Outage Restoration If an outage on the Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades of the Connecting Transmission Owner or Developer adversely affects the other Party’s operations or facilities, the Party that owns the facility that is out of service shall use Reasonable Efforts to promptly restore such facility(ies) to a normal operating condition consistent with the nature of the outage. The Party that owns the facility that is out of service shall provide the other Party and NYISO, to the extent such information is known, information on the nature of the Emergency State, an estimated time of restoration, and any corrective actions required. Initial verbal notice shall be followed up as soon as practicable with written notice explaining the nature of the outage.
Restoration The following provisions shall apply in connection with the Restoration of any Property or Properties affected by a Casualty: (a) If the Net Proceeds reasonably expected to be received in connection with any single Casualty event is less than the Casualty Threshold Amount, then, (i) if no Event of Default shall have occurred and be continuing and, within sixty (60) days of the date of the occurrence of such Casualty, Borrower delivers to Lender a written undertaking to expeditiously commence and to satisfactorily complete with due diligence the Restoration of the affected Properties in accordance with the terms of this Agreement, then (A) if Net Proceeds are paid by the insurance company directly to Borrower subsequent to delivering such undertaking, such Net Proceeds may be retained by Borrower (for the avoidance of doubt, Net Proceeds received by Borrower prior to delivering such undertaking shall be immediately paid to Lender as required by Section 5.2), (B) if Net Proceeds are paid by the insurance company to Lender, such Net Proceeds will be disbursed by Lender to Borrower and (C) Borrower shall conduct the Restoration of the affected Properties in accordance with the terms of Section 5.4(c) and (ii) if an Event of Default shall have occurred and be continuing or Borrower fails to deliver such an undertaking to Lender, then (A) Lender may retain any Net Proceeds received by it, (B) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2, (C) such Net Proceeds shall be applied to the prepayment of the Debt in accordance with Section 2.4.3(c), (D) Borrower shall prepay the Loan in an amount equal to the positive difference between such Net Proceeds and the Allocated Loan Amount for the affected Properties, together with all interest and other amounts required to be paid in connection therewith under Section 2.4.5, and (E) following Borrower’s written request and receipt by Lender of the Net Proceeds and payment by Borrower of the amounts set forth in clause (D) above, Lender shall release the affected Properties from the applicable Mortgage Documents and related Liens, provided, that (x) Borrower has delivered to Lender draft releases (and, in the event any of the Mortgages and the Assignments of Leases and Rents applicable to any of the affected Properties encumber other Property(ies) in addition to the affected Properties, such release shall be a partial release that relates only to the affected Property(ies) and does not affect the Liens and security interests encumbering or on the other Property(ies)) in form and substance appropriate for the jurisdiction in which such affected Properties are located and shall contain standard provisions protecting the rights of Lender and (y) Borrower shall pay all costs, taxes and expenses associated with such release (including, without limitation, cost to file and record the release and Lender’s reasonable attorneys’ fees). (b) If the Net Proceeds reasonably expected to be received in connection with any single Casualty event is greater than the Casualty Threshold Amount, then, (i) if no Event of Default shall have occurred and be continuing and, within sixty (60) days of the date of the occurrence of such Casualty, Borrower delivers to Lender a written undertaking to expeditiously commence and to satisfactorily complete with due diligence the Restoration of the affected Properties in accordance with the terms of this Agreement, then (A) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2 and (B) Borrower shall conduct the Restoration of the affected Properties in accordance with the terms of and subject to the conditions of Section 5.4(d) and (ii) if an Event of Default shall have occurred and be continuing or Borrower fails to deliver such an undertaking to Lender, then (A) Lender may retain any Net Proceeds received by it, (B) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2, (C) such Net Proceeds shall be applied to the prepayment of the Debt in accordance with Section 2.4.3(c), (D) Borrower shall prepay the Loan in an amount equal to the positive difference between such Net Proceeds and the Allocated Loan Amount for the affected Properties, together with all interest and other amounts required to be paid in connection therewith under Section 2.4.5, and (E) following Borrower’s written request and receipt by Lender of the Net Proceeds and payment by Borrower of the amounts set forth in clause (D) above, Lender shall release the affected Properties from the applicable Mortgage