Final Working Drawings Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Tenant shall cause the approved Final Space Plan to be converted by the Architect and the Engineers to complete architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is complete to allow subcontractors to bid on the work and to obtain all applicable permits (collectively, the “Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after Landlord’s receipt of the Final Working Drawings for the Premises if the same is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall immediately revise the Final Working Drawings in accordance with such review and any disapproval of Landlord in connection therewith. Landlord and Tenant acknowledge that the Final Space Plans may not depict certain structural elements of the Building and/or various elements of the Building systems which may result in material modifications to the Final Working Drawings (“Space Plan Modifications”) Furthermore, the Final Space Plans for the construction of the Tenant Improvements may require modification to account for the requirements of building codes and other legal requirements of applicable governmental entities, including, but not limited to, Title 24 and the Americans with Disabilities Act (collectively the “Building Codes”). The Final Working Drawings shall materially conform to the Final Space Plans, taking into account (i) Space Plan Modifications, (ii) the requirements of the Building Codes, (iii) other modifications resulting from physical constraints of the Premises and (iv) modifications requested by Tenant and consented to by Landlord, which consent shall not be unreasonably withheld. Tenant agrees that, in addition to other factors and considerations Landlord may take into account, it shall not be unreasonable for Landlord to withhold its consent to any matters set forth in the Final Working Drawings and not contained in the Final Space Plans, (i) if such requested modifications would not comply with the Building Codes or any laws, (ii) subject to Section 7 if such requested modifications would cause the anticipated cost of the Tenant Improvements to exceed the Tenant Improvement Allowance (unless Tenant agrees to be responsible for all such costs, and provide evidence satisfactory to Landlord of Tenant’s ability to pay such amounts, including escrow the funds if required by Landlord), (iii) if such requested modifications would not increase the value of the Tenant Improvements, (iv) if such requested modifications would increase the burden on the Building systems, either during construction or after completion of same.
Supervisors Working (a) The Employer agrees that the function of supervisors is the supervision of Employees and not the performance of the work of the employees they supervise. Accordingly, the Employer agrees that supervisors or other employees of the Employer who are not members of the bargaining unit shall not perform any bargaining unit work, except to train employees or demonstrate safety, or as otherwise provided in the applicable Supplement, Rider or Addendum. However, in the case of Acts of God, supervisors shall comply with the procedures in subsections (b) and (c) and may only perform bargaining unit work until bargaining unit employees are available. The Employer shall make every reasonable effort to maintain a sufficient workforce to staff its operations with bargaining unit employees. The Employer also agrees that supervisors or other employees of the Employer who are not members of the bargaining unit shall not perform bargaining unit work in preparing the work areas before the start of the Employer’s hub, preload or reload operation, nor shall the Employer send any bargaining unit employee home and then have such employee’s work performed by a supervisor or other employees of the Employer who are not a member of the bargaining unit. (b) When additional employees are necessary to complete the Employer’s operations on any shift or within any classification, the supervisor shall exhaust all established local practices to first use bargaining unit employees including where applicable, double shifting, early call-in, and overtime. (c) If there is no established local practice, the following shall apply with regard to inside work. Within each building, each operation will maintain appropriate list(s), by seniority, of those part-time employees requesting coverage work. It will be the employees’ responsibility to sign up on the appropriate list. The Company shall post such lists and employees who are interested in adding their names to the lists shall do so on the first working day of each month. It will be the employee’s responsibility to make sure his/her their contact information is correct. Employees who are unavailable to work on three (3) separate occasions within a calendar month shall have their names removed from the coverage list. Those employees shall be eligible to re-sign the list the following month. When coverage work is available, the Company will use the appropriate list to fill the required positions, and such employees will work as assigned. The employee must be qualified for the available work and double shift employees shall have seniority among themselves. No employee is allowed to work more than two (2) shifts in any twenty-four (24) hour period. Local call verification practices and procedures shall remain in place. Nothing contained in this Section shall change existing practices or procedures covering full-time work. (d) If it is determined at any step of the grievance and/or arbitration procedure that this Section, or a “supervisor working” provision in a Supplement, Rider or Addendum, has been violated, the aggrieved employee will be paid as follows: (i) if the actual hours worked by the supervisor amounts to two (2) hours or less, the aggrieved employee will be paid for the actual hours worked by the supervisor at the rate of double time the employee’s rate of pay at the time of the incident; or (ii) if the supervisor works more than two (2) hours, the aggrieved employee shall be paid four (4) hours at straight time or actual hours worked at double time the employee’s rate of pay at the time of the incident, whichever is greater. If no aggrieved employee can be identified, the payment will be made to the grievant. Such remedy shall be in addition to any other remedies sought by the Union in the appropriate grievance procedure. If a Supplement, Rider, or Addendum does not have a provision requiring notice to the xxxxxxx when a supervisor works the following shall be incorporated: “In the event a supervisor does perform bargaining unit work, the Employer shall notify the appropriate shop xxxxxxx as soon as possible.” In the event that any individual supervisor is found to be in violation of the first paragraph of this Subsection three (3) times in any nine (9) month rolling period, the grievance shall be paid at triple quadruple time the employee’s rate of pay for the hours specified in the first paragraph of this subsection.
Additional Work If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by both Parties before performance of such services, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.
Design Professional The architect or engineer or architectural or engineering firm selected by Owner (i) for the design and preparation of Contract Documents governing the construction of a Project, or (ii) for construction contract administration under the Contract Documents, or (iii) for both, all such services and the scope thereof to be set forth in the Design Professional Contract. The Design Professional is not an employee of the Owner but is engaged or retained by it for the purpose of performing design and construction administration services for the project. The term “Design Professional” includes architects, engineers, surveyors, designers, and other consultants retained by the Design Professional.
Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.
Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.
Working Facilities During the Term of Employment, the Company shall furnish the Executive with an office, secretarial help and such other facilities and services suitable to his position and adequate for the performance of his duties hereunder.
Other Than Normal Working Hours Non-prevailing Wage Rate Projects: Work performed from 4:00 p.m. to 7:00 a.m. Monday to Friday, and any time Saturday, Sunday, and Holidays. The Contractor will perform Tasks during Other Than Normal Working Hours for the Unit Price set forth in the CTC multiplied by the Adjustment Factor of: 1.
Construction Phase Services 3.1.1 – Basic Construction Services
Project Coordination The Engineer shall coordinate all subconsultant activity to include quality and consistency of deliverables and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.