Net Unit Electrical Output Test Sample Clauses

Net Unit Electrical Output Test. The “Net Unit Electrical Output Test” shall be run to determine whether the Unit meets the Net Unit Electrical Output Guarantee [***]. The Net Unit Electrical Output Test for each Unit shall be conducted in material compliance with Power Test Code 46 (PTC-46) with the Net Unit Electrical Output [***] for the periods and duration described in this Section 11.5(d)(i). The Net Unit Electrical Output Test shall consist of at least four (4) test runs of a minimum of two (2) hours in duration per test run. Upon evaluation of the data, if three (3) or more of the test runs are found invalid, additional runs will be made after required remedial work, if any, is performed by the responsible Party. The measurement frequency shall be in compliance with PTC-46 throughout the Net Unit Electrical Output Test. Data collected within each test run will be averaged after each of the results is corrected to guarantee reference conditions in accordance with PTC-46, and then the Net Unit Electrical Outputs from the test runs that are found valid shall be averaged for purposes of determining the applicable Net Unit Electrical Output liquidated damages and bonuses.
AutoNDA by SimpleDocs

Related to Net Unit Electrical Output Test

  • Temperature The Committed Gas shall not have a temperature of less than forty degrees Fahrenheit (40°F) nor more than one hundred twenty degrees Fahrenheit (120°F).

  • Cost of Metering The Issuer shall not be obligated to pay any costs associated with the routine metering duties set forth in this Section 2, including the costs of installing, replacing and maintaining meters, nor shall the Issuer be entitled to any credit against the Servicing Fee for any cost savings realized by the Servicer as a result of new metering and/or billing technologies.

  • Year 2000 Compatibility Borrower shall take all action necessary to assure that Borrower's computer based systems are able to operate and effectively process data including dates on and after January 1, 2000. At the request of Bank, Borrower shall provide Bank assurance acceptable to Bank of Borrower's Year 2000 compatibility.

  • Service Level Service Provider will classify incidents at its own discretion. Such classifications shall be consistent with the priorities Service Provider set for itself as a recipient of services. Incidents classified using this methodology will be triaged as documented in Attachment A.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Fuel Upon redelivery of the Aircraft to Lessor, an adjustment will be made in respect of fuel on board on the Previous Delivery Date and the Expiry Date at the price then prevailing at the Redelivery Location.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Equipment Failures In the event of equipment failures beyond the Administrator's control, the Administrator shall take reasonable and prompt steps to minimize service interruptions but shall have no liability with respect thereto. The Administrator shall develop and maintain a plan for recovery from equipment failures which may include contractual arrangements with appropriate parties making reasonable provision for emergency use of electronic data processing equipment to the extent appropriate equipment is available.

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

Time is Money Join Law Insider Premium to draft better contracts faster.