Documents and related Liens, provided, that (x) Borrower has delivered to Lender draft releases (and, in the event any of the Mortgages and the Assignments of Leases and Rents applicable to any of the affected Properties encumber other Property(ies) in addition to the affected Properties, such release shall be a partial release that relates only to the affected Property(ies) and does not affect the Liens and security interests encumbering or on the other Property(ies)) in form and substance appropriate for the jurisdiction in which such affected Properties are located and shall contain standard provisions protecting the rights of Lender and (y) Borrower shall pay all costs, taxes and expenses associated with such release (including, without limitation, cost to file and record the release and Lender’s reasonable attorneys’ fees). (c) If Borrower elects to undertake the Restoration of a Property or Properties pursuant to Section 5.4(a), (i) Borrower shall commence the Restoration as soon as reasonably practicable (but in no event later than ninety (90) days after such Casualty occurs) and shall diligently pursue the same to satisfactory completion; (ii) Borrower shall cause the affected Property and the use thereof after the Restoration to be in compliance with and permitted under all applicable Legal Requirements and such Property, after Restoration, shall be of the same character as prior to such damage or destruction; (iii) the Restoration shall be done and completed by Borrower in an expeditious and diligent fashion and in compliance with all applicable Legal Requirements and the Renovation Standards and (iv) Borrower shall deliver, or cause to be delivered, to Lender a signed detailed budget approved in writing by Borrower’s architect or engineer stating the entire cost of completing the Restoration, which budget shall be reasonably acceptable to Lender. (d) If Borrower elects to undertake the Restoration of a Property or Properties pursuant to Section 5.4(b), the following provisions shall apply: (i) the Net Proceeds shall be made available to Borrower for Restoration upon the determination of Lender that the following conditions are met: (i) Borrower shall commence the Restoration as soon as reasonably practicable (but in no event later than ninety (90) days after such Casualty occurs) and shall diligently pursue the same to satisfactory completion; (ii) Lender shall be satisfied that any operating deficits, including all scheduled payments of principal and interest under the Note, which will be incurred with respect to the Properties as a result of the occurrence of the Casualty, whichever the case may be, will be covered out of (1) the Net Proceeds, (2) the insurance coverage referred to in Section 5.1.1 (a) (ii), if applicable, or (3) by other funds of Borrower; (iii) Lender shall be satisfied that the Restoration will be completed on or before the earliest to occur of (1) the date six (6) months prior to the Stated Maturity Date, as extended pursuant to Section 2.7, (2) the earliest date required for such completion under the terms of any Lease, (3) such time as may be required under applicable Legal Requirements or (4) six (6) months prior to the expiration of the insurance coverage referred to in Section 5.1.1 (a) (ii); (iv) Borrower shall cause the affected Property and the use thereof after the Restoration to be in compliance with and permitted under all applicable Legal Requirements and such Property, after Restoration, shall be of the same character as prior to such damage or destruction; (v) the Restoration shall be done and completed by Borrower in an expeditious and diligent fashion and in compliance with all applicable Legal Requirements and the Renovation Standards; (vi) Borrower shall deliver, or cause to be delivered, to Lender a signed detailed budget approved in writing by Borrower’s architect or engineer stating the entire cost of completing the Restoration, which budget shall be reasonably acceptable to Lender and (vii) the Net Proceeds together with any cash or cash equivalent deposited by Borrower with Lender are sufficient in Lender’s discretion to cover the cost of the Restoration. (ii) The Net Proceeds shall be held by Lender in the Casualty and Condemnation Account and, until disbursed in accordance with the provisions of this Section 5.4(d), shall constitute additional security for the Debt and other obligations under the Loan Documents. The Net Proceeds shall be disbursed by Lender to, or as directed by, Borrower from time to time during the course of the Restoration, upon receipt of evidence satisfactory to Lender that (A) all materials installed and work and labor performed (except to the extent that they are to be paid for out of the requested disbursement) in connection with the Restoration have been paid for in full, and (B) there exist no notices of pendency, stop orders, mechanic’s or materialman’s liens or notices of intention to file same, or any other liens or encumbrances of any nature whatsoever on the Properties which have been fully bonded to the satisfaction of Lender and discharged of record or in the alternative fully insured to the satisfaction of Lender by the title company issuing the Title Insurance Policy. (iii) All plans and specifications required in connection