Incident Response Management at the Arvato Systems Group Sample Clauses

Incident Response Management at the Arvato Systems Group. Measures to quickly re-establish the availability of personal data and access to it after a physical or technical incident Procedures are documented within the scope of the estab- lished BCM (Business Continuity Management) to ensure the continuation of business operations during an emergency or major disruption as well as to re-establish all services to be provided to the Client as quickly as possible. Restarting exer- cises are conducted regularly. Measures that ensure the resilience of the systems and ser- vices are designed in such a way that also selectively high loads or high continuous loads of processing remain feasible. Topics regarding the storage, access and line capacities, as well as backup and redundancy concepts, are included in more detail in the availability control.
AutoNDA by SimpleDocs

Related to Incident Response Management at the Arvato Systems Group

  • CONSTRUCTION MANAGER’S SERVICES The services which the Construction Manager shall provide include, but are not limited to, those described or specified herein. The services described or specified shall not be deemed to constitute a comprehensive specification having the effect of excluding services not specifically mentioned.

  • LABOUR MANAGEMENT RELATIONS 30.01 A Labour/Management Relations Committee shall be appointed, consisting of a maximum of two (2) Shop Stewards from the Union, and a maximum of two (2) representatives from the Co-operative. The full-time Union Representative may also attend these meetings from time to time. The Committee shall meet at the request of either party, for the purpose of discussing matters of mutual concern. Time spent by bargaining unit employees in carrying out the functions of this Committee shall be considered as time worked and shall be paid for by the Co-operative. The Committee shall not have jurisdiction to interpret and/or amend the Collective Agreement.

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity

  • CONSTRUCTION MANAGER’S RESPONSIBILITIES The Construction Manager’s Preconstruction Phase responsibilities are set forth in Sections 2.1 and 2.2. The Construction Manager’s Construction Phase responsibilities are set forth in Section 2.3. The Owner and Construction Manager may agree, in consultation with the Architect, for the Construction Phase to commence prior to completion of the Preconstruction Phase, in which case, both phases will proceed concurrently. The Construction Manager shall identify a representative authorized to act on behalf of the Construction Manager with respect to the Project.

  • Information Management Information and Records

  • Trade in Services 1. The Parties shall aim at achieving gradual liberalisation and the opening of their markets for trade in services in accordance with the provisions of the General Agreement on Trade in Services (hereinafter referred to as “the GATS”), taking into account ongoing work under the auspices of the WTO.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Surgery Services and Mastectomy Related Treatment This plan provides benefits for mastectomy surgery and mastectomy-related services in accordance with the Women’s Health and Cancer Rights Act of 1998 and Rhode Island General Law 27-20-29 et seq. For the member receiving mastectomy-related benefits, coverage will be provided in a manner determined in consultation with the attending physician, physician assistant, or an advance practice registered nurse and the patient, for: • all stages of reconstruction of the breast on which the mastectomy was performed; • surgery and reconstruction of the other breast to produce a symmetrical appearance; • prostheses; and • treatment of physical complications at all stages of the mastectomy, including lymphedema. See the Summary of Medical Benefits for the amount you pay.

Time is Money Join Law Insider Premium to draft better contracts faster.