NET PEN Sample Clauses

NET PEN. A system of aquaculture that confines fish or shellfish in a mesh enclosure.
AutoNDA by SimpleDocs
NET PEN. A system of aquaculture that confines fish or shellfish in a mesh enclosure. Deleted: New ocean uses are uses and developments that have not occurred or were not permitted within Washington’s Coastal waters prior to the completion of the Marine Spatial Plan for Washington’s Pacific Coast, as adopted June 2018. New uses, as defined by the MSP, are in-water uses, with potential adverse impacts to renewable resources or existing uses that have not been previously reviewed or authorized/permitted within the MSP study area. The MSP anticipates new ocean use proposals for activities such as renewable energy, dredged material disposal, mining, marine product harvesting, and offshore aquaculture operations.

Related to NET PEN

  • Minimum Salaries 12.1 The minimum base salary for all Bargaining Unit members shall be as follows: Rank Effective 9/1/2016 Professor $77,510 Assoc. Professor $62,520 Asst. Professor $51,325 Instructor $43,835 Senior Librarian $77,510 Assoc. Sr. Librarian $66,270 Assoc. Librarian $60,730 Asst. Librarian $51,325 Beg. Librarian $43,835 Faculty Members earning a base salary below the effective minima shall move to the new minima and receive any across-the-board and compression increase under Article 10 on his or her minima. Faculty Members who will receive regional campus increases under Article 10 of this Agreement shall receive those increases before any adjustment to meet the minimum salary required by this Article.

  • Payments from the Gross Settlement Amount The Administrator will make and deduct the following payments from the Gross Settlement Amount, in the amounts specified by the Court in the Final Approval:

  • Unbundled Sub-Loop Distribution Intrabuilding Network Cable (USLD-INC) is the distribution facility owned or controlled by BellSouth inside a building or between buildings on the same property that is not separated by a public street or road. USLD-INC includes the facility from the cross connect device in the building equipment room up to and including the point of demarcation at the End User’s premises.

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

  • Salary Scale The salary scale applicable to Employees shall be set out hereinafter in the Wage Schedule.

Time is Money Join Law Insider Premium to draft better contracts faster.