Fuel rail Sample Clauses

Fuel rail. 2.2.1. Many of the components mentioned above can be combined or fitted together as a "multi-functional component". Figure 1-1 Class 0 Class 3 Class 1 Class 2 Class 4 Not subject to this Regulation STOP Flow scheme for CNG components classification In contact with gas No Yes po>3 000 kPa Yes po<26 000 kPa No No Yes 450<po<3 000 kPa Yes Safety valve No No Yes 20<po<450 kPa Yes No START Figure 1-2 Tests applicable to specific classes of components (excluding cylinders) Performance Test Over- pressure Strength Test Leakage Test (external) Leakage Test (internal) Continued Operation Durability Test Corrosion Resistance Ozone Ageing CNG Compatibility Vibration Resistance Dry - Heat Resistance Annex 5A Annex 5B Annex 5C Annex 5L Annex 5E Annex 5G Annex 5D Annex 5N Annex 5F Class 0 X X A A X X X X X Class 1 X X A A X X X X X Class 2 X X A A X A X X A Class 3 X X A A X X X X X Class 4 O O O O X A X O A X = Applicable O = Not applicable A = As applicable
AutoNDA by SimpleDocs

Related to Fuel rail

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Fueling delivering or dispensing fuel, defueling and refueling, or any other transfer of fuel on Airport property.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Television Equipment Recycling If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!