Meter Calibrations Sample Clauses

Meter Calibrations. Citizens shall be kept advised of any repairs, calibrations or adjustments of BHP Refining' s meter equipment. Meters shall be calibrated at least annually. Citizens may witness such meter calibrations, and BHP Refining shall provide three (3) days notice of meter calibrations. Meter readings shall be done by employees or agents of BHP
AutoNDA by SimpleDocs
Meter Calibrations. The meter instrumentation and chart recorders (if applicable) shall be calibrated and inspected at the beginning of the delivery of the LPG at a minimum of every ninety (90) days thereafter. Necessary repairs to or replacement of the metering equipment shall be made when the equipment does not meet the required standards provided in the latest addition of the appropriate industry manual.

Related to Meter Calibrations

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Meters (a) You must allow safe and unhindered access to your premises for the purposes of reading and maintaining the meters (where relevant). (b) We will use our best endeavours to ensure that a meter reading is carried out as frequently as is needed to prepare your bills, consistently with the metering rules and in any event at least once every 12 months.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Metering Data At Developer’s expense, the metered data shall be telemetered to one or more locations designated by Connecting Transmission Owner, Developer and NYISO. Such telemetered data shall be used, under normal operating conditions, as the official measurement of the amount of energy delivered from the Large Generating Facility to the Point of Interconnection.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Tolerances The maximum tolerances within concrete work shall be constructed are as follows:-

  • Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.