ISP-1 Simulation of design data Sample Clauses

ISP-1 Simulation of design data. Title of KPI Calculation of trends in simulation results related to stress, vibration or sound Defined Frequency oriented trend calculation in complex stress, vibration or sound simulations can consume and operate real-time related to the simulator output (computing power adapted) Measured Comparison output and trend generation Target No Difference Title of KPI Early recognition of result trends in simulation results related to stress Defined Frequency oriented trend calculation in complex stress, sound or vibration simulations should be reduced by trend calculation Measured Time spent to recognize xxxxxxx vibration or sound trends frequency by frequency Target Minimize Title of KPI Prediction of simulation results related to stress, sound or vibration Defined Prediction calculation out of trend analysis on relation to expected overshoot of given thresholds in stress, sound or vibration, stop of current simulation run; adaptive visualization of prediction and restart of the simulation with new parameters if overshoot is predicted. Measured Trend and prediction calculation Target Real-time calculation with direct visualization equal to simulation process progress Title of KPI Improvement of the complete simulation process Defined Time comparison between traditional simulation process and new methodology Measured % Target 20 % maximize Title of KPI Demonstrators for entire project Definedstakeholder identification  identify data and information needs related to stakeholders  identification of data to be extracted from large data streams  selection and prioritization of the data  Processing of massive data streams o quality assurance of data and models o identification of meta-knowledge o specification and implementation of software modules for data acquisition and processing o implementation of a method for data management when scaling up from one machine tool to a large number of machine tools Measured Percentage (%) Target 100% completion of definition for all sub-points
AutoNDA by SimpleDocs

Related to ISP-1 Simulation of design data

  • Release of Design Plan The Engineer (1) will not release any roadway design plan created or collected under this contract except to its subproviders as necessary to complete the contract; (2) shall include a provision in all subcontracts which acknowledges the State’s ownership of the design plan and prohibits its use for any use other than the project identified in this contract; and (3) is responsible for any improper use of the design plan by its employees, officers, or subproviders, including costs, damages, or other liability resulting from improper use. Neither the Engineer nor any subprovider may charge a fee for the portion of the design plan created by the State.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • If Designated If the HSP is Designated it will:

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Specific Provisions for Access Rights to Software For the avoidance of doubt, the general provisions for Access Rights provided for in this Section 9 are applicable also to Software. Parties’ Access Rights to Software do not include any right to receive source code or object code ported to a certain hardware platform or any right to receive respective Software documentation in any particular form or detail, but only as available from the Party granting the Access Rights.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

Time is Money Join Law Insider Premium to draft better contracts faster.