offered in the bid.
(c) Deviations in payment schedule from that specified in the general terms and conditions of the contract.
(d) The cost of components, mandatory spare parts, and service
(e) The availability of spare parts and after-sales services for the equipment offered in the Bid;
(f) The projected operating and maintenance costs during the life of the equipment;
(g) The performance and productivity of the equipment offered; and/or
(h) Other specific criteria indicated in the Bid Specification.
31.3 (a) The a)The Purchaser’s evaluation of a bid will take into account the Net Landed Cost of the Material at destination stores inclusive of all taxes and duties quoted by the Bidder. It is the responsibility of the bidder to quote all Taxes and Duties correctly without leaving any column unfilled. Where not applicable the column may be filled as “NA”. If no duty / tax is leviable the same may be filled as “NIL”. If any column is left blank the same is loaded with maximum of other eligible Bids. If any overwriting is not attested by the bidder in the price schedule such Bids will be rejected.
Appears in 1 contract
Samples: Tender Specification
EVALUATION AND COMPARISON OF BIDS. 31.1 The Purchaser will evaluate a. Evaluation shall be done on total cost (FOT site basis) including comprehensive AMC of Two years.
b. Bidders are required to quote for complete scope of supply. If any bidder quotes for part scope/quantity shall be considered incomplete and compare the bidsshall not be evaluated, which have been determined stands rejected.
c. SOR quantities are split-able.
d. Total Quantity shall be distributed to L1, L2 & L3 Bidders (subject to matching with L1 Price) as mentioned below. Sl. No. Bidder Compressors to be substantially responsiveOrdered 2 L2 (Subject to matching with L1 Price) 5 3 L3 (Subject to matching with L1 Price) 3 For this distribution purpose, L2 bidder shall be asked to match L1 Price. In the event of L2 bidder not agreeing to match L1 Price, then L3, L4…. and so on bidder shall be asked to match L1 Price, so as to select Three bidders as prescribed above for placing of order.
31.2 The Purchaser's evaluation of e. If Only two bidders qualified by above distribution methodology, Then L3 Quantity i.e., Balance 3 No.s shall be awarded to the 2 qualified bidders as 2 No.s for L1 & 1 No.s for L2 in addition to the quantities mentioned above.
f. In case No Bidder is accepting to match with L1 bidder price, then GGPL reserves the right to place order at its own discretion.
g. In a bid will take into consideration one tie situation where two or more of bidders become L1 or L2…… the following factors All bidder whose turnover is more for the bids, which are opened, read out and considered for evaluation immediate preceding audited financial year will be checked decided as L1 or L2 …...
h. Public Procurement Policy for qualification requirements in respect Micro and Small Enterprises Clause [pursuant to relevant Clause of technical and commercial aspects40.0 of ITB. Such of the bids, which do not meet the qualification requirements, will not be evaluated further. The bid is to be checked for its conformity to the technical specification. If it does not meet the technical Specification, the Bid will not be evaluated further. However, if in the opinion of the purchaser the bidder has offered equipment/material better than the technical specification the same may be considered. The bid may be rejected for the following reasons:INSTRUCTION TO BIDDERS (TO BE READ IN CONJUNCTION WITH BIDDING DATA SHEET (BDS)
1. Not in the prescribed form
SCOPE OF BID 2. Insufficient bid security or bid not accompanied by the required bid security or proof of permanent bid security/exemption
