FABRICATION AND INSTALLATION REQUIREMENTS Sample Clauses

FABRICATION AND INSTALLATION REQUIREMENTS. A. Fabricator and Contractor shall use extreme care to avoid carbon impregnation on stainless steel surfaces. 1. All saws, drills, files, wire brushes, etc. shall be used for stainless steel piping only. 2. Pipe storage and fabrication racks shall be nonferrous, stainless steel or rubber-lined. May 2017 C01025C17 Georgetown Wet Weather Treatment Station 15067 - 6 STAINLESS STEEL PIPING
AutoNDA by SimpleDocs

Related to FABRICATION AND INSTALLATION REQUIREMENTS

  • Installation requirements 7.8 We (if we install the System) or our contractor (if we procure a contractor to install the System) must:

  • Construction Requirements a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.

  • Technical and Interconnection Requirements 2.1 Consumer agrees that his Rooftop Solar PV System and Net Metering System will conform to the standards and requirements specified in the Policy, Regulations and Supply Code as amended from time to time.

  • Delivery and Installation Delivery

  • Certain Requirements as to Furniture, Equipment and Fixtures If the Assuming Institution purchases owned Bank Premises or accepts an assignment of the lease (or enters into a sublease or a new lease in lieu thereof) for leased Bank Premises as provided in Section 4.6(a) or 4.6(b), or if the Assuming Institution does not exercise such option but within twelve (12) months following Bank Closing obtains the right to occupy such premises (whether by assignment, lease, sublease, purchase or otherwise), other than in accordance with Section 4.6(a) or (b), the Assuming Institution shall (i) effective as of the date of Bank Closing, purchase from the Receiver all Furniture and Equipment and Fixtures owned by the Failed Bank at Fair Market Value and located thereon as of Bank Closing, (ii) accept an assignment or a sublease of the leases or negotiate new leases for all Furniture and Equipment and Fixtures leased by the Failed Bank and located thereon, and (iii) if applicable, accept an assignment or a sublease of any ground lease or negotiate a new ground lease with respect to any land on which such Bank Premises are located; provided, that the Receiver shall not have disposed of such Furniture and Equipment and Fixtures or repudiated the leases specified in clause (ii) or (iii).

  • Installation and Use You may install and use the Software only for the number of licenses acquired by you. In order to exercise your rights to the Software under this Agreement, you must activate your copy of the Software in the manner described during the launch sequence.

  • Design Requirements 9.2.1. Metal liner The compressive stress in the liner at zero pressure and 15 °C shall not cause the liner to buckle or crease.

  • Application Requirements This application shall contain, as a minimum, a sketch showing the location of proposed facilities; a description, sketch, manufacturer’s brochure, etc. of the proposed facilities; and a description of the operation proposed. (11-28-90) 101. -- 199. (RESERVED)‌ 200. OPERATIONAL AGREEMENT.‌‌

  • INSTALLATION AND REMOVAL Show Management reserves the right to fix the time for the installation of a booth prior to the Show opening and for its removal after the conclusion of the Show. Installation of all exhibits must be fully completed by the opening time of the exposition. Any space not claimed and occupied three hours prior to opening, may be resold or reassigned without refund. No exhibitor will be allowed to dismantle or repack any part of his exhibit until after the closing of the Show. 6.

  • Installation and Use Rights You may install and use any number of copies of the software on your devices.

Time is Money Join Law Insider Premium to draft better contracts faster.