No Cost Escalation in the project Sample Clauses

No Cost Escalation in the project calendar months Five (05) percent of the accepted tender price in the case of tenders with cost of exceeding Rs.50.00 millions and as per general condition 26(a) for all tenders. One Year TENDER SUMMARY
AutoNDA by SimpleDocs
No Cost Escalation in the project calendar months Five (05) percent of the accepted tender price in the case of tenders with cost of exceeding Rs.50.00 million and as per general condition 26(a) for all tenders. One Year SUMMARY OF COST ESTABLISHMENT OF SUB-CAMPUS OF UNIVERSITY OF AGRICULTURE FAISALABAD, AT DEPALPUR - OKARA (HEC FUNDED) BILL OF QUANTITIES S/N DESCRIPTION AMOUNT (Rs.) 1  CAR PARKING 2  MISSING ITEMS 3  LEFT OVER WORK OF ACADEMIC BLOCK 4  ENTRANCE GATE (Civil Works) 5  ENTRANCE GATE (Public Health Works) 6  ENTRANCE GATE (Electrical Works) 7  WAITING AREA (20'X25') 8  FOOTPATH 4' WIDE 10  TUBEWELL CHAMBER / OPERATOR ROOM 11  TUBEWELL CHAMBER ELECTRICAL WORKS 12  MONUMENT 13  WASTE COLLECTION PIT (6-Nos.)(AnsX6) 14  RAW WATER STABLING POND 15  GREEN HOUSE TOTAL : ADD 5 % PRA : GRAND TOTAL : IN MILLION : ESTABLISHMENT OF SUB-CAMPUS OF UNIVERSITY OF AGRICULTURE FAISALABAD, AT DEPALPUR - OKARA (HEC FUNDED) (D.N.I.T) CONSTRUCTION OF CAR PARKING Item No. REF. Nos CH/ITEM Description of Items Unit Qty Rate (Rs.) Rate Quoted by The Contractor Amount (Rs.) MRS, 1st BI-ANNUAL-2021 (1st JANUARY-2021 to 30th JUNE -2021) DISTRICT OKARA SCHEDULE ITEMS-A Earth Work 1 CH:3 item 47(a) P-33 Jungle clearance and removing within 100 ft. (30 m).a) light 1000 Sft 27,300.00 177.65 2 CH:3 item 21 (b) P-30 Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) b) in ordinary soil. 1000 Cft 748.13 7,492.30 Filling, watering and ramming earth under floors:- 3.1 CH:3 item 15 (i) P-29 i) with surplus earth from foundation, etc. 1000 Cft 523.69 3,583.55 3.2 CH:3 item 15 (ii) + 17 (a, b & c) P-29 ii) with new earth excavated from outside,lead upto 5 mile (8 Km). (as per actual borrow pit lead) 1000 Cft 40,400.13 14,476.80 4 CH:3 item 25 (i) P-30 Compaction of earthwork with power road roller, including ploughing, mixing, moistening earth to optimum moisture) content in layers, etc. complete: i) 95% to 100% maximum modified AASHO dry density. 1000 Cft 42,970.01 788.25 Plain and Reinforcement Concrete 5 CH:6 item 3 (b)(ii) P41 Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (b) Ratio 1: 4: 8 100 Cft 374.06 14,106.35 Brick Work ESTABLISHMENT OF SUB-CAMPUS OF UNIVERSITY OF AGRICULTURE FAISALABAD, AT DEPALPUR - OKARA (HEC FUNDED) (D.N.I.T)
No Cost Escalation in the project calendar months Five (05) percent of the accepted tender price in the case of tenders with cost of exceeding Rs.50.00 millions and as per general condition 26(a) for all tenders. One Year Sr# Description of Items. Unit Quantity Tentative Rate of UAF Rate quoted by the contractor Amount 01 Providing and Fixing Vinyl Flooring 2mm thick, One Meter wide, pasted with adhesive and anti-microbial additives, all joints welded with heat process and curve turning on edges and wherever required complete in all respects Sft 1300 866/- NOTE: All quoted rates will be including of 1- Material Cost, Transportation, Installation, Labor and all other allied charges 2- Income Tax, Sales Tax and all other Taxes levied by government. Sr# Description of Items. Unit Quantity Tentative Rate of UAF Rate quoted by the