FASTENER SCHEDULE Sample Clauses

FASTENER SCHEDULE. A. Provide fasteners as follows: Service Use and Location (Area Exposure) Product Remarks Connections for Structural Steel Framing Outdoor Indoor, Wet Indoor, Dry High-strength steel bolted connections Use hot-dipped galvanized high- strength bolted connections for galvanized steel framing members Connections for Steel Fabrications and Wood Components Outdoor Indoor, Wet Indoor, Dry Hot-dip galvanized carbon steel bolted connections Head Space Submerged Stainless steel bolted connection Connections of Aluminum Components Head Space Submerged Outdoor Indoor, Wet Indoor, Dry Stainless steel bolted connections, unless otherwise specified with equipment May 2017 C01025C17 Georgetown Wet Weather Treatment Station 05500 - 11 METAL FABRICATIONS Service Use and Location (Area Exposure) Product Remarks All Others Outdoor Indoor, Wet Indoor, Dry Chemical Corrosive Process Corrosive Head Space Submerged Stainless steel fasteners B. Antiseizing Lubricant: Use on all stainless steel threads. END OF SECTION May 2017 C01025C17 Georgetown Wet Weather Treatment Station 05500 - 12 METAL FABRICATIONS This page intentionally left blank. May 2017 C01025C17 Georgetown Wet Weather Treatment Station 05501 - 1 ANCHORAGE TO CONCRETE SECTION 05501 ANCHORAGE TO CONCRETE
AutoNDA by SimpleDocs

Related to FASTENER SCHEDULE

  • PROGRESS SCHEDULE The Contractor, within ten (10) working days of receiving notice of the award of the contract, shall prepare and submit for the State's and Architect's information an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • Shift Schedule The words "shift schedule" when used in this Agreement shall mean a timetable of the shifts and off days assigned to a position or group of positions which commences at the beginning of a pay period and includes one complete rotation of said shifts.

  • Contract Schedule The information set forth in the Contract Schedule is true and correct.

  • Flexible Work Schedules An employee may request a modification of their current work schedule to another schedule. The Employer, or its designees, may approve or deny flexible work schedules and retain the responsibility for determining exemptions from, or terminations of, flexible work schedules which adversely affect the operation of the Minnesota Judicial Branch or the level of service to the public.

  • Equipment List 1. All items of equipment to be purchased with funds under this Contract must be itemized in Grantee’s equipment list as finally approved by the System Agency in the executed Contract. The equipment list must include: i. Description of the property; ii. Serial number or other identification number; iii. Source of funding for the property (including the Federal Assistance Identification Number); iv. Who holds title, v. Acquisition date and cost of the property;

  • Wage Schedule ‌ The pay rate (including increments and stated extras) as agreed to and hereinafter in this Schedule provided, shall be in effect during the term of the Agreement, from April 1, 2019 to March 31, 2022.

  • Outage Schedules The Connecting Transmission Owner shall post scheduled outages of its transmission facilities on the NYISO OASIS. Developer shall submit its planned maintenance schedules for the Large Generating Facility to Connecting Transmission Owner and NYISO for a minimum of a rolling thirty-six month period. Developer shall update its planned maintenance schedules as necessary. NYISO may direct, or the Connecting Transmission Owner may request, Developer to reschedule its maintenance as necessary to maintain the reliability of the New York State Transmission System. Compensation to Developer for any additional direct costs that the Developer incurs as a result of rescheduling maintenance, including any additional overtime, breaking of maintenance contracts or other costs above and beyond the cost the Developer would have incurred absent the request to reschedule maintenance, shall be in accordance with the ISO OATT. Developer will not be eligible to receive compensation, if during the twelve (12) months prior to the date of the scheduled maintenance, the Developer had modified its schedule of maintenance activities other than at the direction of the NYISO or request of the Connecting Transmission Owner.

  • Voltage Schedules Once the Developer has synchronized the Large Generating Facility with the New York State Transmission System, NYISO shall require Developer to operate the Large Generating Facility to produce or absorb reactive power within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria). NYISO’s voltage schedules shall treat all sources of reactive power in the New York Control Area in an equitable and not unduly discriminatory manner. NYISO shall exercise Reasonable Efforts to provide Developer with such schedules in accordance with NYISO procedures, and may make changes to such schedules as necessary to maintain the reliability of the New York State Transmission System. Developer shall operate the Large Generating Facility to maintain the specified output voltage or power factor at the Point of Interconnection within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria) as directed by the Connecting Transmission Owner’s System Operator or the NYISO. If Developer is unable to maintain the specified voltage or power factor, it shall promptly notify NYISO.

  • Work Schedule (A) Where an employee has an established schedule, a change in workdays or shifts will be posted no less than 14 calendar days in advance and will reflect at least a two workweek schedule; however, the state will make a good faith effort to reflect a one month schedule. (B) In the event of a declared emergency the notice requirement of this Section may be void. (C) The state will continue to observe the scheduling structures currently in place at each agency and agrees to bargain any change in the overall practice of how schedules are established.