Metallic Pipelines Sample Clauses

Metallic Pipelines.  Foreign pipelines, other than utility lines, should install cathodic protection bonds and potential leads at all crossings and terminate them at aboveground locations. The operator of the existing pipeline will install all test leads on the existing pipeline.  The foreign pipeline should be coated with a suitable pipe coating for a distance of at least50 feet on either side of the crossing. (Note this distance may vary among pipeline operators so it is important to check with the pipeline operator during the design phase of the project.) A warning tape, or warning mesh, should be used to indicate the location of a foreign pipeline for a distance of 25 feet on either side of the existing pipeline.
AutoNDA by SimpleDocs

Related to Metallic Pipelines

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Fertilizer Purchaser shall evenly spread the fertilizer listed below on all exposed soil inside the grubbing limits at a rate of 200 pounds per acre of exposed soil. Fertilizer must meet the following specifications: Chemical Component % by Weight Sulphur 3 Inerts 49 SECTION 9 – POST-HAUL ROAD WORK 9-3 CULVERT MATERIAL REMOVED FROM STATE LAND Culverts removed from roads become the property of the Purchaser and must be removed from state land.

  • Petroleum Storage Systems A. At Company’s expense, Company will at all times comply with all federal, state, and local requirements, including but not limited to, the regulations of the FDEP as stated in Chapters 62-761 and 62-762, FAC, the requirements of the Federal Oil Pollution Prevention regulation found in Title 40 of the Code of Federal Regulations Part 112 (40 CFR part 112), as well as the requirements of the Environmental Protection Commission of Hillsborough County (EPC), as may be amended or replaced, pertaining to petroleum storage tank and piping system construction, operation, inspection, and compliance monitoring programs; release detection methods and procedures; maintenance; and preventative maintenance programs. Company will be responsible for all spillage, overflow, or escape of gases, petroleum or petroleum products, and for all fines and penalties in connection therewith. All petroleum storage systems will be registered by Company, and Company will display the registration placard as required by law.

  • Minerals All minerals, crops, timber, trees, shrubs, flowers and landscaping features now or hereafter located on, under or above Land;

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • MINES The Contractor represents and warrants that neither it, its parent entities (if any), nor any of the Contractor’s subsidiaries or affiliated entities (if any) is engaged in the sale or manufacture of anti-personnel mines or components utilized in the manufacture of anti-personnel mines.

  • Dedicated Transport A DS0-, DS1-, or DS3-capacity transmission facility between Verizon switches (as identified in the LERG) or UNE Wire Centers, within a LATA, that is dedicated to a particular end user or carrier. Dedicated Transport is sometimes referred to as dedicated interoffice facilities ("IOF"). Dedicated Transport does not include any facility that does not connect a pair of Verizon UNE Wire Centers.

  • Cloud storage DSHS Confidential Information requires protections equal to or greater than those specified elsewhere within this exhibit. Cloud storage of Data is problematic as neither DSHS nor the Contractor has control of the environment in which the Data is stored. For this reason: