Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.
Additional Equipment Additional Equipment may from time to time be added as the subject matter of this Agreement as agreed on by the parties. Any additional property will be added in an amendment describing the property, the monthly rental, security deposit, and stipulated loss value of the additional Equipment. All amendments must be in writing and signed by both parties. Other than by this amendment procedure, this Agreement may not be amended, modified, or altered in any manner except in writing signed by both parties.
Special Equipment The Employer agrees to provide specialty tools, emergency supplies/equipment, testing equipment and safety equipment as needed to perform required duties as determined and authorized by the Chief or designee. The emergency supplies/equipment will include appropriate survival provisions and equipment for each permanent Maintenance Mechanic 4 and the Law Enforcement Communications Systems Supervisor when they are performing duties that would require such provisions and equipment. When necessary, the employer will replenish used or expired survival provisions and damaged and unusable equipment. All supplies and equipment will be returned to the employer when the employee is no longer performing the duties that would require the survival provisions and/or equipment.
Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except:
Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)
Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.