INSULATION RESISTANCE Sample Clauses

INSULATION RESISTANCE. The insulation resistance shall be measured between phases, between phase and neutral and between phase and earth. The insulation resistance shall be measured with 1000Volts megger, both before and after high voltage power frequency test. The insulation resistance shall not be less than two megaohm in any case.
AutoNDA by SimpleDocs
INSULATION RESISTANCE. (In Mega ohms) :- Check the insulation resistance values of the following motors and record. Check the tightness of the terminations, after connections. • Main hoist Main motor • Micro motor • Long travel Main motor • Micro motor • Cross travel Main motor • Micro motor
INSULATION RESISTANCE. 7.2.1 The insulation resistance shall be measured by applying between earth and the whole system of conductors, or any section thereof with all fuses in place, and all switches closed, and except in earthed concentric wiring, all lamps in position, or both poles of the installation otherwise electrically connected together, a direct current pressure of not less than twice the working pressure, provided it need not exceed 500 volts for medium voltage circuits. Where the supply is derived from a three wire D.C, or a polyphase A.C. system, the neutral pole of which is connected to earth either directly or through added resistance, the working pressure shall be deemed to be that which is maintained between the phase conductor and the neutral. 7.2.2 The insulation resistance shall also be measured between all the conductors connected to one pole, or phase conductor of the supply, and all the conductors connected to the neutral, or to the other pole, or phase conductors of the supply with all the lamps in position and switches in "off' position, and its value shall be not less than that specified in sub-clause 16.2.3. 7.2.3 The insulation resistance in mega ohms measured as above shall not be less than 12.5 mega ohms for the wiring with PYC insulated cables, subject to a minimum of 1 mega ohm. 7.2.4 Where a whole installation is being tested, a lower value than that given by the formula, subject to a minimum of 1 mega ohm, is acceptable. 7.2.5 A preliminary and similar test may be made before the lamps etc. are installed, and in this event the insulation resistance to earth should not be less than 25 mega ohms for the wiring with PYC insulted cables, subject to a minimum of 2 mega ohms. 7.2.6 The term "outlet" includes every point along with every switch, except that a switch combined with a socket outlet, appliance or lighting fitting is regarded as one outlet. 7.2.7 Control rheostats, heating and power appliances and electric signs may, if required, be disconnected from the circuit during the test, but in that event the insulation resistance between the case or frame work, and all live parts of each rheostat, appliance and sign, shall be not less than that specified in the relevant Indian Standard Specifications, or where there is no such Speci- fication, shall be not less than one mega ohm.
INSULATION RESISTANCE. The insulation resistance between line (phase) and neutral, the line (phase) and earth and the neutral and earth shall not be less than one mega ohms when tested with 500 volts direct circuit (D.C.) supply.
INSULATION RESISTANCE. Each circuit, except 110 volt A.C. wiring, shall have an insulation resistance check between conductors and, with the main neutral temporarily ungrounded, from conductors to ground and the results recorded. The equipment shall be disconnected from circuits to enable satisfactory resistance values to be obtained.
INSULATION RESISTANCE. This measurement was done with a programmable electrometer. The measuring voltage was 100 Volt during one minute. EIA 364-20: DIELECTRIC WITHSTANDING VOLTAGE: This measurement was done with a high voltage tester. The test duration was one minute at 750Vac. EIA 364-32: THERMAL SHOCK: Method II. The samples were subjected to a thermal shock test with the following parameters: One cycle consists of: Upper temperature : -65°C for 30 minutes. Lower temperature : 105°C for 30 minutes. Condition : unmated. Number of cycles 5 EIA 364-31: THERMAL CYCLING TEST: Method III The samples were subjected to a thermal cycling test with the following parameters: One cycle consists of: Upper temperature : 65°C Lower temperature : 25°C Relative humidity : 95% Condition : unmated. Number of cycles 10 visual examination insulation resistance dielectric withstanding voltage thermal shock humidity-temperature cycling insulation resistance dielectric withstanding voltage final visual examination

Related to INSULATION RESISTANCE

  • Insulation In exterior walls? Yes No Unknown In ceiling/attic? Yes No Unknown In any other areas? Yes No Where? Comments:

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Explosives Explosives or other highly flammable substances shall not be stored or used on Railroad's property without the prior written approval of Railroad.

  • Mold The Contractor shall take steps to prevent mold from developing on the Site, or being released into the air and shall promptly decontaminate any areas of mold that develop.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Asbestos Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration.

  • Chemical Substances Supplier warrants that: (i) each chemical substance contained in Products is on the inventory of chemical substances compiled and published by the Environmental Protection Agency pursuant to the Toxic Substances Control Act and (ii) all Material Safety Data Sheets required to be provided by Supplier for Products shall be provided to DXC prior to shipment of the Products and shall be complete and accurate.

  • Physical Distancing People must be at least six-feet apart when feasible Cleaning/Disinfecting Protocol Minnesota COVID 19 Preparedness Plan

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • Vaccination and Inoculation ‌ (a) The Employer agrees to take all reasonable precautions to limit the spread of infectious diseases among employees, including in-service seminars for employees. Where the Employer or Occupational Health and Safety Committee identifies high risk areas which expose employees to infectious or communicable diseases for which there are protective immunizations available, such immunizations shall be provided at no cost to the employee. The Committee may consult with the Medical Health Officer. Where the Medical Health Officer identifies such a risk, the immunization shall also be provided at no cost. The Employer shall provide Hepatitis B vaccine, free of charge, to those employees who may be exposed to bodily fluids or other sources of infection. (b) An employee may be required by the Employer, at the request of and at the expense of the Employer, to take a medical examination by a physician of the employee's choice. Employees may be required to take skin tests, x-ray examination, vaccination, and other immunization (with the exception of a rubella vaccination when the employee is of the opinion that a pregnancy is possible), unless the employee's physician has advised in writing that such a procedure may have an adverse effect on the employee's health.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!