Handle Error and Fault Tolerance Sample Clauses

Handle Error and Fault Tolerance. Implement error handling and fault tolerance mechanisms to ensure reliable and robust integration with the Xxxxx Broker. Consider scenarios such as network disruptions, failed connections, or data processing errors. Implement strategies like retry mechanisms, error logging, and monitoring to handle such situations effectively. By following these steps and implementing the necessary code and configurations, you can seamlessly integrate your application or service with the Xxxxx Broker, enabling efficient and reliable data exchange within the Xxxxx ecosystem (Figure 9).
AutoNDA by SimpleDocs

Related to Handle Error and Fault Tolerance

  • Tolerance Average net mass of cement packed in bags in a sample shall be equal to or more than 50kg. If and as desired by the Engineer-in-Charge, the number of samples to be checked for net mass of cement per bag, in a given number of bags shall be as given below: 100 to 150 bags : 20 sample 150 to 280 bags : 32 sample 281 to 500 bags : 50 sample 501 to 1200 bags : 80 sample 1201 to 3200 bags : 125 sample 3201 and above : 200 sample The bags in a sample shall be selected at random.

  • Tolerances The maximum tolerances within concrete work shall be constructed are as follows:-

  • Unsafe Working Conditions Employees shall be recognized by the Employer to have the competence to determine what constitutes unsafe working conditions within their discipline. No employee shall be disciplined for refusal to work in a situation which is deemed unsafe beyond the reasonable requirements of the employee's job.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements:

  • Safe Working Conditions The Employer undertakes to maintain office furniture, equipment, etc., in a practical and safe condition in order to avoid injury to employees or damage to their attire. Employees, for their part and in their own interest, are expected to advise the Employer of any such potentially injurious equipment.

  • Quality- and Cost-Based Selection Except as ADB may otherwise agree, the Borrower shall apply quality- and cost-based selection for selecting and engaging consulting services.

  • EXPRESS CONDITIONS A. The Employee will not receive compensation until they begin contracted service for the Board. B. Regardless of any board policy or term of this contract, the Board may, with two (2) weeks’ notice, lay-off or furlough the Employee with or without benefits and/or salary should the Board determine, in its sole discretion that exigent economic circumstances exist or that such a lay- off or furlough is in the best interests of the College. The Employee may be laid-off or furloughed to part-time status. If the Employee is laid off or furloughed to part-time status, the Employee will be paid salary pro rata, based on the Employee’s full-time salary. For Employees laid-off or furloughed to part-time status, the Board will determine whether benefits will be granted on a pro rata basis or continued in full for the duration of the lay-off or furlough. C. The Employee’s employment may be terminated with cause, or whenever in the discretion and judgment of the President or designee, if the Employee has failed to meet the performance expectations or productivity goals set by the College, including, but not limited to, income generating goals.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!