Final Design Review (FDR Sample Clauses

Final Design Review (FDR. At the system FDR the Contractor shall formally satisfy Inmarsat on the readiness of the Protoflight spacecraft for system level testing. The FDR shall establish the compliance of the spacecraft system to the specification requirements based upon qualification or protoflight tests at equipment and subsystem levels, using design analyses, system level budgets and studies. This review shall also establish the readiness of the system level test procedures and software for availability two weeks prior to subsequent system level test phases. The FDR will be deemed to be complete upon the completion and acceptance by Inmarsat of resolution of major action items.
AutoNDA by SimpleDocs

Related to Final Design Review (FDR

  • Design Review ‌ (a) Where so specified in Schedule A (Scope of Goods and Services) or as otherwise instructed by the City, the Supplier shall submit design-related Documentation for review by the City, and shall not proceed with work on the basis of such design Documentation until the City’s approval of such Documentation has been received in writing. (b) None of: (i) the submission of Documentation to the City by the Supplier; (ii) its examination by or on behalf of the City; or (iii) the making of any comment thereon (including any approval thereof) shall in any way relieve the Supplier of any of its obligations under this Agreement or of its duty to take reasonable steps to ensure the accuracy and correctness of such Documentation, and its suitability to the matter to which it relates.

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall: 1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the Work to be performed and furnished by Contractor. 2. Visit the Site as needed to assist in preparing the final Drawings and Specifications. 3. Provide technical criteria, written descriptions, and design data for Owner’s use in filing applications for permits from or approvals of governmental authorities having jurisdiction to review or approve the final design; assist Owner in consultations with such authorities; and revise the Drawings and Specifications in response to directives from such authorities, as appropriate. 4. Advise Owner of any recommended adjustments to the opinion of probable Construction Cost. 5. After consultation with Owner, include in the Construction Contract Documents any specific protocols for the transmittal of Project-related correspondence, documents, text, data, drawings, information, and graphics, in electronic media or digital format, either directly, or through access to a secure Project website. Any such protocols shall be applicable to transmittals between and among Owner, Engineer, and Contractor during the Construction Phase and Post- Construction Phase, and unless agreed otherwise shall supersede any conflicting protocols previously established for transmittals between Owner and Engineer. 6. Assist Owner in assembling known reports and drawings of Site conditions, and in identifying the technical data contained in such reports and drawings upon which bidders or other prospective contractors may rely. 7. In addition to preparing the final Drawings and Specifications, assemble drafts of other Construction Contract Documents based on specific instructions and contract forms, text, or content received from Owner. 8. Prepare or assemble draft bidding-related documents (or requests for proposals or other construction procurement documents), based on the specific bidding or procurement-related instructions and forms, text, or content received from Owner. 9. Contract shall include contractor provided changeable message signs to communication construction information. 10. Furnish for review by Owner, its legal counsel, and other advisors, 6 copies of the final drawings and Specifications, assembled drafts of other construction Contract Documents, the draft bidding-related documents (or requests for proposals or other construction procurement documents), and any other final design Phase deliverables, by the established due date, with the Final Design Phase, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items, and any instructions for revisions. B. Engineer’s services under the Final Design Phase will be considered complete on the date when Engineer has delivered to Owner the final Drawings and Specifications, other assembled Construction Contract Documents, bidding-related documents (or requests for proposals or other construction procurement documents), and any other Final Design Phase deliverables. C. In the event that the Work designed or specified by Engineer is to be performed or furnished under more than one prime contract, or if Engineer’s services are to be separately sequenced with the work of one or more prime Contractors (such as in the case of fast- tracking), Owner and Engineer shall, prior to commencement of the Final Design Phase, develop a schedule for performance of Engineer’s services during the Final Design, Bidding or Negotiating, Construction, and Post-Construction Phases in order to sequence and coordinate properly such services as are applicable to the work under such separate prime contracts.

  • Final Design Provide OWNER with proposed final construction drawings and detailed opinions of probable total Project construction costs in writing for OWNER' s review, prior to completion of the final Contract Documents, so that any changes that may be necessary in accordance with Project' s budgetary schedule can be made prior to bid.

  • Transition Review Period In accordance with Article 35, Layoff and Recall, the Employer may require an employee to complete a transition review period.

