Firm Experience. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $1,056 PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF Identify the team’s project experience most relevant to the scope in the advertisement. The projects should be limited to a total of 20, with no more than 5 projects being represented by the prime consultant and with no more than 3 projects represented by each sub-consultant on the team. If more than 5 projects are identified for the prime consultant, all projects identified after the first 5 will not be evaluated. If more than 3 projects are identified for a single sub-consultant, all projects identified after the first 3 from that sub-consultant will not be evaluated. Include no more than one page per project. Projects identified shall only include work performed by firms on the team. The projects identified do not necessarily need to have been DOTD projects. This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, in place cement stabilized base course, asphalt concrete overlay and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxx Xxxxxxx, III; Xxxxxx Xxxxxx, PE; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD Natchez Drive Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.012856 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 07/22 Total consultant contract cost ($1,000’s) $109 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $802 • Construction Administration • Resident Inspection • Drainage Repairs – 60 LF • Asphalt Repairs - 5,084 SY This project is a roadway rehabilitation project that includes drainage, grading, milling, full depth asphalt replacements, and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name XxXXXX Xxxxxxxx Drive @ US 000 (Xxxxx Xxxx)(CE&I) Firm responsibility (prime or sub?) Prime Project number H.013381 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 10/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $358 This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, and concrete driveway, curb and roadway replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Drainage Repairs - 297 LF • Asphalt Repairs - 2,515 SY The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxxx, P.E.; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name Xxxxxxxxx Canal Drainage Basin Infrastructure Repairs Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx, P.E. Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 06/13 Total consultant contract cost ($1,000’s) $14,524 Services completed by this firm (mm/yy) 12/20 Cost of consultant services provided by this firm ($1,000’s) $1,566 PROJECT HIGHLIGHTS • Civil Design/Survey/CA/RI • Drainage Repairs - 10,464 LF • Sewer Repairs - 42,259 LF • Concrete Repair - 65,569 SY • Asphalt Repairs - 37,902 SY • FEMA, FHWA, DOTD, USACE, SLFPA Coordination As a result of Hurricane Katrina, City of Slidell was inundated with several feet of water causing damage to all public and private facilities and damaging roadway bases and utilities. The City of Slidell hired All South to evaluate the condition of the roadways and utilities. Through our vast experience, All South understands the justification required to ensure eligibility. Once the scope of work was identified, our firm worked with the City, the State (GOHSEP) and the federal government (FEMA) to develop the project worksheets to justify the funds. Once the Project Worksheets were written, All South prepared construction documents for public bid. All along this process, we continually worked with FEMA and GOHSEP to ensure all damage elements were captured and included in the repairs. Our team completed a construction project in the Xxxxxxxxx Canal Drainage Basin (Xxxxxxxxx I) and just completed construction on another phase of these repairs (Xxxxxxxxx II). All South performed the construction management and inspection duties for the Xxxxxxxxx I Construction Project. To ensure the construction is completed as directed in the plans and specifications and within the allotted time and within budget, our team conducted monthly onsite progress meetings with the owner and contractor, along with periodic site inspections. To ensure all repairs were completed and recorded properly, All South diligently reviewed all inspection reports, logs all completed repairs and maintains as-built construction plans. During all phases of this project, All South worked with the City of Slidell on filling out the appropriate payment applications and ensure that all possible federal funds are captured. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxxx “Xxxxx’ Xxxxxxxx Firm name All South Consulting Engineer, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name DPW Capital Improvements Program Audubon, Black Pearl, East Carrollton, Uptown, West Riverside Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of New Orleans Project location New Orleans, Louisiana Owner’s Project Manager Xxxxx Xxxxxxxx Owner’s address, phone, email 0000 Xxxxxxx Xx., Xxx Xxxxxxx, Xxxxxxxxx 00000, (000) 000-0000, xxxxxxxxxxx@xxxx.xxx Services commenced by this firm (mm/yy) 11/13 Total consultant contract cost ($1,000’s) $33,570 Services completed by this firm (mm/yy) Ongoing Cost of consultant services provided by this firm ($1,000’s) $3,456 • Civil Design/Survey/CA/RI • Concrete Repairs - 25,436 SY • Asphalt Repairs - 252,509 SY • ADA Ramp Repairs - 9,060 SY • Drainage Repairs - 24,284 LF • Sewer Repairs - 24,200 LF • Water Repairs - 17,834 LF • FEMA, SWBNO, SLFPA-E, LaDOTD, FHWA, Coordination All South Consulting Engineers is currently providing professional engineering services as part of the recovery roads program for several neighborhoods in Uptown New Orleans. This work is part of the FEMA funded Capital Improvements Program, a program that is available to areas that were inundated in a disaster. The scope of services included assessing the damage to roadways, curbs, sidewalks, driveways, ADA ramps, and comparing that damage to the assessment in the FEMA project worksheets. The project scope also included adding in additional pavement repairs caused by demolition of properties as well as repairs for purposes of constructability. As part of this assessment, All South individually inspected each of the streets in these neighborhoods. Following the completion of the Project Scoping Report, All South negotiated on behalf of the City with FEMA to resolve discrepancies between the project worksheets and the Scoping Report. Once final design is completed, All South will produce construction documents, manage the advertisement and bidding of the project, and will provide contract administration and resident inspection for the FEMA-eligible roadway improvements inside the project area. To ensure the accuracy of project quantity totals and costs throughout the life of these projects, All South provides the City with recorded quantities and observations via customized daily work reports. These reports are used by All South and DPW to guarantee accuracy of project quantities used in Contractor invoicing to anticipate quantity overruns/underruns and keep projects on schedule. All South has extensive familiarity with construction projects throughout the region in reviewing reports and verifying Contractor monthly invoices with various platforms and software. All South uses this experience to optimize the product for DPW New Orleans. All South also submits innovative, customized daily photo work reports which include inspection photos with relevant descriptions of the work being performed. This is included separately with each daily work report done by the inspector. All South Staff: Xxxxxxx Xxxxxx, Xxxx Xxxxxxx, Xx., PE; PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxx Xxxxxxxxxxxx; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxx Xxxx
Appears in 3 contracts
Samples: Entity Contract, Entity Contract, Entity Contract
Firm Experience. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $1,056 PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF Identify the team’s project experience most relevant to the scope in the advertisement. The projects should be limited to a total of 20, with no more than 5 projects being represented by the prime consultant and with no more than 3 projects represented by each sub-consultant on the team. If more than 5 projects are identified for the prime consultant, all projects identified after the first 5 will not be evaluated. If more than 3 projects are identified for a single sub-consultant, all projects identified after the first 3 from that sub-consultant will not be evaluated. Include no more than one page per project. Projects identified shall only include work performed by firms on the team. The projects identified do not necessarily need to have been DOTD projects. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) Ongoing Cost of consultant services provided by this firm ($1,000’s) $1,056 This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, in place cement stabilized base course, asphalt concrete overlay and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxx Xxxxxxx, III; Xxxxxx Xxxxxx, PE; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD Natchez Drive Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.012856 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 07/22 Total consultant contract cost ($1,000’s) $109 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $802 • Construction Administration • Resident Inspection • Drainage Repairs – 60 LF • Asphalt Repairs - 5,084 SY This project is a roadway rehabilitation project that includes drainage, grading, milling, full depth asphalt replacements, and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name XxXXXX Xxxxxxxx Drive @ US 000 (Xxxxx Xxxx)(CE&I) Firm responsibility (prime or sub?) Prime Project number H.013381 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 10/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $358 This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, and concrete driveway, curb and roadway replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Drainage Repairs - 297 LF • Asphalt Repairs - 2,515 SY The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxxx, P.E.; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name Xxxxxxxxx Canal Drainage Basin Infrastructure Repairs Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx, P.E. Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 06/13 Total consultant contract cost ($1,000’s) $14,524 Services completed by this firm (mm/yy) 12/20 Cost of consultant services provided by this firm ($1,000’s) $1,566 PROJECT HIGHLIGHTS • Civil Design/Survey/CA/RI • Drainage Repairs - 10,464 LF • Sewer Repairs - 42,259 LF • Concrete Repair - 65,569 SY • Asphalt Repairs - 37,902 SY • FEMA, FHWA, DOTD, USACE, SLFPA Coordination As a result of Hurricane Katrina, City of Slidell was inundated with several feet of water causing damage to all public and private facilities and damaging roadway bases and utilities. The City of Slidell hired All South to evaluate the condition of the roadways and utilities. Through our vast experience, All South understands the justification required to ensure eligibility. Once the scope of work was identified, our firm worked with the City, the State (GOHSEP) and the federal government (FEMA) to develop the project worksheets to justify the funds. Once the Project Worksheets were written, All South prepared construction documents for public bid. All along this process, we continually worked with FEMA and GOHSEP to ensure all damage elements were captured and included in the repairs. Our team completed a construction project in the Xxxxxxxxx Canal Drainage Basin (Xxxxxxxxx I) and just completed construction on another phase of these repairs (Xxxxxxxxx II). All South performed the construction management and inspection duties for the Xxxxxxxxx I Construction Project. To ensure the construction is completed as directed in the plans and specifications and within the allotted time and within budget, our team conducted monthly onsite progress meetings with the owner and contractor, along with periodic site inspections. To ensure all repairs were completed and recorded properly, All South diligently reviewed all inspection reports, logs all completed repairs and maintains as-built construction plans. During all phases of this project, All South worked with the City of Slidell on filling out the appropriate payment applications and ensure that all possible federal funds are captured. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxxx “Xxxxx’ Xxxxxxxx Firm name All South Consulting Engineer, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name DPW Capital Improvements Program Audubon, Black Pearl, East Carrollton, Uptown, West Riverside Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of New Orleans Project location New Orleans, Louisiana Owner’s Project Manager Xxxxx Xxxxxxxx Owner’s address, phone, email 0000 Xxxxxxx Xx., Xxx Xxxxxxx, Xxxxxxxxx 00000, (000) 000-0000, xxxxxxxxxxx@xxxx.xxx Services commenced by this firm (mm/yy) 11/13 Total consultant contract cost ($1,000’s) $33,570 Services completed by this firm (mm/yy) Ongoing Cost of consultant services provided by this firm ($1,000’s) $3,456 • Civil Design/Survey/CA/RI • Concrete Repairs - 25,436 SY • Asphalt Repairs - 252,509 SY • ADA Ramp Repairs - 9,060 SY • Drainage Repairs - 24,284 LF • Sewer Repairs - 24,200 LF • Water Repairs - 17,834 LF • FEMA, SWBNO, SLFPA-E, LaDOTD, FHWA, Coordination All South Consulting Engineers is currently providing professional engineering services as part of the recovery roads program for several neighborhoods in Uptown New Orleans. This work is part of the FEMA funded Capital Improvements Program, a program that is available to areas that were inundated in a disaster. The scope of services included assessing the damage to roadways, curbs, sidewalks, driveways, ADA ramps, and comparing that damage to the assessment in the FEMA project worksheets. The project scope also included adding in additional pavement repairs caused by demolition of properties as well as repairs for purposes of constructability. As part of this assessment, All South individually inspected each of the streets in these neighborhoods. Following the completion of the Project Scoping Report, All South negotiated on behalf of the City with FEMA to resolve discrepancies between the project worksheets and the Scoping Report. Once final design is completed, All South will produce construction documents, manage the advertisement and bidding of the project, and will provide contract administration and resident inspection for the FEMA-eligible roadway improvements inside the project area. To ensure the accuracy of project quantity totals and costs throughout the life of these projects, All South provides the City with recorded quantities and observations via customized daily work reports. These reports are used by All South and DPW to guarantee accuracy of project quantities used in Contractor invoicing to anticipate quantity overruns/underruns and keep projects on schedule. All South has extensive familiarity with construction projects throughout the region in reviewing reports and verifying Contractor monthly invoices with various platforms and software. All South uses this experience to optimize the product for DPW New Orleans. All South also submits innovative, customized daily photo work reports which include inspection photos with relevant descriptions of the work being performed. This is included separately with each daily work report done by the inspector. All South Staff: Xxxxxxx Xxxxxx, Xxxx Xxxxxxx, Xx., PE; PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxx Xxxxxxxxxxxx; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxx Xxxx
Appears in 2 contracts
Samples: Consulting Services Agreement, Consultant Services Agreement
Firm Experience. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $1,056 PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF Identify the team’s project experience most relevant to the scope in the advertisement. The projects should be limited to a total of 20, with no more than 5 projects being represented by the prime consultant and with no more than 3 projects represented by each sub-consultant on the team. If more than 5 projects are identified for the prime consultant, all projects identified after the first 5 will not be evaluated. If more than 3 projects are identified for a single sub-consultant, all projects identified after the first 3 from that sub-consultant will not be evaluated. Include no more than one page per project. Projects identified shall only include work performed by firms on the team. The projects identified do not necessarily need to have been DOTD projects. This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, in place cement stabilized base course, asphalt concrete overlay and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxx Xxxxxxx, III; Xxxxxx Xxxxxx, PE; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting EngineersNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Survey, Other (SUE), Right-of-Way Project name LaDOTD Natchez Drive Rehabilitation Xxxxxx Xxxxx Bridge (CE&ILA 511) Design-Build Firm responsibility (prime or sub?) Prime Sub Project number H.012856 H.001779 Owner’s name City of Slidell LaDOTD Baton Rouge/ Xxxxx Construction/ Xxxxx & Associates, Inc. Project location SlidellBossier & Caddo Parishes, Louisiana LA Owner’s Project Manager Xxxxxx Xx. Xxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx00000 X. Xxxxxxxxx Xxxxx, XxxxxxxXxxxx Xxxxx, XX 00000, 00000 (000225) 000442-0000, xxxxxxx@xxxxxxxxxxxxx.xxx 6362 xxxxxxx@xxxx.xxx Services commenced by this firm (mm/yy) 07/22 01/23 Total consultant contract cost ($1,000’s) $109 1,140 Services completed by this firm (mm/yy) 06/23 On-going Cost of consultant services provided by this firm ($1,000’s) $802 • Construction Administration • Resident Inspection • Drainage Repairs – 60 LF • Asphalt Repairs - 5,084 SY This 1,140 Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is a roadway rehabilitation project that includes drainagebeing used to represent. **This field cannot be left blank and N/A is not acceptable. The only past performance evaluation disciplines to be used are: Road, gradingBridge, millingTraffic, full depth asphalt replacementsCE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing static GPS control, topographic and property surveying services, traffic control, utility coordination services, QL A, B, C, & D utility designating/locating, as well as preparing title takeoffs, 60% Right-of- Way Maps, Final Right-of-Way Maps, and concrete driveway and curb replacementslegal descriptions for the design-build project to replace the Xxxxx Xxxxx Bridge across the Red River. The scope of this project is funded under consists of constructing a new four lane structure carrying LA 511 across the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is Red River, repurposing the existing Xxxxxx Xxxxx Bridge as Construction Administrators and a Linear Park to provide Resident Inspection bicycle and pedestrian facilities, converting LA 511 (Xxxxxx Xxxxx Hwy) into a four-lane, median-divided highway on the east side of bridge; as well as providing full access interchanges between LA 511 and Xxxxx Xxxx Memorial Parkway and Xxxxxx Xxx Xxxxxx Parkway. NTBA designed and implemented a Traffic Control Plan for the projectsproject’s bridge closure which was completed during night shifts to ensure safety and avoid travel disruptions. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect NTBA verified the construction. The project is governed horizontal and vertical control set by LaDOTD standard specificationsduring the original survey and verified the vertical control for both sides by running digital levels across the bridge, which was not performed in the original survey. All construction related documentation must For property surveys, title take-offs were attained for approximately 50 properties adjacent to the route and a property survey submittal prepared with apparent right-of-way shown. 60% Base Right-of-Way Maps are being prepared for approximately 15 parcels that will require right-of-way taking. There will be submitted through Sitemanager and approximately 13 ROW Plan Sheets. NTBA is identifying all materials used utilities in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of conflict with the construction documents, and coordinating any required utility coordination, employee interviews for Xxxxx Xxxxx compliance adjustments with the utility owner. NTBA is utilizing the Louisiana Department of Transportation Survey and delivering EEO notices to the contractorsDesign Manual Addendum A as well as CI/ASCE Standard 38-02. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxxxx Xxxxxx Firm name All South Consulting EngineersNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Survey & Right-of-Way Project name XxXXXX Xxxxxxxx Drive @ US 000 (Xxxxx Xxxx)(CE&I) Rural Bridge Replacement Initiative Phase II Firm responsibility (prime or sub?) Prime Sub Project number H.013381 4400019338 Owner’s name City of Slidell LaDOTD Baton Rouge/ Sigma Project location SlidellDistricts 02, Louisiana 03, 07, 61, & 62 Owner’s Project Manager Xx. Xxxxxx Xxxxxx X. Lear, Jr., PE, LS Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, 00000 Xxxxxxx Xxxxxxx, Xxxxx Xxxxx, XX 00000, 00000 (000225) 000298-0000, xxxxxxx@xxxxxxxxxxxxx.xxx 0800 xxxxx@xxxxxxx.xxx Services commenced by this firm (mm/yy) 10/22 09/20 Total consultant contract cost ($1,000’s) $93 1,210.2 Services completed by this firm (mm/yy) 06/23 On-going Cost of consultant services provided by this firm ($1,000’s) $358 This 1,210.2 Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is a roadway rehabilitation project that includes drainagebeing used to represent. **This field cannot be left blank and N/A is not acceptable. The only past performance evaluation disciplines to be used are: Road, millingBridge, full depth asphalt replacementsTraffic, CE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing GPS Control surveys, topographic surveys, property surveys, title take-offs, legal description preparation, preliminary and final right-of-way mapping, and concrete drivewayQL C & D subsurface utility services for 21 bridge and culvert replacements throughout South Louisiana. Topographic surveying includes surveying of all sub-surface drainage structures, curb 200 feet upstream and roadway replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankmentsdownstream with cross-sections every 50 feet along channels, concrete or asphalt in order to be eligible to inspect the construction. PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Drainage Repairs - 297 LF • Asphalt Repairs - 2,515 SY The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantitiesdeck gutter lines, daily engineer diariescenterline of joints, change orderslow chord elevations, material testing, mix designs, estimates, work summariesbent locations, and RFIsright-of-way 800 feet either side of structure. All South is also responsible for field changes, translation of the construction documents, Subsurface utility coordination, employee interviews for Xxxxx Xxxxx compliance engineering services include QL C and delivering EEO notices QL D utility mapping. NTBA produced electronic topographic drawings in MicroStation depicting all utility and topographic information. Data was provided to the contractorsengineering consultant for incorporation into their hydraulic model being utilized to evaluate the system. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxxx, P.E.; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting EngineersNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Survey & Right-of-Way Project name Xxxxxxxxx Canal Drainage Basin Infrastructure Repairs Rural Bridge Replacement Initiative Phase II Firm responsibility (prime or sub?) Prime Sub Project number N/A 4400019337 Owner’s name City of Slidell LaDOTD Baton Rouge/ Xxxx-Xxxxxxxxxx, Inc. Project location SlidellDistricts 05, Louisiana 08, and 58 Owner’s Project Manager Xxxxxx Xxxxxx, P.E. Xx. Xxxxxxxx Xxxxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxx Xxxxxx, Xxx Xxxxxxx, XX 00000, 00000 (000504) 000486-0000, xxxxxxx@xxxxxxxxxxxxx.xxx 5901 xxxxxxxxx@xxxxxx.xxx Services commenced by this firm (mm/yy) 06/13 09/20 Total consultant contract cost ($1,000’s) $14,524 1,855.6 Services completed by this firm (mm/yy) 12/20 On-going Cost of consultant services provided by this firm ($1,000’s) $1,566 PROJECT HIGHLIGHTS • Civil Design1,855.6 Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is being used to represent. **This field cannot be left blank and N/Survey/CA/RI • Drainage Repairs - 10,464 LF • Sewer Repairs - 42,259 LF • Concrete Repair - 65,569 SY • Asphalt Repairs - 37,902 SY • FEMA, FHWA, DOTD, USACE, SLFPA Coordination As a result of Hurricane Katrina, City of Slidell was inundated with several feet of water causing damage to all public and private facilities and damaging roadway bases and utilitiesA is not acceptable. The City only past performance evaluation disciplines to be used are: Road, Bridge, Traffic, CE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing GPS Control surveys, topographic surveys, property surveys, title take-offs, legal description preparation, preliminary and final right-of-way mapping, and QL C & D subsurface utility services for 34 bridge and culvert replacements throughout Central Louisiana. Topographic surveying utilizing HDS 3D Terrestrial Laser Scanning methods includes surveying of Slidell hired All South all sub-surface drainage structures, 200 feet upstream and downstream with cross-sections every 50 feet along channels, deck gutter lines, centerline of joints, low chord elevations, bent locations, and right-of-way 800 feet either side of structure. Subsurface utility engineering services include QL C and D utility mapping. NTBA produced electronic topographic drawings in MicroStation depicting all utility and topographic information. Data was provided to the engineering consultant for incorporation into their hydraulic model being utilized to evaluate the condition system. Currently, NTBA is performing boundary surveys on 73 parcels at 18 different bridge locations. This includes surveying each parcel affected by either construction servitude or additional right-of-way requirements as well as production of the roadways property survey submittal, preliminary and utilitiesfinal right-of-way maps, and parcel descriptions. Through our vast experience, All South understands the justification required to ensure eligibility. Once the scope of work was identified, our firm worked services are being completed in accordance with the City, the State (GOHSEP) Location and the federal government (FEMA) to develop the project worksheets to justify the fundsSurvey Manual Addendum 1 and all currently accepted Location and Survey Automated procedures. Once the Project Worksheets were written, All South prepared construction documents for public bid. All along this process, we continually worked with FEMA and GOHSEP to ensure all damage elements were captured and included in the repairs. Our team completed a construction project in the Xxxxxxxxx Canal Drainage Basin (Xxxxxxxxx I) and just completed construction on another phase of these repairs (Xxxxxxxxx II). All South performed the construction management and inspection duties for the Xxxxxxxxx I Construction Project. To ensure the construction is completed as directed in the plans and specifications and within the allotted time and within budget, our team conducted monthly onsite progress meetings with the owner and contractor, along with periodic site inspections. To ensure all repairs were completed and recorded properly, All South diligently reviewed all inspection reports, logs all completed repairs and maintains as-built construction plans. During all phases of this project, All South worked with the City of Slidell on filling out the appropriate payment applications and ensure that all possible federal funds are captured. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxxx “Xxxxx’ Xxxxxxxx Firm name All South Consulting EngineerNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Right-of-Way Project name DPW Capital Improvements IIJA Off System Bridge Program Audubon, Black Pearl, East Carrollton, Uptown, West Riverside – E. Lewiston Rd. over Wilson Branch ROW Firm responsibility (prime or sub?) Prime Sub Project number N/A H.015404 Owner’s name City of New Orleans LaDOTD Baton Rouge/ Sigma Project location New OrleansTangipahoa Parish, Louisiana LA Owner’s Project Manager Xxxxx Xxxxxxxx Xx. Xxxxxx X. Lear, Jr., PE, LS Owner’s address, phone, email 0000 00000 Xxxxxxx Xx., Xxx Xxxxxxx, Xxxxxxxxx 00000Xxxxx Xxxxx, XX 00000 (000225) 000298-0000, xxxxxxxxxxx@xxxx.xxx 0800 xxxxx@xxxxxxx.xxx Services commenced by this firm (mm/yy) 11/13 07/23 Total consultant contract cost ($1,000’s) $33,570 13.6 Services completed by this firm (mm/yy) Ongoing On-going Cost of consultant services provided by this firm ($1,000’s) $3,456 • Civil Design13.6 Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is being used to represent. **This field cannot be left blank and N/A is not acceptable. The only past performance evaluation disciplines to be used are: Road, Bridge, Traffic, CE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing property surveys, title take-offs, legal description preparation, and preliminary and final right-of-way mapping for the E. Lewiston Rd bridge over Wilson Branch. Title take-offs for all affected properties along the project’s alignment were obtained and reviewed along with any provided title research reports to determine the property line locations and prepare necessary files for survey crews to locate property corners and establish property lines. A Property Survey Map conforming to the requirements of the Location & Survey Manual Addendum A was prepared showing all surveyed property lines and existing right-of-way lines with ties to the project centerline/CA/RI • Concrete Repairs - 25,436 SY • Asphalt Repairs - 252,509 SY • ADA Ramp Repairs - 9,060 SY • Drainage Repairs - 24,284 LF • Sewer Repairs - 24,200 LF • Water Repairs - 17,834 LF • FEMAbaseline. An ASCII file listing coordinates and descriptions of all found monuments, SWBNOpdf copies of all documents and title work used to determine property lines, SLFPAand a DGN and PDF of the Property Survey Map were transmitted to the Sigma for submittal and their use. NTBA produced electronic property survey drawings in MicroStation depicting all found boundary information. Once the final required property takings are determined, NTBA will prepare 60% Base Right-Eof-Way Maps, LaDOTDFinal Right-of-Way Maps, FHWA, Coordination All South Consulting Engineers is currently providing professional engineering services and prepare legal descriptions for any properties that are being acquired as part of the recovery roads program for several neighborhoods in Uptown New Orleansthis project. This work project is a part of the FEMA funded Capital Improvements ProgramInfrastructure Investment and Jobs Act (IIJA) and must follow all local, a program that is available to areas that were inundated in a disaster. The scope of services included assessing the damage to roadways, curbs, sidewalks, driveways, ADA rampsstate, and comparing that damage to the assessment in the FEMA project worksheets. The project scope also included adding in additional pavement repairs caused by demolition of properties as well as repairs for purposes of constructability. As part of this assessment, All South individually inspected each of the streets in these neighborhoods. Following the completion of the Project Scoping Report, All South negotiated on behalf of the City with FEMA to resolve discrepancies between the project worksheets and the Scoping Report. Once final design is completed, All South will produce construction documents, manage the advertisement and bidding of the project, and will provide contract administration and resident inspection for the FEMA-eligible roadway improvements inside the project area. To ensure the accuracy of project quantity totals and costs throughout the life of these projects, All South provides the City with recorded quantities and observations via customized daily work reports. These reports are used by All South and DPW to guarantee accuracy of project quantities used in Contractor invoicing to anticipate quantity overruns/underruns and keep projects on schedule. All South has extensive familiarity with construction projects throughout the region in reviewing reports and verifying Contractor monthly invoices with various platforms and software. All South uses this experience to optimize the product for DPW New Orleans. All South also submits innovative, customized daily photo work reports which include inspection photos with relevant descriptions of the work being performed. This is included separately with each daily work report done by the inspector. All South Staff: Xxxxxxx Xxxxxx, Xxxx Xxxxxxx, Xxfederal guidelines., PE; PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxx Xxxxxxxxxxxx; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxx Xxxx
