Gutters and Downspouts Sample Clauses

Gutters and Downspouts. Pool & Built-In Spa Equipment Above ground, accessible, and operationally necessary components and parts of the heating, pumping, and filtration system including pool sweep motor and pump, pump motor, plumbing pipes and wiring, and saltwater cell and circuit board.
AutoNDA by SimpleDocs
Gutters and Downspouts. New installation or replacement of existing gutters and downspouts requires an ACR form for ARC approval.
Gutters and Downspouts. Wet leaves and debris remaining in the gutter over winter adds a significant weight and volume to the gutter when frozen and increases water build-up on the roof. • Please report to PropM if your gutters are over-filled with debris and leaves.
Gutters and Downspouts.  LOCATION Front elevation gutters with downspouts  TYPE Rolled aluminum with pre-painted finish
Gutters and Downspouts. If the structure has gutters and downspouts, they are to be secured to the structure and free of leaves and other debris.
Gutters and Downspouts. All building’s gutters and downspouts shall be inspected every 6 months and periodically cleaned to remove accumulated sediment.
Gutters and Downspouts. Check gutters periodically and remove leaves or other debris. Materials that accumulate in gutters can slow water drainage from the roof, cause overflows, and clog the downspouts. Extensions should discharge outside of rock or bark beds so that water is not dammed behind the edging materials that might be used.
AutoNDA by SimpleDocs
Gutters and Downspouts. Guters and downspouts shall not leak, but guters may overflow during heavy rain. Homeowners must keep guters and downspouts clean and free of all debris and leaves that could increase overflow problems.
Gutters and Downspouts. Gutters and downspouts shall not leak but gutters may over flow during heavy rain. Builder will repair leaky gutters. Homeowner must keep gutters and downspouts clean and free of all debris and leaves that could increase overflow problems.

Related to Gutters and Downspouts

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Toilets Papers, dust, cobwebs, peels, cans/bottles, cigarette butts, excrement on floor, bad smells, water pools, leaking sewage, rodents, animals (dead or alive), overflowing sanitary bins. 0 = NOT APPLICABLE 1 = UNACCEPTABLE (Toilets out of order. Toilets not cleaned on daily basis.) 2 = POOR (Toilets cleaned, but still visible signs of dirt, e.g. dust, cobwebs.) 3 = GOOD (Obvious sign that toilets are cleaned daily.) 4 = EXCELLENT (Extra effort is put in to ensure cleanliness, e.g. using detergents.)

  • Sprinklers Subject to any terms, conditions and limitations set forth herein, Landlord shall provide an operative sprinkler system consisting of mains, laterals, and heads “AS IS” on the date of delivery of the Premises to Tenant. Tenant shall pay for piping distribution, drops and relocation of, or additional, sprinkler system heads and Building firehose or firehose valve cabinets, if Tenant’s Plans and/or any applicable Laws necessitate such.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • GLASS The Tenant shall maintain the glass part of the demised premises, promptly replacing any breakage and fully saving the Landlord harmless from any loss, cost or damage resulting from such breakage or the replacement thereof.

  • Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Fire Extinguishers Provide UL-listed extinguishers, cabinets and accessories from a single manufacturer such as X.X. Industries or Xxxxxx’x Manufacturing Company that comply with local fire marshal approval. 12.1 Systems Furnishings: Systems furnishings will be supplied and installed by the State. It will be the Lessor’s responsibility to complete the electrical connections from the building electrical grid to the power connections or power poles for the system furnishings (see Division 16, Electrical).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!