Geotechnical Impact. 6.6.1 Ground investigation has been carried out at the site area in order to extract the geological profile and geotechnical parameters for the design of ELS. Adequate design of ELS will be provided in order to minimize any potential geotechnical impact. The geotechnical assessment report is attached in Appendix G.
AutoNDA by SimpleDocs

Related to Geotechnical Impact

  • Geotechnical Engineer « »« » « » « » « » « »

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Environmental Impact Notwithstanding any other term, covenant or condition contained in this Lease, in the event that any Alteration has any adverse environmental impact on the Premises. Landlord may deny Tenant the right to proceed in Landlord’s sole and absolute discretion.

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Study Area The study area focused on the Bulk Power System in South-Eastern New York between Albany and New York City, and voltages underlying systems at 115 kV and above in the lower Xxxxxx Valley (Zones G, H & I). In the PSS™E power flow base case provided by NYISO, facilities rated at 115 kV and above in PSS™E designated areas 6 through 11 are monitored in the study. These areas are: • Capital District • Xxxxxx • Millwood • Xxxxxxxxx • Con Ed • Long Island

  • Off-Site Environmental Impacts Nothing in this Article will be construed to make Company liable in any way for any environmental impacts or release of Hazardous Substances affecting the Company Premises that occurs by reason of the migration or flow to the Company Premises from verifiable or documented off-site environmental impacts that is not attributable to Company’s activities at the Company Premises.

  • System Impact Study An assessment by the Transmission Provider of (i) the adequacy of the Transmission System to accommodate a Completed Application, an Interconnection Request or an Upgrade Request, (ii) whether any additional costs may be incurred in order to provide such transmission service or to accommodate an Interconnection Request, and (iii) with respect to an Interconnection Request, an estimated date that an Interconnection Customer’s Customer Facility can be interconnected with the Transmission System and an estimate of the Interconnection Customer’s cost responsibility for the interconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested system upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to provide the requested incremental rights.

  • School Improvement Plan As permitted under IC § 20-10.2-3-1.5, the Charter shall serve as the Charter School's strategic and continuous school improvement and achievement plan (hereafter, the "School Improvement Plan"). To the extent that IC § 20-10.2 applies to the Charter in its function as the School Improvement Plan, the Organizer shall comply with the requirements under IC § 20-10.2.