Failure to Reach Storage Contract Capacity Sample Clauses

Failure to Reach Storage Contract Capacity. If, at Commercial Operation, the Installed Battery Capacity is less than one hundred percent (100%) of the Storage Contract Capacity, Seller shall have one hundred twenty (120) days after the Commercial Operation Date to install additional capacity or Network Upgrades such that the Installed Battery Capacity is equal to (but not greater than) one hundred percent (100%) of the Storage Contract Capacity, and Seller shall provide to Buyer a new certificate substantially in the form attached as Exhibit I hereto specifying the new Installed Battery Capacity. If Seller fails to construct the Storage Contract Capacity by such date, Seller shall pay “Capacity Damages” to Buyer, in an amount equal to Two Hundred Fifty Thousand Dollars ($250,000) for each MWAC that the Storage Contract Capacity exceeds the Installed Battery Capacity, and the Storage Contract Capacity and other applicable portions of the Agreement shall be adjusted accordingly. EXHIBIT C
AutoNDA by SimpleDocs

Related to Failure to Reach Storage Contract Capacity

  • Contract Capacity The electric power producing capability of the Generating Facility which is committed to Edison.

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Right to Contracted Capacity & Energy 4.4.1 The SPD will declare the CUF of the project and will be allowed to revise the same once within first year after COD of the project. Thereafter, the CUF for the Project shall remain unchanged for the entire term of the PPA. The declared annual CUF shall in no case be less than 17%. It shall be the responsibility of the SPD, entirely at its cost and expense to install such number of Solar panels and associated infrastructure(like project equipment)as may be necessary to achieve the required CUF, and for this purpose SPD shall make its own study and investigation of the GHI and other factors prevalent in the area which have implication on the quantum of generation. Further, arrangement of extra land for such installation shall be intimated to MSPDCL in advance and MSPDCL shall have to reply for the same in 7 days in the best interest of the project generation. However,non- availability of land shall not absolve SPD from his obligations under the PPA. SPD shall maintain generation so as to achieve annual CUF within + 10% and -15% of the declared value till the end of 10 years from COD, subject to the annual CUF remaining minimum of 15%, and within +10% and -20% of the declared value of the annual CUF thereafter till the end of the PPA duration of 25 years. The lower limit will, however, be relaxable by MSPDCL to the extent of non-availability of grid for evacuation which is beyond the control of the SPD. The annual CUF will be calculated every Contract Year. The compensation due to shortfall in generation shall be applied to the amount of shortfall in generation during the Contract Year. The amount of compensation shall be equal to the compensation payable (including equivalent amount of Electricity purchased from the grid for meeting load demand due to short fall in solar power) by the buying Entity, which shall ensure that the buying Entity is offset for all potential costs associated with low generation and supply of power under the PPA, subject to a minimum of 50% (fifty per cent) of the cost of this shortfall in energy terms, calculated at PPA tariff. The amount, being equal to the compensation payable, by the buying Entity for not meeting load requirements is only a measure of damage. It shall not be construed that the compensation is payable by SPD only if the buying Entity are required to pay compensation for such not meeting of load requirements or that the buying Entity or the SPD shall be required to prove or establish such payment of compensation for not meeting the load. SPD shall agree that the methodology specified herein above for calculation of liquidated damages payable by the SPD for shortfall in generation is a genuine and accurate pre-estimation of the actual loss that will be suffered by buying Entity. SPD shall further acknowledge that a breach of any of the obligations contained herein result in injuries and that the amount of the liquidated damages or the method of calculating the liquidated damages specified in this document is a genuine and reasonable pre-estimate of the damages that may be suffered by buying Entity in each case specified under this Agreement. However, this compensation shall not be applicable in events of Force Majeure identified under the PPA with MSPDCL, affecting supply of power by the SPD to the Buying Entity.

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

  • Packet Switching Capability 4.5.1 The packet switching capability network element is defined as the function of routing or forwarding packets, frames, cells or other data units based on address or other routing information contained in the packets, frames, cells or other data units.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Independent Capacity of Contractor The Contractor and Contractor Parties shall act in an independent capacity and not as officers or employees of the state of Connecticut or of the Agency.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Granite local signaling transfer point switches or Granite local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Granite local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!