Fire Extinguishing -- Sample Clauses

Fire Extinguishing --. We" do not pay expenses incurred to put out a fire.
AutoNDA by SimpleDocs
Fire Extinguishing --. There is a line for fire extinguishing surrounding the entire lot. There is a hydrant system in the building and in the yard – All according to current situation AS IS . The current existing sprinkler system, including the water reservoir on the lot is being provided AS IS. In the event that the lessee will be required to carry out adjustments and / or additions and or improvements in the fire extinguishing system and / or in the water reservoir and or in the pumps as the fire department may require, for whatever reason, then implementation of the above-mentioned adjustments and / or additions and / or improvements shall be carried out by the lessee and at its expense alone. In any event, the lessor shall not be responsible for adjusting the fire extinguishing system and / or the water reservoir and / or the pumps for the lessee’s needs. There is an emergency generator for operating only smoke release blowers. The lessee shall bear the cost of maintaining the generator.

Related to Fire Extinguishing --

  • Fire Extinguishers Provide UL-listed extinguishers, cabinets and accessories from a single manufacturer such as X.X. Industries or Xxxxxx’x Manufacturing Company that comply with local fire marshal approval. 12.1 Systems Furnishings: Systems furnishings will be supplied and installed by the State. It will be the Lessor’s responsibility to complete the electrical connections from the building electrical grid to the power connections or power poles for the system furnishings (see Division 16, Electrical).

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Sprinklers Subject to any terms, conditions and limitations set forth herein, Landlord shall provide an operative sprinkler system consisting of mains, laterals, and heads “AS IS” on the date of delivery of the Premises to Tenant. Tenant shall pay for piping distribution, drops and relocation of, or additional, sprinkler system heads and Building firehose or firehose valve cabinets, if Tenant’s Plans and/or any applicable Laws necessitate such.

  • Elements Defines the individual components under each indicator

  • Collapse a. The coverage provided under this Additional Coverage – Collapse applies only to an abrupt collapse. b. For the purpose of this Additional Coverage c. This Additional Coverage – Collapse does not apply to: (1) A building or any part of a building that is in danger of falling down or caving in; (2) A part of a building that is standing, even if it has separated from another part of the building; or (3) A building or any part of a building that is standing, even if it shows evidence of cracking, bulging, sagging, bending, leaning, settling, shrinkage or expansion. d. We insure for direct physical loss to covered property involving abrupt collapse of a building or any part of a building if such collapse was caused by one or more of the following: (1) The Perils Insured Against named under Coverage C; (2) Decay, of a building or any part of a building, that is hidden from view, unless the presence of such decay is known to an "insured" prior to collapse; (3) Insect or vermin damage, to a building or any part of a building, that is hidden from view, unless the presence of such damage is known to an "insured" prior to collapse; (4) Weight of contents, equipment, animals or people; (5) Weight of rain which collects on a roof; or (6) Use of defective material or methods in construction, remodeling or renovation if the collapse occurs during the course of the construction, remodeling or renovation. e. Loss to an awning, fence, patio, deck, pavement, swimming pool, underground pipe, flue, drain, cesspool, septic tank, foundation, retaining wall, bulkhead, pier, wharf or dock is not included under d.(2) through (6) above, unless the loss is a direct result of the collapse of a building or any part of a building. f. This coverage does not increase the limit of liability that applies to the damaged covered property.

  • Mowing a. Mowing height for Bahia turf shall be a uniform cut at three (3) inches and shall not be permitted to grow to more than four (4) inches. b. Turf shall be mowed once per (1) week from March 1 through October 31 and once every two (2) weeks from November 1 through February 28.

  • Leakage 5.1 The Sellers undertake to the Buyer to pay to the Buyer on demand an amount equal to any Leakage Amount (Leakage Demand) plus costs and expenses (together with any irrecoverable VAT thereon) reasonably and properly incurred by the Buyer and/or the Company in relation to the Leakage Demand. 5.2 Any demand for payment under clause 5.1 is invalid and the Sellers shall not be liable under clause 5.1 unless such demand is notified to the Sellers on or before the date falling 9 months after the Completion Date, setting out reasonable details of the Leakage (including the matter or thing giving rise to the relevant Leakage and the Leakage Amount (where known), together (where calculable) with the amount repayable by the Sellers). 5.3 The Buyer’s only remedy in relation to Leakage is that contained in this clause 5. 5.4 The Sellers shall have ten Business Days upon receipt of a Leakage Demand to state in writing whether or not they agree with it or in the case of disagreement, the areas of dispute. If the Sellers do not respond to the Buyer they will be deemed to have agreed the Leakage Demand and it shall become final and binding on the Sellers and the Buyer. 5.5 If the Sellers agree the Leakage Demand (with such amendments thereto as the Sellers and the Buyer may agree in writing) the Leakage Demand shall become final and binding on the Sellers and the Buyer. 5.6 If the Sellers disagree with the Leakage Demand, the parties shall endeavour in good faith to agree any matter in dispute and if the matter is resolved by agreement (with such amendments thereto as the Sellers and the Buyer may agree in writing) then the Leakage Demand shall become final and binding on the Sellers and the Buyer. In the event that the parties are unable to reach agreement on a disputed Leakage Demand, any party may notify the other in writing that it wishes to refer the Leakage Demand (or any part which remains unsettled and has not been withdrawn) to an Expert (as defined below) for determination, such notification to identify the matters in dispute (the “Referral Notice”). The identity of such Expert shall be agreed between the parties and the Expert shall be appointed within 15 Business Days of a Referral Notice being served (the “Expert Appointment Period”). If the parties fail to agree the identity of the Expert within the Appointment Period, an Expert shall be appointed by the President for the time being of the Institute of Chartered Accountants in England and Wales within 10 Business Days of the expiry of the Expert Appointment Period, on the application of any party. The Expert shall be provided with a copy of the Referral Notice by either party and shall be instructed to determine the matters in dispute in relation to the Leakage Demand (but no other matter) in accordance with the provisions of this agreement and to make such determination as soon as practicable and in any event within 10 Business Days of the Expert being instructed or such longer period as the Expert shall, in the Expert’s discretion, reasonably require. In making such determination, the Expert shall act as an expert and not as an arbitrator and his decision shall (in the absence of manifest error) be final and binding on the parties. The costs of the Expert shall be borne in such proportions as the Expert may direct or, in the absence of such direction, as to one half by the Buyer and the other half by the Sellers pro-rata to their holdings of Sale Shares as amongst themselves. For the purposes of this agreement, “Expert” means a partner of at least 5 years’ standing at an independent leading UK firm of accountants.

  • Data shared with Subcontractors If DSHS Data provided under this Contract is to be shared with a subcontractor, the Contract with the subcontractor must include all of the data security provisions within this Contract and within any amendments, attachments, or exhibits within this Contract. If the Contractor cannot protect the Data as articulated within this Contract, then the contract with the sub- Contractor must be submitted to the DSHS Contact specified for this contract for review and approval.

  • GLASS The Tenant shall maintain the glass part of the demised premises, promptly replacing any breakage and fully saving the Landlord harmless from any loss, cost or damage resulting from such breakage or the replacement thereof.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!