with the Restoration shall be subject to the prior approval of Lender and an independent consulting engineer selected by Lender (the “Casualty Consultant”). Lender shall have the use of the plans and specifications and all permits, licenses and approvals required or obtained in connection with the Restoration. The identity of the contractors, subcontractors and materialmen engaged in the Restoration, as well as the contracts under which they have been engaged, shall be subject to the approval of Lender and the Casualty Consultant. All costs and expenses incurred by Lender in connection with recovering, holding and advancing the Net Proceeds for the Restoration including, without limitation, reasonable attorneys’ fees and disbursements and the Casualty Consultant’s fees and disbursements, shall be paid by Borrower. (iv) In no event shall Lender be obligated to make disbursements of the Net Proceeds in excess of an amount equal to the costs actually incurred from time to time for work in place as part of the Restoration, as certified by the Casualty Consultant, less the Casualty Retainage. The term “Casualty Retainage” shall mean, as to each contractor, subcontractor or materialman engaged in the Restoration, an amount equal to ten percent (10%) of the costs actually incurred for work in place as part of the Restoration, as certified by the Casualty Consultant, until the Restoration has been completed. The Casualty Retainage shall in no event, and notwithstanding anything to the contrary set forth above in this Section 5.4(d), be less than the amount actually held back by Borrower from contractors, subcontractors and materialmen engaged in the Restoration. The Casualty Retainage shall not be released until the Casualty Consultant certifies to Lender that the Restoration has been completed in accordance with the provisions of this Section 5.4(b) and that all approvals necessary for the re-occupancy and use of the Property have been obtained from all appropriate Governmental Authorities, and Lender receives evidence satisfactory to Lender that the costs of the Restoration have been paid in full or will be paid in full out of the Casualty Retainage; provided, however, that Lender will release the portion of the Casualty Retainage being held with respect to any contractor, subcontractor or materialman engaged in the Restoration as of the date upon which (x) the Casualty Consultant certifies to Lender that such contractor, subcontractor or materialman has satisfactorily completed all work and has supplied all materials in accordance with the provisions of such contractor’s, subcontractor’s or materialman’s contract, (y) the contractor, subcontractor or materialman delivers the lien waivers and evidence of payment in full of all sums due to the contractor, subcontractor or materialman as may be reasonably requested by Lender or by the title company issuing the Title Insurance Policy, and (z) Lender receives an endorsement to the Title Insurance Policy insuring the continued priority of the Lien of the Mortgage and evidence of payment of any premium payable for such endorsement. If required by Lender, the release of any such portion of the Casualty Retainage shall be approved by the surety company, if any, which has issued a payment or performance bond with respect to the contractor, subcontractor or materialman.
Notice; Restoration Borrower shall promptly give Lender notice of the actual or threatened commencement of any condemnation or eminent domain proceeding affecting the Property (a “Condemnation”) and shall deliver to Lender copies of any and all papers served in connection with such Condemnation. Following the occurrence of a Condemnation, Borrower, regardless of whether an Award is available, shall promptly proceed to restore, repair, replace or rebuild the Property in accordance with Legal Requirements to the extent practicable to be of at least equal value and of substantially the same character (and to have the same utility) as prior to such Condemnation.
Remedial Work (i) Notwithstanding any previous test or certification, the Authority’s Engineer may instruct the Contractor to: (a) remove from the Site and replace any Plant or Materials which are not in accordance with the provisions of this Agreement; (b) remove and re-execute any work which is not in accordance with the provisions of this Agreement and the Specification and Standards; and (c) execute any work which is urgently required for the safety of the Project Highway, whether because of an accident, unforeseeable event or otherwise; provided that in case of any work required on account of a Force Majeure Event, the provisions of Clause 21.6 shall apply. (ii) If the Contractor fails to comply with the instructions issued by the Authority’s Engineer under Clause 11.13 (i), within the time specified in the Authority’s Engineer’s notice or as mutually agreed, the Authority’s Engineer may advise the Authority to have the work executed by another agency. The cost so incurred by the Authority for undertaking such work shall, without prejudice to the rights of the Authority to recover Damages in accordance with the provisions of this Agreement, be recoverable from the Contractor and may be deducted by the Authority from any monies due to be paid to the Contractor.
