MEASUREMENT AND EVALUATION OF RF FIELDS Sample Clauses

MEASUREMENT AND EVALUATION OF RF FIELDS. Trained personnel should use measurement procedures and techniques such as those recommended in IEEE C95.3-1991, as basic guidance. This requirement does not preclude using other RF measuring and evaluation methodologies.
AutoNDA by SimpleDocs

Related to MEASUREMENT AND EVALUATION OF RF FIELDS

  • Completion of Evaluation Cycle 1. The summative evaluation rating shall be based upon a preponderance of the evidence, assessed in a holistic manner, that is aligned to the Ohio Educator Standards. Only evidence gathered during the walkthroughs and formal observations that are conducted for the current school year may be used.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Measurement and Billing The Parties shall measure Interconnection in accordance with this Section 4.6 and xxxx in accordance with Article XXVII and this Section 4.6.

  • Finalization of Evaluation A Written Report 1 Before the evaluation cycle is final, and not later than May 10, a copy of the formal written evaluation report shall be given to the teacher and a conference shall be held between the teacher and the evaluator.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurement (and calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project.

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference. Adherence to these accessible technology standards is one way to ensure compliance with the College’s underlying legal obligations to ensure that people with disabilities are able to acquire the same information, engage in the same interactions, and enjoy the same benefits and services within the same timeframe as their nondisabled peers, with substantially equivalent ease of use; that they are not excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in any College programs, services, and activities delivered online, as required by Section 504 and the ADA and their implementing regulations; and that they receive effective communication of the College’s programs, services, and activities delivered online.

  • Program Evaluation The School District and the College will develop a plan for the evaluation of the Dual Credit program to be completed each year. The evaluation will include, but is not limited to, disaggregated attendance and retention rates, GPA of high-school-credit-only courses and college courses, satisfactory progress in college courses, state assessment results, SAT/ACT, as applicable, TSIA readiness by grade level, and adequate progress toward the college-readiness of the students in the program. The School District commits to collecting longitudinal data as specified by the College, and making data and performance outcomes available to the College upon request. HB 1638 and SACSCOC require the collection of data points to be longitudinally captured by the School District, in collaboration with the College, will include, at minimum: student enrollment, GPA, retention, persistence, completion, transfer and scholarships. School District will provide parent contact and demographic information to the College upon request for targeted marketing of degree completion or workforce development information to parents of Students. School District agrees to obtain valid FERPA releases drafted to support the supply of such data if deemed required by counsel to either School District or the College. The College conducts and reports regular and ongoing evaluations of the Dual Credit program effectiveness and uses the results for continuous improvement.

Time is Money Join Law Insider Premium to draft better contracts faster.