Appears in 1 contract
Samples: Professional Services
Firm Experience. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $1,056 PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF Identify the team’s project experience most relevant to the scope in the advertisement. The projects should be limited to a total of 20, with no more than 5 projects being represented by the prime consultant and with no more than 3 projects represented by each sub-consultant on the team. If more than 5 projects are identified for the prime consultant, all projects identified after the first 5 will not be evaluated. If more than 3 projects are identified for a single sub-consultant, all projects identified after the first 3 from that sub-consultant will not be evaluated. Include no more than one page per project. Projects identified shall only include work performed by firms on the team. The projects identified do not necessarily need to have been DOTD projects. This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, in place cement stabilized base course, asphalt concrete overlay and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxx Xxxxxxx, III; Xxxxxx Xxxxxx, PE; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting EngineersNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Survey, Other (SUE), Right-of-Way Project name LaDOTD Natchez Drive Rehabilitation Xxxxxx Xxxxx Bridge (CE&ILA 511) Design-Build Firm responsibility (prime or sub?) Prime Sub Project number H.012856 H.001779 Owner’s name City of Slidell LaDOTD Baton Rouge/ Xxxxx Construction/ Xxxxx & Associates, Inc. Project location SlidellBossier & Caddo Parishes, Louisiana LA Owner’s Project Manager Xxxxxx Xx. Xxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx00000 X. Xxxxxxxxx Xxxxx, XxxxxxxXxxxx Xxxxx, XX 00000, 00000 (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx 0000 xxxxxxx@xxxx.xxx Services commenced by this firm (mm/yy) 07/22 01/23 Total consultant contract cost ($1,000’s) $109 1,140 Services completed by this firm (mm/yy) 06/23 On-going Cost of consultant services provided by this firm ($1,000’s) $802 • Construction Administration • Resident Inspection • Drainage Repairs – 60 LF • Asphalt Repairs - 5,084 SY This 1,140 Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is a roadway rehabilitation project that includes drainagebeing used to represent. **This field cannot be left blank and N/A is not acceptable. The only past performance evaluation disciplines to be used are: Road, gradingBridge, millingTraffic, full depth asphalt replacementsCE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing static GPS control, topographic and property surveying services, traffic control, utility coordination services, QL A, B, C, & D utility designating/locating, as well as preparing title takeoffs, 60% Right-of- Way Maps, Final Right-of-Way Maps, and concrete driveway and curb replacementslegal descriptions for the design-build project to replace the Xxxxx Xxxxx Bridge across the Red River. The scope of this project is funded under consists of constructing a new four lane structure carrying LA 511 across the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is Red River, repurposing the existing Xxxxxx Xxxxx Bridge as Construction Administrators and a Linear Park to provide Resident Inspection bicycle and pedestrian facilities, converting LA 511 (Xxxxxx Xxxxx Hwy) into a four-lane, median-divided highway on the east side of bridge; as well as providing full access interchanges between LA 511 and Xxxxx Xxxx Memorial Parkway and Xxxxxx Xxx Xxxxxx Parkway. NTBA designed and implemented a Traffic Control Plan for the projectsproject’s bridge closure which was completed during night shifts to ensure safety and avoid travel disruptions. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect NTBA verified the construction. The project is governed horizontal and vertical control set by LaDOTD standard specificationsduring the original survey and verified the vertical control for both sides by running digital levels across the bridge, which was not performed in the original survey. All construction related documentation must For property surveys, title take-offs were attained for approximately 50 properties adjacent to the route and a property survey submittal prepared with apparent right-of-way shown. 60% Base Right-of-Way Maps are being prepared for approximately 15 parcels that will require right-of-way taking. There will be submitted through Sitemanager and approximately 13 ROW Plan Sheets. NTBA is identifying all materials used utilities in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of conflict with the construction documents, and coordinating any required utility coordination, employee interviews for Xxxxx Xxxxx compliance adjustments with the utility owner. NTBA is utilizing the Louisiana Department of Transportation Survey and delivering EEO notices to the contractorsDesign Manual Addendum A as well as CI/ASCE Standard 38-02. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxxxx Xxxxxx Firm name All South Consulting EngineersNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Survey & Right-of-Way Project name XxXXXX Xxxxxxxx Drive @ US 000 (Xxxxx Xxxx)(CE&I) Rural Bridge Replacement Initiative Phase II Firm responsibility (prime or sub?) Prime Sub Project number H.013381 4400019338 Owner’s name City of Slidell LaDOTD Baton Rouge/ Sigma Project location SlidellDistricts 02, Louisiana 03, 07, 61, & 62 Owner’s Project Manager Xx. Xxxxxx Xxxxxx X. Lear, Jr., PE, LS Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, 00000 Xxxxxxx Xxxxxxx, Xxxxx Xxxxx, XX 00000, 00000 (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx 0000 xxxxx@xxxxxxx.xxx Services commenced by this firm (mm/yy) 10/22 09/20 Total consultant contract cost ($1,000’s) $93 1,210.2 Services completed by this firm (mm/yy) 06/23 On-going Cost of consultant services provided by this firm ($1,000’s) $358 This 1,210.2 Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is a roadway rehabilitation project that includes drainagebeing used to represent. **This field cannot be left blank and N/A is not acceptable. The only past performance evaluation disciplines to be used are: Road, millingBridge, full depth asphalt replacementsTraffic, CE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing GPS Control surveys, topographic surveys, property surveys, title take-offs, legal description preparation, preliminary and final right-of-way mapping, and concrete drivewayQL C & D subsurface utility services for 21 bridge and culvert replacements throughout South Louisiana. Topographic surveying includes surveying of all sub-surface drainage structures, curb 200 feet upstream and roadway replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankmentsdownstream with cross-sections every 50 feet along channels, concrete or asphalt in order to be eligible to inspect the construction. PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Drainage Repairs - 297 LF • Asphalt Repairs - 2,515 SY The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantitiesdeck gutter lines, daily engineer diariescenterline of joints, change orderslow chord elevations, material testing, mix designs, estimates, work summariesbent locations, and RFIsright-of-way 800 feet either side of structure. All South is also responsible for field changes, translation of the construction documents, Subsurface utility coordination, employee interviews for Xxxxx Xxxxx compliance engineering services include QL C and delivering EEO notices QL D utility mapping. NTBA produced electronic topographic drawings in MicroStation depicting all utility and topographic information. Data was provided to the contractorsengineering consultant for incorporation into their hydraulic model being utilized to evaluate the system. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxxx, P.E.; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting EngineersNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Survey & Right-of-Way Project name Xxxxxxxxx Canal Drainage Basin Infrastructure Repairs Rural Bridge Replacement Initiative Phase II Firm responsibility (prime or sub?) Prime Sub Project number N/A 4400019337 Owner’s name City of Slidell LaDOTD Baton Rouge/ Xxxx-Xxxxxxxxxx, Inc. Project location SlidellDistricts 05, Louisiana 08, and 58 Owner’s Project Manager Xxxxxx Xxxxxx, P.E. Xx. Xxxxxxxx Xxxxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxx Xxxxxx, Xxx Xxxxxxx, XX 00000, 00000 (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx 0000 xxxxxxxxx@xxxxxx.xxx Services commenced by this firm (mm/yy) 06/13 09/20 Total consultant contract cost ($1,000’s) $14,524 1,855.6 Services completed by this firm (mm/yy) 12/20 On-going Cost of consultant services provided by this firm ($1,000’s) $1,566 PROJECT HIGHLIGHTS • Civil Design1,855.6 Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is being used to represent. **This field cannot be left blank and N/Survey/CA/RI • Drainage Repairs - 10,464 LF • Sewer Repairs - 42,259 LF • Concrete Repair - 65,569 SY • Asphalt Repairs - 37,902 SY • FEMA, FHWA, DOTD, USACE, SLFPA Coordination As a result of Hurricane Katrina, City of Slidell was inundated with several feet of water causing damage to all public and private facilities and damaging roadway bases and utilitiesA is not acceptable. The City only past performance evaluation disciplines to be used are: Road, Bridge, Traffic, CE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing GPS Control surveys, topographic surveys, property surveys, title take-offs, legal description preparation, preliminary and final right-of-way mapping, and QL C & D subsurface utility services for 34 bridge and culvert replacements throughout Central Louisiana. Topographic surveying utilizing HDS 3D Terrestrial Laser Scanning methods includes surveying of Slidell hired All South all sub-surface drainage structures, 200 feet upstream and downstream with cross-sections every 50 feet along channels, deck gutter lines, centerline of joints, low chord elevations, bent locations, and right-of-way 800 feet either side of structure. Subsurface