Hydraulic Oil for the pumping plants Sample Clauses

Hydraulic Oil for the pumping plants. The Contractor shall supply Mobil DTE 24 or equal delivered in 55-gallon drums and moved to the site-designated storage area, as coordinated by the pumping plant POC. Average use of hydraulic oil per year per pumping plant is approximately 4 barrels.
AutoNDA by SimpleDocs

Related to Hydraulic Oil for the pumping plants

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Gouvernement des États-Unis Le logiciel et la documentation constituent des « Commercial Items » (éléments commerciaux), tel que ce terme est défini dans la clause 48 C.F.R. (Code of Federal Rules) §2.101, consistant en « Commercial Computer Software » (logiciel) et « Commercial Computer Software Documentation » (documentation), tels que ces termes sont utilisés dans les clauses 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202. Conformément à la clause 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202-1 à 227.7202-4, le « Commercial Computer Software » et le « Commercial Computer Software Documentation » sont fournis sous licence au gouvernement des États-Unis (a) uniquement comme « Commercial Items » et (b) uniquement accompagnés des droits octroyés à tous les autres utilisateurs conformément aux termes et conditions ci-inclus. Droits non publiés réservés en vertu de la législation des droits d’auteur en vigueur aux États-Unis.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Child safe environment 5.1 Catholic school communities have a moral, legal and mission-driven responsibility to create nurturing school environments where children are respected, their voices are heard, and where they are safe and feel safe.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.