FIXING REINFORCEMENT. Reinforcement shall be accurately fixed and by approved means maintained in the position shown in the drawings. Bars intended to be in contact at crossing points shall be securely bound together at all such points with No. 16 gauge or 18 gauge annealed soft iron wire, The cover or concrete over the reinforcement shall be as shown on the drawings and shall be provided and maintained by means of cement mortar briquettes or other approved means. The vertical distances required between successive layers of bars in beams or similar members shall be, maintained by the provision of mild steel spacer bars at such intervals that the main bars do not perceptibly sag between adjacent spacer bars. Reinforcement shall be placed within the following tolerances:
AutoNDA by SimpleDocs

Related to FIXING REINFORCEMENT

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Power Outages and Emergencies If you have any electrical emergency or power outage, please contact your Utility at the number provided in Contact Information.

  • Procedures for Providing NP Through Full NXX Code Migration Where a Party has activated an entire NXX for a single Customer, or activated at least eighty percent (80%) of an NXX for a single Customer, with the remaining numbers in that NXX either reserved for future use by that Customer or otherwise unused, if such Customer chooses to receive Telephone Exchange Service from the other Party, the first Party shall cooperate with the second Party to have the entire NXX reassigned in the LERG (and associated industry databases, routing tables, etc.) to an End Office operated by the second Party. Such transfer will be accomplished with appropriate coordination between the Parties and subject to appropriate industry lead times for movements of NXXs from one switch to another. Neither Party shall charge the other in connection with this coordinated transfer.

  • Contract Database Metadata Elements Title: Whitesville Central School District and Whitesville Central School Educational Support Staff Association (2003) Employer Name: Whitesville Central School District Union: Whitesville Central School Educational Support Staff Association Local: Effective Date: 07/01/2003 Expiration Date: 06/30/2006 PERB ID Number: 10699 Unit Size: Number of Pages: 23 For additional research information and assistance, please visit the Research page of the Catherwood website - xxxx://xxx.xxx.xxxxxxx.xxx/library/research/ For additional information on the ILR School - xxxx://xxx.xxx.xxxxxxx.xxx/ AGREEMENT BETWEEN WHITESVILLE CENTRAL SCHOOL EDUCATIONAL SUPPORT STAFF ASSOCIATION AND THE WHITESVILLE CENTRAL SCHOOL DISTRICT JULY 1, 2003 THROUGH JUNE 30, 2006 TABLE OF CONTENTS ARTICLE TITLE PAGE Preamble 1 I Recognition 1 II Collective Bargaining U n i t 1 III Dues/Agency Fee Ckoffand Payroll Deduction 1 IV Rights of Employees 2 V Rights of Employer ------------- 2 VI Personnel F i l e 2 VII Employee Definitions 3 VIII Permanent Status/Seniority 4 IX Wages 5 X Overtime 7 XI Vacation 7 XII Holidays 8 XIII Sick Leave and Leavesof A b s e n c e 8 XIV Conference, Workshops,Required Courses 10 XV Meal Allowance and M i l e a g e 11 XVI Retirement 11 XVII Insurance 12 XVIII Cafeteria P l a n 14 .XIX Uniform Allowance------------------ 14 XX Hours of W o r k 14 XXI Transfers/Promotions 15 XXII Job Descriptions 15 XXIII Grievance Procedure 15 XIV Copies of the Contract 18 XV Zipper C x x x x x 18 XXVI Legislative Clause 18 XXVII Duration 19 SIGNATURES 19 APPENDIX A Grievance F o r m 20 APPENDIX B Dues Authorization F o r m 21

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Construction Progress Meetings The Design Professional shall attend Construction Progress Meetings periodically held by the Contractor at the Site on a schedule determined by the Contractor. The Design Professional shall review the minutes of the meeting and provide his written comments to the minutes to the Owner and Contractor within seven calendar days after receipt of the meeting minutes.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Evacuation (1) If the Combatant Commander orders a mandatory evacuation of some or all personnel, the Government will provide assistance, to the extent available, to United States and third country national contractor personnel.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

Time is Money Join Law Insider Premium to draft better contracts faster.