Maintenance Factors Sample Clauses

Maintenance Factors 
AutoNDA by SimpleDocs

Related to Maintenance Factors

  • Performance Factors (a) Each party will notify the other party of the existence of a Performance Factor, as soon as reasonably possible after the party becomes aware of the Performance Factor. The Notice will:

  • Maintenance Period During the Maintenance Period the Developer shall at its own expense maintain repair and otherwise S.9 keep the Works in good working order and repair to the reasonable satisfaction of xxx Xxxxxxxxxx unless xxx Xxxxxxxxxx shall declare that any required maintenance and/or repair is an emergency in which case the Developer shall carry out the said maintenance and/or repair immediately Access to the Works and consequences of inspections The Developer shall arrange for xxx Xxxxxxxxxx to have access to the Works and the Site at all

  • Other Factors The Employer may provide for additional formal and informal evaluations as it shall determine to be necessary for the proper conduct of the educational program and the utilization of its employees. The evaluation opinions of the Employer shall not be subject to the Grievance Procedure if the procedures herein set forth have been followed.

  • SECONDARY FACTORS (a) The extent of control which, by agreement, COUNTY may exercise over the details of the work is slight rather than substantial; (b) CONTRACTOR is engaged in a distinct occupation or business; (c) In the locality, the work to be done by CONTRACTOR is usually done by a specialist without supervision, rather than under the direction of an employer; (d) The skill required in the particular occupation is substantial rather than slight; (e) The CONTRACTOR rather than the COUNTY supplies the instrumentalities, tools and work place; The length of time for which CONTRACTOR is engaged is of limited duration rather than indefinite; (g) The method of payment of CONTRACTOR is by the job rather than by the time; (h) The work is part of a special or permissive activity, program, or project, rather than part of the regular business of COUNTY; (i) CONTRACTOR and COUNTY believe they are creating an independent contractor relationship rather than an employee relationship; and The COUNTY conducts public business. It is recognized that it is not necessary that all secondary factors support creation of an independent contractor relationship, but rather that overall there are significant secondary factors which indicate that CONTRACTOR is an independent contractor. By their signatures to this Agreement, each of the undersigned certifies that it is his or her considered judgment that the CONTRACTOR engaged under this Agreement is in fact an independent contractor.

  • Maintenance Programme 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

  • Mitigating Factors The Contractor had a Trafficking in Persons compliance plan or an awareness program at the time of the violation, was in compliance with the plan, and has taken appropriate remedial actions for the violation, that may include reparation to victims for such violations.

  • ADJUSTMENT FACTORS The Contractor will perform any or all Tasks in the Construction Task Catalog for the Unit Price appearing therein multiplied by the following Adjustment Factors. See the General Terms and Conditions for additional information.

  • INTERIM MAINTENANCE PERIOD During the interim maintenance period between obtaining of the completion certificate of Project and formation and operationalization of the Association the Promoter shall through itself or through a facility management company constitute a committee to run, operate, manage and maintain the Common Areas.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Evaluation Factors The walkthrough(s), observation(s), and other components required by Ohio Rev. Code to be used in the teacher evaluation procedure