  • Commencement of Final Design This contract does not obligate the State to proceed with final design for any alternative. On completion of environmental documentation, the State will consider all reasonable alternatives in a fair and objective manner. Notwithstanding anything contained elsewhere in the contract or in any work authorization, the Engineer may not proceed with final design until after all relevant environmental decision documents have been issued.

  • Project Review A. Programmatic Allowances 1. If FEMA determines that the entire scope of an Undertaking conforms to one or more allowances in Appendix B of this Agreement, with determinations for Tier II Allowances being made by SOI-qualified staff, FEMA shall complete the Section 106 review process by documenting this determination in the project file, without SHPO review or notification. 2. If the Undertaking involves a National Historic Landmark (NHL), FEMA shall notify the SHPO, participating Tribe(s), and the NPS NHL Program Manager of the NPS Midwest Regional Office that the Undertaking conforms to one or more allowances. FEMA shall provide information about the proposed scope of work for the Undertaking and the allowance(s) enabling FEMA’s determination. 3. If FEMA determines any portion of an Undertaking’s scope of work does not conform to one or more allowances listed in Appendix B, FEMA shall conduct expedited or standard Section 106 review, as appropriate, for the entire Undertaking in accordance with Stipulation II.B, Expedited Review for Emergency Undertakings, or Stipulation II.C, Standard Project Review. 4. Allowances may be revised and new allowances may be added to this Agreement in accordance with Stipulation IV.A.3, Amendments. B. Expedited Review for Emergency Undertakings

  • REVIEW OF WORK The Consultant shall permit the City, its agents and/or employees to review, at any time, all work performed pursuant to the terms of this Agreement at any stage of the work;

  • Quality Improvement VRC shall develop programs designed to improve the quality of care provided by the Radiologists and encourage identification and adoption of best demonstrated processes. Practice and VRC acknowledge that, in connection with such quality improvement activities, it may be necessary to provide VRC with Protected Health Information and Practice and VRC agree to treat such information in accordance with Article 9;

  • Performance Improvement Plan timely and accurate completion of key actions due within the reporting period 100 percent The Supplier will design and develop an improvement plan and agree milestones and deliverables with the Authority 3.2 The Authority may from time to time make changes to the KPIs measured as set out in paragraph 3.1 above and shall issue a replacement version to the Supplier. The Authority shall give notice In Writing of any such change to the KPIs measured and shall specify the date from which the replacement KPIs must be used for future reports. Such date shall be at least thirty (30) calendar days following the date of the notice to the Supplier.

  • Exclusion Review Notwithstanding any provision of Title 42 of the United States Code or Title 42 of the Code of Federal Regulations, the only issues in a proceeding for exclusion based on a material breach of this CIA shall be whether Good Shepherd was in material breach of this CIA and, if so, whether: a. Good Shepherd cured such breach within 30 days of its receipt of the Notice of Material Breach; or b. the alleged material breach could not have been cured within the 30-day period, but that, during the 30-day period following Good Shepherd’s receipt of the Notice of Material Breach: (i) Good Shepherd had begun to take action to cure the material breach; (ii) Good Shepherd pursued such action with due diligence; and (iii) Good Shepherd provided to OIG a reasonable timetable for curing the material breach. For purposes of the exclusion herein, exclusion shall take effect only after an ALJ decision favorable to OIG, or, if the ALJ rules for Good Shepherd, only after a DAB decision in favor of OIG. Good Shepherd’s election of its contractual right to appeal to the DAB shall not abrogate OIG’s authority to exclude Good Shepherd upon the issuance of an ALJ’s decision in favor of OIG. If the ALJ sustains the determination of OIG and determines that exclusion is authorized, such exclusion shall take effect 20 days after the ALJ issues such a decision, notwithstanding that Good Shepherd may request review of the ALJ decision by the DAB. If the DAB finds in favor of OIG after an ALJ decision adverse to OIG, the exclusion shall take effect 20 days after the DAB decision. Good Shepherd shall waive its right to any notice of such an exclusion if a decision upholding the exclusion is rendered by the ALJ or DAB. If the DAB finds in favor of Good Shepherd, Good Shepherd shall be reinstated effective on the date of the original exclusion.