Large Facility Modification Request. The undersigned Developer submits this request to modify an Interconnection Request for a Large Generating Facility or Class Year Transmission Project currently in the NYISO’s Interconnection Queue.
Large Facility Modification Request. The undersigned Developer submits this request to modify an Interconnection Request for a Large Generating Facility or Class Year Transmission Project currently in the NYISO’s Interconnection Queue. Queue No. (if applicable): _________ Project Name: _______________________________ Nature of proposed modification (check all that apply): ___ Change in Electric Output (MW) of the Large Facility ___ Modification of Technical Parameters of Large Facility’s Technology and Transformer Impedances ___ Modification to Interconnection Configuration ___ Technological Change or Advancement ___ Extension of Commercial Operation Date ___ Other Modification Not Listed Above Description of proposed modification: ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Attach a revised conceptual breaker one-line diagram and a project location geo map, as applicable. If the modification is a decrease in the facility capacity or requested interconnection service, provide an explanation for the decrease, including a description of the injection-limiting equipment with all the necessary parameters of such equipment, as applicable: ______________________________________________________________________________ Proposed modification to an Interconnection Request due to a technological advancement, which includes advancements to turbines, inverters, or plant supervisory controls or other similar advancements to the existing technology proposed in the Interconnection Request (NOTE: a technological advancement will be evaluated under Section 30.4.4.7 of Attachment X to the OATT, which requires a $10,000 study deposit be submitted with this form). If the modification is due to a technological advancement to the technology originally proposed, detail the proposed configuration of the technological advancement and the manner of installation: ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Provide the parameters associated with the proposed technological advancement: Pa...
Large Facility Modification Request. The undersigned Interconnection CustomerDeveloper submits this request to modify: (i) an Interconnection Request for a Large Generating Facility or Class Year Transmission Project currently in the NYISO’s Interconnection Queue or (ii) an existing Facility that (a) is currently in commercial operation or (b) has an executed interconnection agreement.