Feet Sample Clauses

Feet. 2.6.1. The right foot of the driver test dummy shall rest on the undepressed accelerator with the rearmost point of the heel on the floor surface in the plane of the pedal. If the foot cannot be placed on the accelerator pedal, it shall be positioned perpendicular to the tibia and placed as far forward as possible in the direction of the centreline of the pedal with the rearmost point of the heel resting on the floor surface. The heel of the left foot shall be placed as far forward as possible and shall rest on the floor pan. The left foot shall be positioned as flat as possible on the toe board. The longitudinal centreline of the left foot shall be placed as parallel as possible to the longitudinal centreline of the vehicle. For vehicles equipped with a footrest, it shall be possible at the request of the manufacturer to place the left foot on the footrest. In this case the position of the left foot is defined by the footrest.
AutoNDA by SimpleDocs
Feet. At all times from April 1 through October 31 that the calculated water surface elevation of Lake Tahoe exceeds 6,225.5 feet Lake Tahoe Datum, Releases of Floriston Rate Water from Lake Tahoe shall be reduced to the maximum extent permissible under this Agreement and Boca Storage Water shall be Released, to the extent possible, to maintain Floriston Rates, except that 4,000 acre-feet of Boca Storage Water subject to Release under the provisions of Section 5.A.5 shall be retained in Boca Reservoir for the purpose provided in Section 5.A.5(b). If such Releases are insufficient to maintain Floriston Rates, then any combination of Lake Tahoe Floriston Rate Water which is stored as Project Water in Another Reservoir in Stampede Reservoir and Lake Tahoe Floriston Rate Water in Lake Tahoe shall be Released to the extent available and necessary to maintain Floriston Rates. Tahoe-Xxxxxxx Exchange Water shall be used to maintain Floriston Rates in accordance with Section 5.B.6(a)(3).
Feet. The property can be rebuilt to its current state unless there is casualty damage of more than 50% of the cost of replacement of the entire building. If the cost of restoration of such damaged building does not exceed 50% of the cost of replacement of the entire building, no repairs or reconstruction shall be made unless such restoration is commenced within one year from the date of casualty. The property contains two buildings, the main property is 25,650 sq. ft. and there is a small office building of approximately 1,152 sq. ft. on the northern edge of the property. This building was not included in the underwriting of the loan. The setback violation only affects this property. Loan No. - 756184 (45 Gilpin Avenue) ------------------------------------ Explanation -The property is legal non-conforming with respect to floor area ratio restrictions and parking. The current maximum floor area ratio requirement is 35%. The approximate floor area ratio is 49.73%. The property requires 341 parking spaces and there are 264 parking spaces (deficient 77 spaces). A building can be restored to its existing state unless there is casualty damage of more than 50% of the structure. Ordinance and Law coverages A, B & C were obtained. The property contains two buildings which are fully sprinklered. The LTV for the property is 67.1%. Loan No. - 756196 (711 Distribution Way) ---------------------------------------- Explanation - The property is legal non-conforming with respect to parking. Zoning requires 49 spaces, and the property has 43 spaces (deficient 6 spaces). The property can be restored to its existing state as long as the repair of damage or destruction is started within one year of the date of the partial destruction and is diligently carried to completion, and there is casualty damage of less than 50% of the value of the structure, exclusive of the foundation. The LTV for the property is 65.3% and the loan is structured on a 25 year amortization. --------------------------------------------------------------------------- Rep. No. 33 - Licenses and Permits --------------------------------------------------------------------------- Xxxx Xx. - 000000 (000 Xxxxxxx Xxxxxx) -------------------------------------- Explanation -The Certificate of Occupancy has not been received for Parkinson's Institute. A recourse xxxxx-xxx xrovision was added for any loss or damage to Lender due to failure to obtain the permanent Certificate of Occupancy. -------------------------------...
Feet. The Supplier will be responsible for thinning trees for light penetration and air circulation and dead wood removal of dead, dying, diseased and/or dying branches, sucker, etc. Branches and suckers are to be removed to a height of ten (10) feet. All palm trees, regardless of size, shall be trimmed bi-annually. removing husks and palm fronds.
Feet. Except as specifically provided in this Agreement, DBE and RR voluntarily agree to not seek any additional Structure height above 45.67 feet from the Town, a court, or any other governmental or private entity, and voluntarily agrees to enter into a deed restriction limiting Structure height to 45.67 feet, and further prohibiting any owner or owner’s agent from pursuing increased height unless the zoning laws of the Town then in effect and applicable to the Structure permit a Structure height in excess of 45.67 feet measured as described in this paragraph. Exceptions to the 45.67 feet height limitation include all chimneys and stand pipes required to comply with fire code, but they shall not exceed 24 inches above the 45.67 feet height limitation. Additional exceptions to the 45.67 feet height limitation include elevator bulkheads where required for safety, and air handling systems (appropriately screened) and alternative energy system when appropriately set back from roof edges so as not to be visible from the street. Elevator bulkheads, air handling systems and alternative energy systems shall not exceed 42 inches above the 45.67 feet height limitation.
