Integrated Surface Sampling Sample Clauses

Integrated Surface Sampling. Integrated surface sampling, including field procedures and equipment, shall be conducted in accordance with the Guidelines and the approved Compliance Plan for each landfill. One integrated surface sample will be collected from each of the established sampling grids during each sampling event. Each integrated surface sample must be collected over a continuous 25- minute period while a field technician walks a prescribed path over the sampling grid. The samples shall be collected in 10-liter Tedlar bags using a non-contaminating pump. The probe of the sampling pump shall be held at a distance of not more than 3 inches above the surface of the landfill during sample collection. The Tedlar bags shall be enclosed within lightproof cardboard boxes to reduce the potential for photo-degradation of air contaminants targeted for analysis. Any samples containing greater than 25 ppmv TOC shall be recorded as an exceedance and the grid shall be identified as an area in need of remediation. To initiate remediation, the Contractor shall notify the Site Engineer of the landfill and the County PM of exceedance areas within 24 hours of identification. Contractor shall coordinate with the County PM (or his designee) to enact remediation measures. At the Xxxxxxxx Canyon Landfill, Contractor shall be responsible for remediation measures related to the operation of the LFGCCS, including, but not limited to, adjustment of extraction xxxxx in the general vicinity. The County shall provide additional compacted cover material to specific exceedance areas when necessary. Following implementation of mitigation measures, and within 10 days of the initial exceedance, the Contractor shall re-monitor all exceedance areas; and, within 24 hours, notify the County PM of continued non-compliance. Two attempts at remediation and re-monitoring shall be performed under the non-routine portion of this project. In accordance with the Guidelines, if an exceedance still exists after two remediation attempts, the Contractor shall make recommendations of LFGCCS modifications, to the County, to bring the landfill into compliance with the applicable regulatory requirements. As a means of tracking remediation of exceedance areas, Integrated Surface Monitoring (ISM) Data Sheets shall be filled out and distributed to appropriate personnel. ISM data sheet format shall conform to the specifications of the County. Contractor shall notify the PM in writing of any outstanding exceedances within twenty-four (...

Related to Integrated Surface Sampling

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If ECI chooses to subtend a Verizon access Tandem, ECI’s NPA/NXX must be assigned by ECI to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 ECI shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from ECI’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office ECI utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow ECI’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

  • Animals The Hirer shall ensure that no animals (including birds) except guide dogs are brought into the premises, other than for a special event agreed to by the Village Hall. No animals whatsoever are to enter the kitchen at any time.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.