Tenant Improvement Plans Any work proposed by Tenant (the “Tenant Improvements”) shall be subject to Landlord’s reasonable prior approval and shall be subject to the other terms and conditions of this Exhibit C; provided that it will be reasonable for Landlord to withhold its approval or consent (as and when applicable under this Exhibit C) if Landlord’s Mortgagee has not consented to the matter that is the subject of such approval or consent. All architectural, engineering and other design fees shall be paid by Tenant. Tenant shall use its architect, engineers and other design professionals, all of whom shall comply with any applicable licensing or governmental requirements of the City of Seattle and the State of Washington; Tenant’s architect shall be approved by Landlord (“Tenant’s Architect”), which approval shall not be unreasonably withheld, conditioned or delayed. Landlord shall also be entitled to receive a copy of the agreement between Tenant and Tenant’s Architect (the “Architect Agreement”). Tenant shall cause Tenant’s Architect to prepare a draft space plan (the “Space Plan”) for the Tenant Improvements and shall submit the proposed Space Plan to Landlord for the latter’s approval (not to be unreasonably withheld) in a time period to allow Tenant to timely complete its Tenant Improvements under this Lease. Landlord shall deliver to Tenant any written objections, questions or comments of Landlord with regard to the Space Plan within ten (10) business days of receipt; Landlord’s consent thereto shall be deemed given if not denied in writing within said ten (10) business day period. If Landlord denies its approval, it shall specify the reasons for doing so in detail. Tenant shall cause the Space Plan to be revised to address such written comments and shall resubmit said Space Plan to Landlord for approval. Such process shall continue until Landlord has approved the Space Plan. Tenant’s Architect shall then prepare working drawings and specifications for the Tenant Improvements, including architectural, structural, plumbing, mechanical, electrical, and fire protection drawings as required, suitable for permit application (the “Working Drawings”) and shall submit the proposed Working Drawings to Landlord for the latter’s approval in a time period to allow Tenant to timely complete its Tenant Improvements under this Lease. The Space Plan and Working Drawings shall be subject to Landlord’s approval, which Landlord agrees shall not be unreasonably withheld, conditioned, or delayed. Landlord shall not be deemed to have acted unreasonably if it withholds its approval thereof because, in Landlord’s reasonable opinion, the work, as described in any such item: (i) is likely to adversely affect Building Systems, the structure of the Building or the safety of the Building and/or their occupants; (ii) might impair Landlord’s ability to furnish services to Tenant or other tenants in the Building; (iii) would materially increase the cost of operating the Building; (iv) would violate any governmental laws, rules or ordinances (or interpretations thereof); (v) contains or uses hazardous or toxic materials or substances; (vi) would negatively affect the appearance of the Building; (vii) is reasonably likely to adversely affect another tenant’s premises; or (viii) is prohibited by any ground lease affecting the Building or any mortgage, trust deed or other instrument encumbering the Building. Landlord shall deliver to Tenant any written objections, questions or comments of Landlord with regard to the Working Drawings, within ten (10) business days of Landlord’s receipt of the Working Drawings; Landlord’s consent thereto shall be deemed given if not denied in writing within said ten (10) business day period. If Landlord denies its approval, it shall specify the reasons for doing so in detail. Tenant shall cause the Working Drawings to be revised to address such written comments and shall resubmit said Working Drawings to Landlord for approval. Landlord may, when approving the Tenant Improvement Plans, elect to require Tenant to remove any Non-Standard Improvements which are made to the Premises. If Landlord so elects, Tenant shall, at its own cost, restore the Premises to the condition designated by Landlord in its election, before the last day of the Term. Such process shall continue until both parties have approved the Working Drawings. Landlord’s approval of the Space Plan and/or the Working Drawings shall not be deemed any representation or warranty that the same comply with applicable codes.
Hazardous Materials; Remediation (a) If any release or disposal of Hazardous Materials shall occur or shall have occurred on any real property or any other assets of any Borrower or any other Credit Party, such Borrower will cause, or direct the applicable Credit Party to cause, the prompt containment and removal of such Hazardous Materials and the remediation of such real property or other assets as is necessary to comply with all Laws and to preserve the value of such real property or other assets. Without limiting the generality of the foregoing, each Borrower shall, and shall cause each other Credit Party to, comply with each Law requiring the performance at any real property by any Borrower or any other Credit Party of activities in response to the release or threatened release of a Hazardous Material. (b) Borrower will provide Agent within thirty (30) days after written demand therefor with a bond, letter of credit or similar financial assurance evidencing to the reasonable satisfaction of Agent that sufficient funds are available to pay the cost of removing, treating and disposing of any Hazardous Materials or Hazardous Materials Contamination and discharging any assessment which may be established on any property as a result thereof, such demand to be made, if at all, upon Agent’s determination that the failure to remove, treat or dispose of any Hazardous Materials or Hazardous Materials Contamination, or the failure to discharge any such assessment could reasonably be expected to have a Material Adverse Change. (c) If there is any conflict between this Section 6.10 and any environmental indemnity agreement which is a Financing Document, the environmental indemnity agreement shall govern and control.
Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.
SAVINGS/FORCE MAJEURE A Force Majeure occurrence is an event or effect that cannot be reasonably anticipated or controlled and is not due to the negligence or willful misconduct of the affected party. Force Majeure includes, but is not limited to, acts of God, acts of war, acts of public enemies, terrorism, strikes, fires, explosions, actions of the elements, floods, or other similar causes beyond the control of the Contractor or the Commissioner in the performance of the Contract where non- performance, by exercise of reasonable diligence, cannot be prevented. The affected party shall provide the other party with written notice of any Force Majeure occurrence as soon as the delay is known and provide the other party with a written contingency plan to address the Force Majeure occurrence, including, but not limited to, specificity on quantities of materials, tooling, people, and other resources that will need to be redirected to another facility and the process of redirecting them. Furthermore, the affected party shall use its commercially reasonable efforts to resume proper performance within an appropriate period of time. Notwithstanding the foregoing, if the Force Majeure condition continues beyond thirty (30) days, the Parties shall jointly decide on an appropriate course of action that will permit fulfillment of the Parties’ objectives hereunder. The Contractor agrees that in the event of a delay or failure of performance by the Contractor, under the Contract due to a Force Majeure occurrence: a. The Commissioner may purchase from other sources (without recourse to and by the Contractor for the costs and expenses thereof) to replace all or part of the Products which are the subject of the delay, which purchases may be deducted from the Contract quantities without penalty or liability to the State, or b. The Contractor will make commercially reasonable efforts to provide Authorized Users with access to Products first in order to fulfill orders placed before the Force Majeure event occurred. The Commissioner agrees that Authorized Users shall accept allocated performance or deliveries during the occurrence of the Force Majeure event. Neither the Contractor nor the Commissioner shall be liable to the other for any delay in or failure of performance under the Contract due to a Force Majeure occurrence. Any such delay in or failure of performance shall not constitute default or give rise to any liability for damages. The existence of such causes of such delay or failure shall extend the period for performance to such extent as determined by the Contractor and the Commissioner to be necessary to enable complete performance by the Contractor if reasonable diligence is exercised after the cause of delay or failure has been removed. Notwithstanding the above, at the discretion of the Commissioner where the delay or failure will significantly impair the value of the Contract to the State or to Authorized Users, the Commissioner may terminate the Contract or the portion thereof which is subject to delays, and thereby discharge any unexecuted portion of the Contract or the relative part thereof. In addition, the Commissioner reserves the right, in his/her sole discretion, to make an equitable adjustment in the Contract terms and/or pricing should extreme and unforeseen volatility in the marketplace affect pricing or the availability of supply. "Extreme and unforeseen volatility in the marketplace" is defined as market circumstances which meet the following criteria: (i) the volatility is due to causes outside the control of Contractor; (ii) the volatility affects the marketplace or industry, not just the particular Contract source of supply; (iii) the effect on pricing or availability of supply is substantial; and (iv) the volatility so affects Contractor's performance that continued performance of the Contract would result in a substantial loss. Failure of the Contractor to agree to any adjustment shall be a dispute under the Disputes clause; provided however, that nothing in this clause shall excuse the Contractor from performing in accordance with the Contract as changed.
Complete Taking If at any time during the Fee Term title to or temporary use of the entire Project should become vested in a public or quasi-public authority by virtue of the exercise of a taking by condemnation, inverse condemnation or the right of eminent domain, or by voluntary transfer under threat of such taking, or in the event that title to a portion of the Project shall be taken rendering continued occupancy of the Project commercially infeasible in the judgment of the Sponsor, the Sponsor shall have the option to terminate this Fee Agreement as of the time of vesting of title by sending written notice to the County within a reasonable period of time following such vesting.
Remediation The Charter School shall provide remediation in required cases pursuant to State Board of Education Rule 160-4-5-.01 and No Child Left Behind.