Feet. The City shall review designs and associated studies for adequacy in protecting the shoreline set-back area under these conditions. The City shall prepare Conditions of Approval, where necessary, to ensure that the design criteria are met. Prior to receiving a grading permit, the Project Sponsor shall incorporate applicable City and Bay Conservation and Development Commission (BCDC) Conditions of Approval into project designs. HY-8. Tidal and Wave Action Flooding See MM HY-7.1, MM HY-7.2, and MM HY-7.3. Potential Impact Mitigation Measure Location Monitoring/ Reporting Action Agency Responsible Timing HY-11. Cumulative Sea Level Rise and Tides See MM HY-7.1, MM HY-7.2, and MM HY-7.3. EXHIBIT E – 000 Xxxxxxx Xxxxxxxxx Development Project STATEMENT OF FINDINGS AND
Feet. All below-ground structures, including storm drains, sewers, equipment facilities, and others, shall be flood proofed and designed to withstand hydrostatic forces and buoyancy from water surface elevations up to 7.1 feet in elevation. Certain portions of the shoreline open space may not be protected at the ultimate level of flooding, given proposed heights. However, developed areas of the Project would be protected. For the shoreline areas, an adaptive strategy would be developed to address end-of- century conditions. Mitigation Measure HY-7.2: Provide Adequate Storm Flow Conveyance Capacity for Sea Level Rise Conditions. To ensure that the storm drain system conveyance capacity is not constricted by sea level rise at the outlets, the Project Sponsor shall design the storm drain system to adequately convey stormwater runoff at outlet water surface elevations equivalent to the 100- year flood event base elevation plus sea level rise of 55 inches (water surface elevation of 11.6 feet at the outlet). Prior to receiving a grading permit, the City shall review project designs and studies for adequacy of storm flow conveyance with an outlet surface water elevation of 11.6 feet and in accordance with City design standards. The City shall prepare Conditions of Approval, where necessary, to ensure that the design criteria are met. The Project Sponsor shall incorporate applicable City Conditions of Approval into project designs, prior to receiving a grading permit. Mitigation Measure HY-7.3: Provide Protection of Shoreline and Flood Protection Features from Hydrodynamic Forces from Sea Level Rise Conditions. Prior to receiving a grading permit, in order to ensure that the shoreline and flood protection features associated with the proposed project provide protection under sea level rise hydrodynamic and/or hydrostatic conditions, the Project Sponsor shall prepare engineering studies to identify expected hydrodynamic forces for under storm surge conditions (at least 2 percent wave run-up) and a base flood elevation of at least 11.6 feet and hydrostatic forces from a water surface elevation of 8.1 feet (mean higher high water plus 55-inch sea level rise). For the shoreline areas, an adaptive strategy would be implemented to address end-of-century conditions. The Project Sponsor shall design shoreline and flood protection features that could accommodate hydrodynamic forces from sea level rise conditions along wherever flood protection features are identified under Miti...
AutoNDA by SimpleDocs
Feet. The Project Sponsor shall also design flood protection features for protection against hydrostatic forces from a water surface elevation of 8.1 feet (mean higher high water plus 55-inch sea level rise). The City shall review designs and associated studies for conformance with City requirements and adequacy of design measures to withstand hydrodynamic and hydrostatic forces associated with the design Criteria. The Project Sponsor shall also design erosion protection along the shoreline set-back area for protection under storm surge conditions (at least 2 percent wave run-up) and a base flood elevation of at least 11.6
Feet. The City shall review designs and associated studies for adequacy in protecting the shoreline set-back area under these conditions. The City shall prepare Conditions of Approval, where necessary, to ensure that the design criteria are met. Prior to receiving a grading permit, the Project Sponsor shall incorporate applicable City and Bay Conservation and Development Commission (BCDC) Conditions of Approval into project designs.
Feet. The Parties agree to work cooperatively to balance the needs of the City to utilize the City Property prior to Closing with the needs of the Company to conduct due diligence on and of the City Property prior to Closing. Further, the Company acknowledges that the Right-of-Way Property contains a public right-of-way that cannot be impeded, blocked or temporarily closed for due diligence except to the extent coordinated in advance with the City.
Time is Money Join Law Insider Premium to draft better contracts faster.