Monitoring and Management During Construction Sample Clauses

Monitoring and Management During Construction. Monitoring during construction activities is intended to ensure compliance with BMPs, to minimize wetland impacts and to ensure that there are no turbidity plumes or violations of state water quality standards (Exhibit A-1-9). Whenever possible, the Sponsor shall conduct construction and timbering activities in dry conditions such that there is no turbid discharge into open water systems. If activities must be conducted in or near open water systems, the Sponsor shall use turbidity and/or silt screens (Exhibit A-1-9 and Attachment A-9) in accordance with BMPs, and to monitor the open waters upstream (or out of influence of the activity) and downstream of the activity. If, at any time, turbidity at the downstream site is 29 NTU or greater than the upstream site, the Sponsor shall discontinue the activity and rectify the problem. It is the responsibility of the Sponsor to rectify any unauthorized wetland impacts or water quality problems found and to inform FDEP within 24 hours by phone, FAX or e-mail (with follow-up written memo) of the cause and remedies implemented.
AutoNDA by SimpleDocs

Related to Monitoring and Management During Construction

  • Access, Use, Monitoring and Inspection Site shall provide original or copies (as the case may be) of all Study Data to Quintiles and Sponsor for Sponsor’s use. Site shall afford Sponsor and Quintiles and their representatives and designees reasonable access to Site’s facilities and to Medical Records and Study Data so as to permit Sponsor and Quintiles and their representatives and designees to monitor the Study. 1.3.3.

  • Environmental constraints and management Describe or cross refer to environmental constraints applicable to the Contractor’s plan and his activities on the Affected Property and how they should be managed. Include here or cross refer to an Annexure to the Service Information. The Contractor shall comply with the environmental criteria and constraints stated in Annexure

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Network Maintenance and Management 36.1 The Parties will work cooperatively to implement this Agreement. The Parties will exchange appropriate information (for example, maintenance contact numbers, network information, information required to comply with law enforcement and other security agencies of the Government, escalation processes, etc.) to achieve this desired result.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Monitoring and Inspection The Interconnected Transmission Owner may monitor construction and installation of Interconnection Facilities that the Interconnection Customer is constructing. Upon reasonable notice, authorized personnel of the Interconnected Transmission Owner may inspect any or all of such Interconnection Facilities to assess their conformity with Applicable Standards.

  • Implementation and Management 1.1 Properly constituted Occupational Health and Safety (OH&S) Committees or, where there is no OH&S Committee, Site Safety Supervisors/Safety Officers in conjunction with worker representatives, are the appropriate bodies to implement and administer alcohol and drug policy/programs (* see below).

  • Monitoring and Management Information C10.1 The Contractor shall comply with the monitoring arrangements set out in the Monitoring Schedule including, but not limited to, providing such data and information as the Contractor may be required to produce under the Contract.

  • Construction Management Fee The Construction Management Fee for the Project shall be either a ☒Lump Sum or ☐Not-To-Exceed Fee of Fifty-One Thousand, Four Hundred Fifty-Six Dollars and Twenty-Three Cents ($51,456.23). NOTE: Allowances will be on a Not-To-Exceed basis. All unused funds will be returned to the School District at the time of construction closeout. Fee will be paid only on cost of work for these items. Exhibit C- Project Assignment Page 2 of 4

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.