Light-Rail Noise Impacts Sample Clauses

Light-Rail Noise Impacts. 00 Xxxxx 00xx Xxxxxx, project noise levels are predicted to meet, or exceed the FTA 25 criteria at 20 single-family residences. Of these, four have been determined NRHP 26 eligible: 27 DAHP ID Address 28 116 000 X 00xx Xxxxxx 29 129 000-000 X 00xx Xxxxxx 30 119 000 X 00xx Xxxxxx 31 133 000 X 00xx Xxxxxx 32 Mitigation for light rail noise impacts include sound barriers, track lubrication at 33 curves, and other features designed into the infrastructure itself as well as residential 34 sound insulation. Building retrofits are considered on a case-by-case basis and 35 determined during the final design stage. In coordination with DAHP, the proposed 36 modifications for these four NRHP-eligible houses, will be reviewed for consistency 37 with the Secretary of the Interior Standards for Rehabilitation (Deadline: Prior to 38 Light Rail construction).
AutoNDA by SimpleDocs
Light-Rail Noise Impacts. Along 17th Avenue, project noise levels are predicted to meet, or exceed the FTA criteria at 20 single-family residences. Of these, four have been determined NRHP eligible: DAHP ID Address 116 000 X 00xx Xxxxxx 000 000-000 X 00xx Xxxxxx 000 000 X 00xx Xxxxxx 133 000 X 00xx Xxxxxx Mitigation for light rail noise impacts include sound barriers, track lubrication at curves, and other features designed into the infrastructure itself as well as residential sound insulation. Building retrofits are considered on a case-by-case basis and determined during the final design stage. In coordination with DAHP, the proposed modifications for these four NRHP-eligible houses, will be reviewed for consistency with the Secretary of the Interior Standards for Rehabilitation (Deadline: Prior to Light Rail construction).

Related to Light-Rail Noise Impacts

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Alpine Areas The employer shall pay an Alpine disability allowance of $2.50 per hour worked on projects in alpine areas.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!