HYDRAULIC SURVEYS (CES) Sample Clauses

HYDRAULIC SURVEYS (CES). The terrain for the hydraulic surveys is heavily wooded, so the use of GPS will not be possible and will therefore need to be total station work. Vertical and horizontal control will need established at each stream cross section of 1000' US, 500' US, 100' US, US bridge face, DS bridge face, 100' DS, 500' DS, and 1000' DS. Those cross sections shall then be surveyed with the total station, along with a streambed profile for the entire 2000' for the hydraulic analysis. Existing bridge openings of the existing structure as well as the upstream and downstream structures will be measured, as required for the hydraulic adequacy in the PBDHR. All data will be downloaded, process, and a DTM created.
AutoNDA by SimpleDocs

Related to HYDRAULIC SURVEYS (CES)

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Architect/Engineer (A/E) means a person registered as an architect pursuant to Tex. Occ. Code Xxx., Chapter 1051, as a landscape architect pursuant to Tex. Occ. Code Xxx., Chapter 1052, a person licensed as a professional engineer pursuant to Tex. Occ. Code Xxx., Chapter 1001 and/or a firm employed by Owner or a design-build contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • Tuberculosis Examination The examination shall consist of an approved intradermal tuberculosis test, which, if positive, shall be followed by an X-ray of the lungs. Nothing in Sections 5163 to 5163.2, inclusive, shall prevent the governing body of any city or county, upon recommendation of the local health officer, from establishing a rule requiring a more extensive or more frequent examination than required by Section 5163 and this section. § 5163.2. Technician taking X-ray film; Interpretation of X-ray The X-ray film may be taken by a competent and qualified X-ray technician if the X-ray film is subsequently interpreted by a licensed physician and surgeon.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

Time is Money Join Law Insider Premium to draft better contracts faster.