utility engineering services include QL C and D utility mapping. NTBA produced electronic topographic drawings in MicroStation depicting all utility and topographic information. Data was provided to the engineering consultant for incorporation into their hydraulic model being utilized to evaluate the condition system. Currently, NTBA is performing boundary surveys on 73 parcels at 18 different bridge locations. This includes surveying each parcel affected by either construction servitude or additional right-of-way requirements as well as production of the roadways property survey submittal, preliminary and utilitiesfinal right-of-way maps, and parcel descriptions. Through our vast experience, All South understands the justification required to ensure eligibility. Once the scope of work was identified, our firm worked services are being completed in accordance with the City, the State (GOHSEP) Location and the federal government (FEMA) to develop the project worksheets to justify the fundsSurvey Manual Addendum 1 and all currently accepted Location and Survey Automated procedures. Once the Project Worksheets were written, All South prepared construction documents for public bid. All along this process, we continually worked with FEMA and GOHSEP to ensure all damage elements were captured and included in the repairs. Our team completed a construction project in the Xxxxxxxxx Canal Drainage Basin (Xxxxxxxxx I) and just completed construction on another phase of these repairs (Xxxxxxxxx II). All South performed the construction management and inspection duties for the Xxxxxxxxx I Construction Project. To ensure the construction is completed as directed in the plans and specifications and within the allotted time and within budget, our team conducted monthly onsite progress meetings with the owner and contractor, along with periodic site inspections. To ensure all repairs were completed and recorded properly, All South diligently reviewed all inspection reports, logs all completed repairs and maintains as-built construction plans. During all phases of this project, All South worked with the City of Slidell on filling out the appropriate payment applications and ensure that all possible federal funds are captured. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxxx “Xxxxx’ Xxxxxxxx Firm name All South Consulting EngineerNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Right-of-Way Project name DPW Capital Improvements IIJA Off System Bridge Program Audubon, Black Pearl, East Carrollton, Uptown, West Riverside – E. Lewiston Rd. over Wilson Branch ROW Firm responsibility (prime or sub?) Prime Sub Project number N/A H.015404 Owner’s name City of New Orleans LaDOTD Baton Rouge/ Sigma Project location New OrleansTangipahoa Parish, Louisiana LA Owner’s Project Manager Xxxxx Xxxxxxxx Xx. Xxxxxx X. Lear, Jr., PE, LS Owner’s address, phone, email 0000 00000 Xxxxxxx Xx., Xxx Xxxxxxx, Xxxxxxxxx 00000Xxxxx Xxxxx, XX 00000 (000) 000-0000, xxxxxxxxxxx@xxxx.xxx 0000 xxxxx@xxxxxxx.xxx Services commenced by this firm (mm/yy) 11/13 07/23 Total consultant contract cost ($1,000’s) $33,570 13.6 Services completed by this firm (mm/yy) Ongoing On-going Cost of consultant services provided by this firm ($1,000’s) $3,456 • Civil Design13.6 Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is being used to represent. **This field cannot be left blank and N/A is not acceptable. The only past performance evaluation disciplines to be used are: Road, Bridge, Traffic, CE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing property surveys, title take-offs, legal description preparation, and preliminary and final right-of-way mapping for the E. Lewiston Rd bridge over Wilson Branch. Title take-offs for all affected properties along the project’s alignment were obtained and reviewed along with any provided title research reports to determine the property line locations and prepare necessary files for survey crews to locate property corners and establish property lines. A Property Survey Map conforming to the requirements of the Location & Survey Manual Addendum A was prepared showing all surveyed property lines and existing right-of-way lines with ties to the project centerline/CA/RI • Concrete Repairs - 25,436 SY • Asphalt Repairs - 252,509 SY • ADA Ramp Repairs - 9,060 SY • Drainage Repairs - 24,284 LF • Sewer Repairs - 24,200 LF • Water Repairs - 17,834 LF • FEMAbaseline. An ASCII file listing coordinates and descriptions of all found monuments, SWBNOpdf copies of all documents and title work used to determine property lines, SLFPAand a DGN and PDF of the Property Survey Map were transmitted to the Sigma for submittal and their use. NTBA produced electronic property survey drawings in MicroStation depicting all found boundary information. Once the final required property takings are determined, NTBA will prepare 60% Base Right-Eof-Way Maps, LaDOTDFinal Right-of-Way Maps, FHWA, Coordination All South Consulting Engineers is currently providing professional engineering services and prepare legal descriptions for any properties that are being acquired as part of the recovery roads program for several neighborhoods in Uptown New Orleansthis project. This work project is a part of the FEMA funded Capital Improvements ProgramInfrastructure Investment and Jobs Act (IIJA) and must follow all local, a program that is available to areas that were inundated in a disaster. The scope of services included assessing the damage to roadways, curbs, sidewalks, driveways, ADA rampsstate, and comparing that damage to the assessment in the FEMA project worksheets. The project scope also included adding in additional pavement repairs caused by demolition of properties as well as repairs for purposes of constructability. As part of this assessment, All South individually inspected each of the streets in these neighborhoods. Following the completion of the Project Scoping Report, All South negotiated on behalf of the City with FEMA to resolve discrepancies between the project worksheets and the Scoping Report. Once final design is completed, All South will produce construction documents, manage the advertisement and bidding of the project, and will provide contract administration and resident inspection for the FEMA-eligible roadway improvements inside the project area. To ensure the accuracy of project quantity totals and costs throughout the life of these projects, All South provides the City with recorded quantities and observations via customized daily work reports. These reports are used by All South and DPW to guarantee accuracy of project quantities used in Contractor invoicing to anticipate quantity overruns/underruns and keep projects on schedule. All South has extensive familiarity with construction projects throughout the region in reviewing reports and verifying Contractor monthly invoices with various platforms and software. All South uses this experience to optimize the product for DPW New Orleans. All South also submits innovative, customized daily photo work reports which include inspection photos with relevant descriptions of the work being performed. This is included separately with each daily work report done by the inspector. All South Staff: Xxxxxxx Xxxxxx, Xxxx Xxxxxxx, Xxfederal guidelines., PE; PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxx Xxxxxxxxxxxx; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxx Xxxx
Appears in 1 contract
Samples: Idiq Contract for Professional Boundary Surveying Services
Firm Experience. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $1,056 PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF Identify the team’s project experience most relevant to the scope in the advertisement. The projects should be limited to a total of 20, with no more than 5 projects being represented by the prime consultant and with no more than 3 projects represented by each sub-consultant on the team. If more than 5 projects are identified for the prime consultant, all projects identified after the first 5 will not be evaluated. If more than 3 projects are identified for a single sub-consultant, all projects identified after the first 3 from that sub-consultant will not be evaluated. Include no more than one page per project. Projects identified shall only include work performed by firms on the team. The projects identified do not necessarily need to have been DOTD projects. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $1,056 • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, in place cement stabilized base course, asphalt concrete overlay and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. <.. image(A picture containing sky, ground, outdoor, dirt Description automatically generated) removed ..> <.. image(A picture containing sky, ground, outdoor, dirt Description automatically generated) removed ..> The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxx Xxxxxxx, III; Xxxxxx Xxxxxx, PE; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD Natchez Drive Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.012856 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 07/22 Total consultant contract cost ($1,000’s) $109 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $802 • Construction Administration • Resident Inspection • Drainage Repairs – 60 LF • Asphalt Repairs - 5,084 SY This project is a roadway rehabilitation project that includes drainage, grading, milling, full depth asphalt replacements, and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name XxXXXX Xxxxxxxx Drive @ US 000 (Xxxxx Xxxx)(CE&I) Firm responsibility (prime or sub?) Prime Project number H.013381 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 10/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $358 This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, and concrete driveway, curb and roadway replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Drainage Repairs - 297 LF • Asphalt Repairs - 2,515 SY The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxxx, P.E.; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name Xxxxxxxxx Canal Drainage Basin Infrastructure Repairs Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx, P.E. Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 06/13 Total consultant contract cost ($1,000’s) $14,524 Services completed by this firm (mm/yy) 12/20 Cost of consultant services provided by this firm ($1,000’s) $1,566 PROJECT HIGHLIGHTS • Civil Design/Survey/CA/RI • Drainage Repairs - 10,464 LF • Sewer Repairs - 42,259 LF • Concrete Repair - 65,569 SY • Asphalt Repairs - 37,902 SY • FEMA, FHWA, DOTD, USACE, SLFPA Coordination As a result of Hurricane Katrina, City of Slidell was inundated with several feet of water causing damage to all public and private facilities and damaging roadway bases and utilities. The City of Slidell hired All South to evaluate the condition of the roadways and utilities. Through our vast experience, All South understands the justification required to ensure eligibility. Once the scope of work was identified, our firm worked with the City, the State (GOHSEP) and the federal government (FEMA) to develop the project worksheets to justify the funds. Once the Project Worksheets were written, All South prepared construction documents for public bid. All along this process, we continually worked with FEMA and GOHSEP to ensure all damage elements were captured and included in the repairs. Our team completed a construction project in the Xxxxxxxxx Canal Drainage Basin (Xxxxxxxxx I) and just completed construction on another phase of these repairs (Xxxxxxxxx II). All South performed the construction management and inspection duties for the Xxxxxxxxx I Construction Project. To ensure the construction is completed as directed in the plans and specifications and within the allotted time and within budget, our team conducted monthly onsite progress meetings with the owner and contractor, along with periodic site inspections. To ensure all repairs were completed and recorded properly, All South diligently reviewed all inspection reports, logs all completed repairs and maintains as-built construction plans. During all phases of this project, All South worked with the City of Slidell on filling out the appropriate payment applications and ensure that all possible federal funds are captured. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxxx “Xxxxx’ Xxxxxxxx Firm name All South Consulting Engineer, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name DPW Capital Improvements Program Audubon, Black Pearl, East Carrollton, Uptown, West Riverside Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of New Orleans Project location New Orleans, Louisiana Owner’s Project Manager Xxxxx Xxxxxxxx Owner’s address, phone, email 0000 Xxxxxxx Xx., Xxx Xxxxxxx, Xxxxxxxxx 00000, (000) 000-0000, xxxxxxxxxxx@xxxx.xxx Services commenced by this firm (mm/yy) 11/13 Total consultant contract cost ($1,000’s) $33,570 Services completed by this firm (mm/yy) Ongoing Cost of consultant services provided by this firm ($1,000’s) $3,456 • Civil Design/Survey/CA/RI • Concrete Repairs - 25,436 SY • Asphalt Repairs - 252,509 SY • ADA Ramp Repairs - 9,060 SY • Drainage Repairs - 24,284 LF • Sewer Repairs - 24,200 LF • Water Repairs - 17,834 LF • FEMA, SWBNO, SLFPA-E, LaDOTD, FHWA, Coordination All South Consulting Engineers is currently providing professional engineering services as part of the recovery roads program for several neighborhoods in Uptown New Orleans. This work is part of the FEMA funded Capital Improvements Program, a program that is available to areas that were inundated in a disaster. The scope of services included assessing the damage to roadways, curbs, sidewalks, driveways, ADA ramps, and comparing that damage to the assessment in the FEMA project worksheets. The project scope also included adding in additional pavement repairs caused by demolition of properties as well as repairs for purposes of constructability. As part of this assessment, All South individually inspected each of the streets in these neighborhoods. Following the completion of the Project Scoping Report, All South negotiated on behalf of the City with FEMA to resolve discrepancies between the project worksheets and the Scoping Report. Once final design is completed, All South will produce construction documents, manage the advertisement and bidding of the project, and will provide contract administration and resident inspection for the FEMA-eligible roadway improvements inside the project area. To ensure the accuracy of project quantity totals and costs throughout the life of these projects, All South provides the City with recorded quantities and observations via customized daily work reports. These reports are used by All South and DPW to guarantee accuracy of project quantities used in Contractor invoicing to anticipate quantity overruns/underruns and keep projects on schedule. All South has extensive familiarity with construction projects throughout the region in reviewing reports and verifying Contractor monthly invoices with various platforms and software. All South uses this experience to optimize the product for DPW New Orleans. All South also submits innovative, customized daily photo work reports which include inspection photos with relevant descriptions of the work being performed. This is included separately with each daily work report done by the inspector. All South Staff: Xxxxxxx Xxxxxx, Xxxx Xxxxxxx, Xx., PE; PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxx Xxxxxxxxxxxx; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxx Xxxx
Appears in 1 contract
Samples: Entity Contract
Firm Experience. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Ongoing Cost of consultant services provided by this firm ($1,000’s) $1,056 PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF Identify the team’s project experience most relevant to the scope in the advertisement. The projects should be limited to a total of 20, with no more than 5 projects being represented by the prime consultant and with no more than 3 projects represented by each sub-consultant on the team. If more than 5 projects are identified for the prime consultant, all projects identified after the first 5 will not be evaluated. If more than 3 projects are identified for a single sub-consultant, all projects identified after the first 3 from that sub-consultant will not be evaluated. Include no more than one page per project. Projects identified shall only include work performed by firms on the team. The projects identified do not necessarily need to have been DOTD projects. This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, in place cement stabilized base course, asphalt concrete overlay and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxx Xxxxxxx, III; Xxxxxx Xxxxxx, PE; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD Natchez Drive Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.012856 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 07/22 Total consultant contract cost ($1,000’s) $109 Services completed by this firm (mm/yy) 06/23 Ongoing Cost of consultant services provided by this firm ($1,000’s) $802 • Construction Administration • Resident Inspection • Drainage Repairs – 60 LF • Asphalt Repairs - 5,084 SY This project is a roadway rehabilitation project that includes drainage, grading, milling, full depth asphalt replacements, and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name XxXXXX Xxxxxxxx Drive @ US 000 (Xxxxx Xxxx)(CE&I) Firm responsibility (prime or sub?) Prime Project number H.013381 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 10/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $358 This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, and concrete driveway, curb and roadway replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Drainage Repairs - 297 LF • Asphalt Repairs - 2,515 SY The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxxx, P.E.; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name Xxxxxxxxx Canal Drainage Basin Infrastructure Repairs Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx, P.E. Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 06/13 Total consultant contract cost ($1,000’s) $14,524 Services completed by this firm (mm/yy) 12/20 Cost of consultant services provided by this firm ($1,000’s) $1,566 PROJECT HIGHLIGHTS • Civil Design/Survey/CA/RI • Drainage Repairs - 10,464 LF • Sewer Repairs - 42,259 LF • Concrete Repair - 65,569 SY • Asphalt Repairs - 37,902 SY • FEMA, FHWA, DOTD, USACE, SLFPA Coordination As a result of Hurricane Katrina, City of Slidell was inundated with several feet of water causing damage to all public and private facilities and damaging roadway bases and utilities. The City of Slidell hired All South to evaluate the condition of the roadways and utilities. Through our vast experience, All South understands the justification required to ensure eligibility. Once the scope of work was identified, our firm worked with the City, the State (GOHSEP) and the federal government (FEMA) to develop the project worksheets to justify the funds. Once the Project Worksheets were written, All South prepared construction documents for public bid. All along this process, we continually worked with FEMA and GOHSEP to ensure all damage elements were captured and included in the repairs. Our team completed a construction project in the Xxxxxxxxx Canal Drainage Basin (Xxxxxxxxx I) and just completed construction on another phase of these repairs (Xxxxxxxxx II). All South performed the construction management and inspection duties for the Xxxxxxxxx I Construction Project. To ensure the construction is completed as directed in the plans and specifications and within the allotted time and within budget, our team conducted monthly onsite progress meetings with the owner and contractor, along with periodic site inspections. To ensure all repairs were completed and recorded properly, All South diligently reviewed all inspection reports, logs all completed repairs and maintains as-built construction plans. During all phases of this project, All South worked with the City of Slidell on filling out the appropriate payment applications and ensure that all possible federal funds are captured. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxxx “Xxxxx’ Xxxxxxxx Firm name All South Consulting Engineer, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name DPW Capital Improvements Program Audubon, Black Pearl, East Carrollton, Uptown, West Riverside Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of New Orleans Project location New Orleans, Louisiana Owner’s Project Manager Xxxxx Xxxxxxxx Owner’s address, phone, email 0000 Xxxxxxx Xx., Xxx Xxxxxxx, Xxxxxxxxx 00000, (000) 000-0000, xxxxxxxxxxx@xxxx.xxx Services commenced by this firm (mm/yy) 11/13 Total consultant contract cost ($1,000’s) $33,570 Services completed by this firm (mm/yy) Ongoing Cost of consultant services provided by this firm ($1,000’s) $3,456 • Civil Design/Survey/CA/RI • Concrete Repairs - 25,436 SY • Asphalt Repairs - 252,509 SY • ADA Ramp Repairs - 9,060 SY • Drainage Repairs - 24,284 LF • Sewer Repairs - 24,200 LF • Water Repairs - 17,834 LF • FEMA, SWBNO, SLFPA-E, LaDOTD, FHWA, Coordination All South Consulting Engineers is currently providing professional engineering services as part of the recovery roads program for several neighborhoods in Uptown New Orleans. This work is part of the FEMA funded Capital Improvements Program, a program that is available to areas that were inundated in a disaster. The scope of services included assessing the damage to roadways, curbs, sidewalks, driveways, ADA ramps, and comparing that damage to the assessment in the FEMA project worksheets. The project scope also included adding in additional pavement repairs caused by demolition of properties as well as repairs for purposes of constructability. As part of this assessment, All South individually inspected each of the streets in these neighborhoods. Following the completion of the Project Scoping Report, All South negotiated on behalf of the City with FEMA to resolve discrepancies between the project worksheets and the Scoping Report. Once final design is completed, All South will produce construction documents, manage the advertisement and bidding of the project, and will provide contract administration and resident inspection for the FEMA-eligible roadway improvements inside the project area. To ensure the accuracy of project quantity totals and costs throughout the life of these projects, All South provides the City with recorded quantities and observations via customized daily work reports. These reports are used by All South and DPW to guarantee accuracy of project quantities used in Contractor invoicing to anticipate quantity overruns/underruns and keep projects on schedule. All South has extensive familiarity with construction projects throughout the region in reviewing reports and verifying Contractor monthly invoices with various platforms and software. All South uses this experience to optimize the product for DPW New Orleans. All South also submits innovative, customized daily photo work reports which include inspection photos with relevant descriptions of the work being performed. This is included separately with each daily work report done by the inspector. All South Staff: Xxxxxxx Xxxxxx, Xxxx Xxxxxxx, Xx., PE; PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxx Xxxxxxxxxxxx; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxx Xxxx
Appears in 1 contract
Firm Experience. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $1,056 PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF Identify the team’s project experience most relevant to the scope in the advertisement. The projects should be limited to a total of 20, with no more than 5 projects being represented by the prime consultant and with no more than 3 projects represented by each sub-consultant on the team. If more than 5 projects are identified for the prime consultant, all projects identified after the first 5 will not be evaluated. If more than 3 projects are identified for a single sub-consultant, all projects identified after the first 3 from that sub-consultant will not be evaluated. Include no more than one page per project. Projects identified shall only include work performed by firms on the team. The projects identified do not necessarily need to have been DOTD projects. This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, in place cement stabilized base course, asphalt concrete overlay and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxx Xxxxxxx, III; Xxxxxx Xxxxxx, PE; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting EngineersNTB Associates, LLC Inc. Past Performance Evaluation Discipline(s)* CE&I/OV **Survey Project name LaDOTD Natchez Drive Rehabilitation (CE&I) IDIQ Contract for Hydrographic Surveying Services, Statewide, LA Firm responsibility (prime or sub?) Prime Project number H.012856 4400019715 Owner’s name City of Slidell LaDOTD Baton Rouge Project location SlidellStatewide, Louisiana LA (South Districts) Owner’s Project Manager Xxxxxx Xxxxxx Xx. Xxxxx Xxxx Owner’s address, phone, email 0000 Xxxxxxx Xxxxxx XxxxxxXxxx, XxxxxxxXxxxx Xxxxx, XX 00000, 00000 (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx 0000 xxxxx.xxxx@xx.xxx Services commenced by this firm (mm/yy) 07/22 09/20 Total consultant contract cost ($1,000’s) $109 1,000.0 Services completed by this firm (mm/yy) 06/23 On-going Cost of consultant services provided by this firm ($1,000’s) $802 • Construction Administration • Resident Inspection • Drainage Repairs – 60 LF • Asphalt Repairs - 5,084 SY This 501.1 to date Describe the project including the firm’s role and members involved. (Highlight staff to be used in this proposal.) * If there is more than one past performance evaluation discipline included in the proposal, then indicate which past performance evaluation discipline(s) this project is a roadway rehabilitation project that includes drainage, grading, milling, full depth asphalt replacements, being used to represent. **This field cannot be left blank and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name XxXXXX Xxxxxxxx Drive @ US 000 (Xxxxx Xxxx)(CE&I) Firm responsibility (prime or sub?) Prime Project number H.013381 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 10/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $358 This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, and concrete driveway, curb and roadway replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Drainage Repairs - 297 LF • Asphalt Repairs - 2,515 SY The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxxx, P.E.; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name Xxxxxxxxx Canal Drainage Basin Infrastructure Repairs Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx, P.E. Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 06/13 Total consultant contract cost ($1,000’s) $14,524 Services completed by this firm (mm/yy) 12/20 Cost of consultant services provided by this firm ($1,000’s) $1,566 PROJECT HIGHLIGHTS • Civil Design/Survey/CA/RI • Drainage Repairs - 10,464 LF • Sewer Repairs - 42,259 LF • Concrete Repair - 65,569 SY • Asphalt Repairs - 37,902 SY • FEMA, FHWA, DOTD, USACE, SLFPA Coordination As a result of Hurricane Katrina, City of Slidell was inundated with several feet of water causing damage to all public and private facilities and damaging roadway bases and utilitiesis not acceptable. The City only past performance evaluation disciplines to be used are: Road, Bridge, Traffic, CE&I/OV, Geotech, Survey, Environmental, Data Collection, Planning, Right-of-Way, CPM, ITS, Appraiser and Other (please specify). NTBA is performing single beam and multibeam hydrographic surveying services at scheduled intervals upstream and downstream under an IDIQ Contract for existing bridges throughout the State currently totaling 179 sites including post hurricane assessments. The hydrographic survey duties include training crews in methods consisting of Slidell hired All South running range lines at predetermined stations over the water and on the banks and recovering baseline and pre-determined range lines utilizing LaDOTD benchmarks, determining water elevations, performing fathometer bar check to evaluate ensure correct speed of sound, running and charting predetermined range lines, obtaining marks at predetermined distances along the condition range lines, and obtaining photographs of the roadways bridge and utilitiesany debris or adverse conditions. Through our vast experienceDuties also include the preparation of sketches of the water body surveyed, All South understands the justification required reduction of chart data from depths to ensure eligibility. Once the scope elevations, preparation of work was identified, our firm worked a data chart with the Citydepths, elevations, and locations of the State (GOHSEP) data obtained, and the federal government (FEMA) to develop the project worksheets to justify the funds. Once the Project Worksheets were written, All South prepared construction documents for public bidpreparation of written reports on each survey noting field conditions and findings. All along this processcharts, we continually worked with FEMA and GOHSEP to ensure all damage elements were captured and included in the repairs. Our team completed a construction project in the Xxxxxxxxx Canal Drainage Basin (Xxxxxxxxx I) and just completed construction on another phase of these repairs (Xxxxxxxxx II). All South performed the construction management and inspection duties for the Xxxxxxxxx I Construction Project. To ensure the construction is completed as directed in the plans and specifications and within the allotted time and within budgetfield notes, our team conducted monthly onsite progress meetings with the owner and contractorphotographs, along with periodic site inspections. To ensure all repairs were completed and recorded properlydata charts, All South diligently reviewed all inspection reports, logs all completed repairs and maintains as-built construction plans. During all phases of this project, All South worked with the City of Slidell on filling out the appropriate payment applications and ensure that all possible federal funds are captured. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxxx “Xxxxx’ Xxxxxxxx Firm name All South Consulting Engineer, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name DPW Capital Improvements Program Audubon, Black Pearl, East Carrollton, Uptown, West Riverside Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of New Orleans Project location New Orleans, Louisiana Owner’s Project Manager Xxxxx Xxxxxxxx Owner’s address, phone, email 0000 Xxxxxxx Xx., Xxx Xxxxxxx, Xxxxxxxxx 00000, (000) 000-0000, xxxxxxxxxxx@xxxx.xxx Services commenced by this firm (mm/yy) 11/13 Total consultant contract cost ($1,000’s) $33,570 Services completed by this firm (mm/yy) Ongoing Cost of consultant services provided by this firm ($1,000’s) $3,456 • Civil Design/Survey/CA/RI • Concrete Repairs - 25,436 SY • Asphalt Repairs - 252,509 SY • ADA Ramp Repairs - 9,060 SY • Drainage Repairs - 24,284 LF • Sewer Repairs - 24,200 LF • Water Repairs - 17,834 LF • FEMA, SWBNO, SLFPA-E, LaDOTD, FHWA, Coordination All South Consulting Engineers is currently providing professional engineering services as part of the recovery roads program for several neighborhoods in Uptown New Orleans. This work is part of the FEMA funded Capital Improvements Program, a program that is available to areas that were inundated in a disaster. The scope of services included assessing the damage to roadways, curbs, sidewalks, driveways, ADA rampssketches, and comparing that damage reports are submitted electronically to the assessment in the FEMA project worksheets. The project scope also included adding in additional pavement repairs caused by demolition of properties as well as repairs for purposes of constructability. As part of this assessment, All South individually inspected each of the streets in these neighborhoods. Following the completion of the Project Scoping Report, All South negotiated on behalf of the City with FEMA to resolve discrepancies between the project worksheets and the Scoping Report. Once final design is completed, All South will produce construction documents, manage the advertisement and bidding of the project, and will provide contract administration and resident inspection for the FEMA-eligible roadway improvements inside the project area. To ensure the accuracy of project quantity totals and costs throughout the life of these projects, All South provides the City with recorded quantities and observations via customized daily work reports. These reports are used by All South and DPW to guarantee accuracy of project quantities used in Contractor invoicing to anticipate quantity overruns/underruns and keep projects on schedule. All South has extensive familiarity with construction projects throughout the region in reviewing reports and verifying Contractor monthly invoices with various platforms and software. All South uses this experience to optimize the product for DPW New Orleans. All South also submits innovative, customized daily photo work reports which include inspection photos with relevant descriptions of the work being performed. This is included separately with each daily work report done by the inspector. All South Staff: Xxxxxxx Xxxxxx, Xxxx Xxxxxxx, XxState’s ProjectWise site., PE; PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxx Xxxxxxxxxxxx; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxx Xxxx
