New Steel Sample Clauses

New Steel. SSPC-SP-10, 1 Coat @ 2.0 MDFT; Inorganic Zinc, 2 Coats @ 6.0 MDFT, each surface tolerant epoxy, color matched.
AutoNDA by SimpleDocs
New Steel. Shot blast to clean original base, prime immediately with epoxy two pack red oxide zinc chromate primer and finish with 2 or 3 coats of epoxy two pack enamel depending on the anticipated service condition. Where shot blasting is not feasible, preparation of surface by use of pneumatic tools, and scraping and wire brushing, though not ideal, is recommended. Low standard cleaning affects durability of epoxy coats.

Related to New Steel

  • Increasing Seat Belt Use in the United States Pursuant to Executive Order 13043, 62 FR 19217 (Apr. 18, 1997), Recipient should encourage its contractors to adopt and enforce on-the- job seat belt policies and programs for their employees when operating company-owned, rented or personally owned vehicles.

  • Vendor Encouraging Members to bypass TIPS agreement Encouraging entities to purchase directly from the Vendor or through another agreement, when the Member has requested using the TIPS cooperative Agreement or price, and thereby bypassing the TIPS Agreement is a violation of the terms and conditions of this Agreement and will result in removal of the Vendor from the TIPS Program.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • CFR PART 200 Procurement of Recovered Materials A non-Federal entity that is a state agency or agency of a political subdivision of a state and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines. Does vendor certify that it is in compliance with the Solid Waste Disposal Act as described above? Yes

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

  • OMB 2 CFR Part 200 Except for agreements that are straight hourly rate or fee for services contracts not built on a submitted Budget, all components of payment billed to COUNTY will be calculated in accordance with the Office of Management and Budget (OMB) 2 CFR Part 200.

  • International or National Shopping Goods estimated to cost less than $30,000 equivalent per contract may be procured under contracts awarded on the basis of international or national shopping procedures in accordance with the provisions of paragraphs 3.5 and 3.6 of the Guidelines.

  • Objection Right for New Sub-processors Client may reasonably object to Data Processor’s use of a new Sub-processor for reasons related to the GDPR by notifying Data Processor promptly in writing within three (3) business days after receipt of Data Processor’s notice in accordance with the mechanism set out in Section 5.2 and such written objection shall include the reasons related to the GDPR for objecting to Data Processor’s use of such new Sub-processor. Failure to object to such new Sub-processor in writing within three (3) business days following Data Processor’s notice shall be deemed as acceptance of the new Sub-Processor. In the event Client reasonably objects to a new Sub-processor, as permitted in the preceding sentences, Data Processor will use reasonable efforts to make available to Client a change in the Services or recommend a commercially reasonable change to Client’s use of the Services to avoid Processing of Personal Data by the objected-to new Sub-processor without unreasonably burdening the Client. If Data Processor is unable to make available such change within a reasonable period of time, which shall not exceed thirty (30) days, Client may, as a sole remedy, terminate the applicable Agreement and this DPA with respect only to those Services which cannot be provided by Data Processor without the use of the objected- to new Sub-processor by providing written notice to Data Processor provided that all amounts due under the Agreement before the termination date with respect to the Processing at issue shall be duly paid to Data Processor. Until a decision is made regarding the new Sub-processor, Data Processor may temporarily suspend the Processing of the affected Personal Data. Client will have no further claims against Data Processor due to the termination of the Agreement (including, without limitation, requesting refunds) and/or the DPA in the situation described in this paragraph.

Time is Money Join Law Insider Premium to draft better contracts faster.