Groundwater Modeling and Yield Assessment Sample Clauses

Groundwater Modeling and Yield Assessment. In addition to summarizing previous work, the feasibility analysis will include the results of groundwater modeling and permitting efforts with FDEP related to the recharge/recovery alternative. The results of the modeling and institutional input will serve to define the anticipated yield of raw water which the City may expect from the two TAP alternatives. The Engineer will also develop preliminary estimate of the reduction in nutrient loadings to Tampa Bay that may be anticipated from the two alternatives evaluated. The economic value of these reductions will be estimated based on unit costs cited in the literature associated with upgrades to the treatment process and nutrient reductions achieved through stormwater treatment systems.
AutoNDA by SimpleDocs

Related to Groundwater Modeling and Yield Assessment

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Periodic Risk Assessment Provider further acknowledges and agrees to conduct periodic risk assessments and remediate any identified security and privacy vulnerabilities in a timely manner.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Loss Assessment We will pay up to $1000 for your share of loss assessment charged during the policy period against you by a corporation or as- sociation of property owners, when the assess- ment is made as a result of:

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • PHASE is a distinct portion of the Work to be provided under this Agreement, as specified in the Statement Of Work.

  • Risk Assessments a. Risk Assessment - DST shall, at least annually, perform risk assessments that are designed to identify material threats (both internal and external) against Fund Data, the likelihood of those threats Schedule 10.2 p.2 occurring and the impact of those threats upon DST organization to evaluate and analyze the appropriate level of information security safeguards (“Risk Assessments”). b. Risk Mitigation - DST shall use commercially reasonable efforts to manage, control and remediate threats identified in the Risk Assessments that it believes are likely to result in material unauthorized access, copying, use, processing, disclosure, alteration, transfer, loss or destruction of Fund Data, consistent with the Objective, and commensurate with the sensitivity of the Fund Data and the complexity and scope of the activities of DST pursuant to the Agreement. c. Security Controls Testing - DST shall, on approximately an annual basis, engage an independent external party to conduct a review (including information security) of DST’s systems that are related to the provision of services. DST shall have a process to review and evaluate high risk findings resulting from this testing.

  • Periodic Review of Costs of Environmental Compliance In the ordinary course of its business, the Company conducts a periodic review of the effect of Environmental Laws on the business, operations and properties of the Company and its subsidiaries, in the course of which it identifies and evaluates associated costs and liabilities (including, without limitation, any capital or operating expenditures required for clean-up, closure of properties or compliance with Environmental Laws or any permit, license or approval, any related constraints on operating activities and any potential liabilities to third parties). On the basis of such review and the amount of its established reserves, the Company has reasonably concluded that such associated costs and liabilities would not, individually or in the aggregate, result in a Material Adverse Change.

  • Ergonomic Assessments ‌ At the request of the employee, the Employer will ensure that an ergonomic assessment of the employee’s workstation is completed. Solutions to identified issues will be implemented within available resources.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!