Appears in 1 contract
Samples: Professional Services
Firm Experience. Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD North Carnation Street Pavement Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.014011 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 09/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $1,056 PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Asphalt Repairs - 1,091 SY • 5’x4’ Reinforced Concrete Box Culvert - 200 LF Identify the team’s project experience most relevant to the scope in the advertisement. The projects should be limited to a total of 20, with no more than 5 projects being represented by the prime consultant and with no more than 3 projects represented by each sub-consultant on the team. If more than 5 projects are identified for the prime consultant, all projects identified after the first 5 will not be evaluated. If more than 3 projects are identified for a single sub-consultant, all projects identified after the first 3 from that sub-consultant will not be evaluated. Include no more than one page per project. Projects identified shall only include work performed by firms on the team. The projects identified do not necessarily need to have been DOTD projects. This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, in place cement stabilized base course, asphalt concrete overlay and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxx Xxxxxxx, III; Xxxxxx Xxxxxx, PE; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name LaDOTD Natchez Drive Rehabilitation (CE&I) Firm responsibility (prime or sub?) Prime Project number H.012856 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 07/22 Total consultant contract cost ($1,000’s) $109 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $802 • Construction Administration • Resident Inspection • Drainage Repairs – 60 LF • Asphalt Repairs - 5,084 SY This project is a roadway rehabilitation project that includes drainage, grading, milling, full depth asphalt replacements, and concrete driveway and curb replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name XxXXXX Xxxxxxxx Drive @ US 000 (Xxxxx Xxxx)(CE&I) Firm responsibility (prime or sub?) Prime Project number H.013381 Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 10/22 Total consultant contract cost ($1,000’s) $93 Services completed by this firm (mm/yy) 06/23 Cost of consultant services provided by this firm ($1,000’s) $358 This project is a roadway rehabilitation project that includes drainage, milling, full depth asphalt replacements, and concrete driveway, curb and roadway replacements. The project is funded under the Federal Aid Highway Program through FHWA and LaDOTD. All South’s role is as Construction Administrators and to provide Resident Inspection for the projects. All inspectors must be LaDOTD certified in either embankments, concrete or asphalt in order to be eligible to inspect the construction. PROJECT HIGHLIGHTS • Construction Administration • Resident Inspection • Drainage Repairs - 297 LF • Asphalt Repairs - 2,515 SY The project is governed by LaDOTD standard specifications. All construction related documentation must be submitted through Sitemanager and all materials used in construction must be from the approved list provided by LaDOTD. Construction related documentation includes daily quantities, daily engineer diaries, change orders, material testing, mix designs, estimates, work summaries, and RFIs. All South is also responsible for field changes, translation of the construction documents, utility coordination, employee interviews for Xxxxx Xxxxx compliance and delivering EEO notices to the contractors. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxxx, P.E.; Xxxx Xxxxxxx, III; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx Firm name All South Consulting Engineers, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name Xxxxxxxxx Canal Drainage Basin Infrastructure Repairs Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of Slidell Project location Slidell, Louisiana Owner’s Project Manager Xxxxxx Xxxxxx, P.E. Owner’s address, phone, email 0000 Xxxxxx Xxxxxx, Xxxxxxx, XX 00000, (000) 000-0000, xxxxxxx@xxxxxxxxxxxxx.xxx Services commenced by this firm (mm/yy) 06/13 Total consultant contract cost ($1,000’s) $14,524 Services completed by this firm (mm/yy) 12/20 Cost of consultant services provided by this firm ($1,000’s) $1,566 PROJECT HIGHLIGHTS • Civil Design/Survey/CA/RI • Drainage Repairs - 10,464 LF • Sewer Repairs - 42,259 LF • Concrete Repair - 65,569 SY • Asphalt Repairs - 37,902 SY • FEMA, FHWA, DOTD, USACE, SLFPA Coordination As a result of Hurricane Katrina, City of Slidell was inundated with several feet of water causing damage to all public and private facilities and damaging roadway bases and utilities. The City of Slidell hired All South to evaluate the condition of the roadways and utilities. Through our vast experience, All South understands the justification required to ensure eligibility. Once the scope of work was identified, our firm worked with the City, the State (GOHSEP) and the federal government (FEMA) to develop the project worksheets to justify the funds. Once the Project Worksheets were written, All South prepared construction documents for public bid. All along this process, we continually worked with FEMA and GOHSEP to ensure all damage elements were captured and included in the repairs. Our team completed a construction project in the Xxxxxxxxx Canal Drainage Basin (Xxxxxxxxx I) and just completed construction on another phase of these repairs (Xxxxxxxxx II). All South performed the construction management and inspection duties for the Xxxxxxxxx I Construction Project. To ensure the construction is completed as directed in the plans and specifications and within the allotted time and within budget, our team conducted monthly onsite progress meetings with the owner and contractor, along with periodic site inspections. To ensure all repairs were completed and recorded properly, All South diligently reviewed all inspection reports, logs all completed repairs and maintains as-built construction plans. During all phases of this project, All South worked with the City of Slidell on filling out the appropriate payment applications and ensure that all possible federal funds are captured. All South Staff: Xxxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, Xx., PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxxx “Xxxxx’ Xxxxxxxx Firm name All South Consulting Engineer, LLC Past Performance Evaluation Discipline(s)* CE&I/OV Project name DPW Capital Improvements Program Audubon, Black Pearl, East Carrollton, Uptown, West Riverside Firm responsibility (prime or sub?) Prime Project number N/A Owner’s name City of New Orleans Project location New Orleans, Louisiana Owner’s Project Manager Xxxxx Xxxxxxxx Owner’s address, phone, email 0000 Xxxxxxx Xx., Xxx Xxxxxxx, Xxxxxxxxx 00000, (000) 000-0000, xxxxxxxxxxx@xxxx.xxx Services commenced by this firm (mm/yy) 11/13 Total consultant contract cost ($1,000’s) $33,570 Services completed by this firm (mm/yy) Ongoing Cost of consultant services provided by this firm ($1,000’s) $3,456 • Civil Design/Survey/CA/RI • Concrete Repairs - 25,436 SY • Asphalt Repairs - 252,509 SY • ADA Ramp Repairs - 9,060 SY • Drainage Repairs - 24,284 LF • Sewer Repairs - 24,200 LF • Water Repairs - 17,834 LF • FEMA, SWBNO, SLFPA-E, LaDOTD, FHWA, Coordination All South Consulting Engineers is currently providing professional engineering services as part of the recovery roads program for several neighborhoods in Uptown New Orleans. This work is part of the FEMA funded Capital Improvements Program, a program that is available to areas that were inundated in a disaster. The scope of services included assessing the damage to roadways, curbs, sidewalks, driveways, ADA ramps, and comparing that damage to the assessment in the FEMA project worksheets. The project scope also included adding in additional pavement repairs caused by demolition of properties as well as repairs for purposes of constructability. As part of this assessment, All South individually inspected each of the streets in these neighborhoods. Following the completion of the Project Scoping Report, All South negotiated on behalf of the City with FEMA to resolve discrepancies between the project worksheets and the Scoping Report. Once final design is completed, All South will produce construction documents, manage the advertisement and bidding of the project, and will provide contract administration and resident inspection for the FEMA-eligible roadway improvements inside the project area. To ensure the accuracy of project quantity totals and costs throughout the life of these projects, All South provides the City with recorded quantities and observations via customized daily work reports. These reports are used by All South and DPW to guarantee accuracy of project quantities used in Contractor invoicing to anticipate quantity overruns/underruns and keep projects on schedule. All South has extensive familiarity with construction projects throughout the region in reviewing reports and verifying Contractor monthly invoices with various platforms and software. All South uses this experience to optimize the product for DPW New Orleans. All South also submits innovative, customized daily photo work reports which include inspection photos with relevant descriptions of the work being performed. This is included separately with each daily work report done by the inspector. All South Staff: Xxxxxxx Xxxxxx, Xxxx Xxxxxxx, Xx., PE; PE; Xxxxxxx Xxxxx, PE; Xxxxxx Xxxxxx, PE; Xxxx Xxxxxxx, III; Xxxxx Xxxxxx, EI; Xxxx Xxxxxxxxx, PLS; Xxxxx Xxxxxxxxxxxx; Xxxxxx “Xxxxx” Xxxxxxxx; Xxxxxxx Xxxxxx; Xxxx Xxxx
Appears in 1 contract