APPLICABLE TARIFF 9.1 Subsequent to commencement of power supply by the RPD on the terms contained in this Agreement, the RPD shall be entitled to receive the tariff of Rs. /kWh [Insert the Tariff discovered through the bidding process conducted by SECI], fixed for the entire Term of this Agreement. 9.2 In cases of early commencement of power supply, till SCSD, the RPD will be free to sell the electricity generated to any entity other than the SECI/ Buying Entity(ies), only after giving the first right of refusal to the SECI/Buying Entity(ies). The Buying Entity(ies)/SECI shall provide refusal within 15 (fifteen) Days from the receipt of the request, beyond which it would be considered as deemed refusal. The 15-Day period will be applicable separately for SECI and the Buying Entity(ies). In case SECI/Buying Entity agree to purchase power from a date prior to the SCSD, such power shall be purchased at the Applicable Tariff plus SECI’s trading margin. 9.3 In case of multiple Project components, and in case one or more such component (wind or solar PV or any other RE power generating source) is ready for injection of power into the grid, but the remaining component is unable to commence power supply, the RPD will be allowed to commence power supply from such component which is ready, outside the ambit of this Agreement. Following should be noted under this scenario: (a) First right of refusal for such power shall vest with the Buying Entity(ies). Subsequent to refusal of such power by the Buying Entity(ies), the right of refusal shall vest with SECI. (b) In case SECI/Buying Entity(ies) decides to buy such discrete component’s power outside the PPA, such power shall be purchased at 50% of the Applicable Tariff. In case the same is procured through SECI, trading margin of Rs. 0.07/kWh will be applicable on such power procurement. (c) The above scenario will be applicable until the RPD commences supply of power to the Buying Entity(ies) under the provisions of this Agreement.
Uncontrollable Forces Tariff Provisions Section 14.1 of the CAISO Tariff shall be incorporated by reference into this Agreement except that all references in Section 14.1 of the CAISO Tariff to Market Participants shall be read as a reference to the Participating Generator and references to the CAISO Tariff shall be read as references to this Agreement.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria
Non-tariff Measures 1. A Party shall not adopt or maintain any non-tariff measures on the importation of any good of the other Party or on the exportation of any good destined for the territory of the other Party except in accordance with its WTO rights and obligations or in accordance with other provisions of this Agreement. 2. Each Party shall ensure its non-tariff measures permitted in paragraph 1 are not prepared, adopted or applied with a view to, or with the effect of, creating unnecessary obstacles to trade between the Parties.
Service Level Commitment IBM provides the following service level commitment (“SLA”) for the Cloud Service, after IBM makes the Cloud Service available to you.
Unbundled Voice Loops (UVLs) 2.2.1 BellSouth shall make available the following UVLs:
QUANTITY CHANGES PRIOR TO AWARD The Commissioner reserves the right, at any time prior to the award of a specific quantity Contract, to alter in good faith the quantities listed in the Bid Specifications. In the event such right is exercised, the lowest responsible Bidder meeting Bid Specifications will be advised of the revised quantities and afforded an opportunity to extend or reduce its Bid price in relation to the changed quantities. Refusal by the low Bidder to so extend or reduce its Bid price may result in the rejection of its Bid and the award of such Contract to the lowest responsible Bidder who accepts the revised qualifications.
Long Term Cost Evaluation Criterion 4. READ CAREFULLY and see in the RFP document under "Proposal Scoring and Evaluation". Points will be assigned to this criterion based on your answer to this Attribute. Points are awarded if you agree not increase your catalog prices (as defined herein) more than X% annually over the previous year for the life of the contract, unless an exigent circumstance exists in the marketplace and the excess price increase which exceeds X% annually is supported by documentation provided by you and your suppliers and shared with TIPS, if requested. If you agree NOT to increase prices more than 5%, except when justified by supporting documentation, you are awarded 10 points; if 6% to 14%, except when justified by supporting documentation, you receive 1 to 9 points incrementally. Price increases 14% or greater, except when justified by supporting documentation, receive 0 points. increases will be 5% or less annually per question Required Confidentiality Claim Form This completed form is required by TIPS. By submitting a response to this solicitation you agree to download from the “Attachments” section, complete according to the instructions on the form, then uploading the completed form, with any confidential attachments, if applicable, to the “Response Attachments” section titled “Confidentiality Form” in order to provide to TIPS the completed form titled, “CONFIDENTIALITY CLAIM FORM”. By completing this process, you provide us with the information we require to comply with the open record laws of the State of Texas as they may apply to your proposal submission. If you do not provide the form with your proposal, an award will not be made if your proposal is qualified for an award, until TIPS has an accurate, completed form from you. Read the form carefully before completing and if you have any questions, email Xxxx Xxxxxx at TIPS at xxxx.xxxxxx@xxxx-xxx.xxx If the vendor is awarded a contract with TIPS under this solicitation, the vendor agrees to make any Choice of Law clauses in any contract or agreement entered into between the awarded vendor and with a TIPS member entity to read as follows: "Choice of law shall be the laws of the state where the customer resides" or words to that effect.