3. Bids not properly signed
4. The bidder is a vendor who is banned from further business transactions and the period of ban is still in force.
5. Bid received after the due date and time
6. The bid is through telegram or fax
7. Bids submitted not as per measuring units mentioned in the tender document. For example: If the unit of measurement in tenders is in Kilolitres (KL) & if the bidder has quoted his rate for Litres with the same unit of measurement in kilo Litres (KL), then the bidder has to be disqualified as the bidder quoted rate is too low for Kilo Litre which is impossible to supply at that rate. ● Further, the purchaser may enquire from the bidder in writing for any clarification of the bid. The response of the bidder will also be in writing. However no change in the prices or substance of the bid will be sought, offered or permitted. ● Bids will be examined for completeness and for any computational errors. ● Arithmetical errors will be rectified on the following basis. O Where there is a discrepancy between the unit price and total price, the unit price will prevail and the total price will be corrected accordingly. O Where there is a discrepancy between words and figures, the amount in words will prevail. O If there is a discrepancy between the soft copy and the hard copy, the hard copy will prevail. O If the bidder does not attest any overwriting in the price column such Bids will be rejected. O Failure on the part of the bidder to agree to the above corrections will result in rejection of his offer and forfeiture of his bid security. ● It will be ensured that the required sureties have been furnished and that the documents have been properly signed. ● The purchaser’s evaluation of a bid shall take into consideration one or more of the following factors
(a) Delivery schedule offered in the bid;
(b) Deviations in payment schedule from that specified in the general terms and conditions of the contract and technical deviations.
(c) The cost of components, mandatory spare parts, and service;
(d) The availability of spare parts and after-sales services for the equipment offered in the Bid;
(e) The projected operating and maintenance costs during the life of the equipment; The performance and productivity of the equipment offered; Other specific criteria indicated in the Bidding documents. In addition the Purchaser’s evaluation of a bid will take into account the net landed cost of the material at the final destination. For the purpose of evaluation net landed cost is arrived at by adding all elements of the basic price, allowable discount, GST & any other levies, packing & forwarding, freight charges, insurance (transit & storage) as quoted by the bidder, interest on advance if any, unloading at final destination, erection, servicing and other charges as called for. In addition any variation up or down in taxes and duties / new levies introduced subsequent to bid opening and before award will be considered for comparison purposes. The following criteria may be adopted for taxes and duties for evaluation
a. It is the responsibility of the bidder to quote all taxes and duties correctly without leaving any column unfilled (see samples form 1).Where taxes and duties are not applicable the bidder should enter “NA”. If no duty / tax is leviable the same may be entered as “NIL”. If any column is left blank or filled vaguely like “as applicable”, the same will be loaded with the maximum of the other eligible Bids.
b. Where there is an exemption of GST, the documentary evidence to that effect will be enclosed by the supplier. ● Prior to detailed evaluation, the responsiveness of each bid will be determined. A substantially responsive bid is one that conforms to all the terms and conditions of the bidding documents without material deviations. For this purpose superscription, qualification requirement, bid security, validity, delivery, payment term, price schedule, taxes and duties will be deemed to be the critical provisions and deviations in any one of these items will be deemed to be a material deviation. The purchaser may waive any minor informality, non-conformity or irregularity in the bid which does not constitute a material deviation, provided such waiver does not affect the relative ranking of any bidder. The purchaser will clearly indicate in the bid specification the methodology for evaluation of bids.
(a) Bid price, which will include all, costs of manufacture and services at manufacturing place as well as, Transportation to destination stores, packing and forwarding, insurance and all Taxes & other legally permissible duties& levies payable.
(b) Delivery schedule offered in the bid.
(c) Deviations in payment schedule from that specified in the general terms and conditions of the contract.
(d) The cost of components, mandatory spare parts, and service
(e) The availability of spare parts and after-sales services for the equipment offered in the Bid;
(f) The projected operating and maintenance costs during the life of the equipment;
(g) The performance and productivity of the equipment offered; and/or
(h) Other specific criteria indicated in the Bid Specification.
(a) The Purchaser’s evaluation of a bid will take into account the Net Landed Cost of the Material at destination stores inclusive of all taxes and duties quoted by the Bidder. It is the responsibility of the bidder to quote all Taxes and Duties correctly without leaving any column unfilled. Where not applicable the column may be filled as “NA”. If no duty / tax is leviable the same may be filled as “NIL”. If any column is left blank the same is loaded with maximum of other eligible Bids. If any overwriting is not attested by the bidder in the price schedule such Bids will be rejected.ELIGIBLE BIDDERS
Appears in 1 contract
Samples: Bid Document