contractor Amount 02 Providing and Fixing Glass Paneling with 8mm Glass, make 'Xxxxx, Xxxxx, Fateh' or equivalent with special base of 304 Stainless Steel Frame, champhered at ends/edges special Gasket at Bottom and top holdfast fixed on wall and ceiling of RCC roof in all aspects as per cladding drawing complete in all respects as per design. Anchoring and Air-Tighting will be ensured. Sft 1030 1460/- NOTE: All quoted rates will be including of 1- Material Cost, Transportation, Installation, Labor and all other allied charges 2- Income Tax, Sales Tax and all other Taxes levied by government. Sr# Description of Items. Unit Quantity Tentative Rate of UAF Rate quoted by the contractor Amount 03 Providing and Fixing Stainless Steel Door with 304 Grade, 1.5mm Thick sheet. Door Leaf 38mm Thick (both sides), 304 Grade Steel complete made through Roll Framing Machine with 5 Special Bearing Steel, Door Closers, Locking Arrangements, Bolts, Screws, Leaves Polystyrene 25Kg/m3. See through Double Glass (18"x24") Sft 270 5100/- NOTE: All quoted rates will be including of 1- Material Cost, Transportation, Installation, Labor and all other allied charges 2- Income Tax, Sales Tax and all other Taxes levied by government. Sr# Description of Items. Unit Quantity Tentative Rate of UAF Rate quoted by the contractor Amount 04 Providing and Fixing of PVC Sheet 2mm Thick, 9'x4' with anti-microbial additives, imported. Cladding and Curving at edges wherever required. Filling of all joints with appropriate material. Complete in all respects. Sft 1150 3264/- NOTE: All quoted rates will be including of 1- Material Cost, Transportation, Installation, Labor and all other allied charges 2- Income...
No Cost Escalation in the project calendar months Five (05) percent of the accepted tender price in the case of tenders with cost of exceeding Rs.50.00 millions and as per general condition 26(a) for all tenders. One Year SUMMARY OF COST ESTABLISHMENT OF SUB-CAMPUS OF UNIVERSITY OF AGRICULTURE FAISALABAD, AT DEPALPUR - OKARA (HEC FUNDED) (Construction of Administration and Academic Block) S/N DESCRIPTION AMOUNT (Rs) 1 Administrative Block 2 Academic Block 3 Total 4 Add 5% PRA 5 Grand Total : IN MILLION ESTABLISHMENT OF SUB-CAMPUS OF UNIVERSITY OF AGRICULTURE FAISALABAD, AT DEPALPUR - OKARA (HEC FUNDED) ADMINISTRATION BLOCK BILL OF QUANTITIES CIVIL WORKS Item No. REF. Nos CH/ITEM Description of Items Unit Qty Rate (Rs.) Rate Quoted by The Contractor Amount (Rs.) MRS, 2nd BI-ANNUAL-2018 (1st July-2018 to 31st December-2018) DISTRICT OKARA 1-SCHEDULE ITEMS-A Earth Work 1 CH:3/47(a) Jungle clearance and removing within 100 ft. (30 m).a) light 1000 Sft 5,799.00 152.35 2 CH:3/21(b) Excavation in foundation of building and other sructures, including debelling,dressing,refilling around structure with excavated eart,watering and ramming lead upto one chain 100ft and lift upto 5 xx.xx ordinary soil. 1000 Cft 6,332.78 6,434.20 3 CH:3/15(i)(ii) Filling, watering and ramming earth under floors:
No Cost Escalation in the project calendar months Five (05) percent of the accepted tender price in the case of tenders with cost of exceeding Rs.50.00 million and as per general condition 26(a) for all tenders. One Year SUMMARY OF COST STRENGTHENING OF AMRI RESEARCH AND DEVELOPMENT CAPABILITIES IN COLLABORATION WITH UAF FOR FABRICATION OF COST EFFECTIVE AND EFFICIENT SMALL AGRICULTURE, IMPLEMENTS FOR SMALL FARMER. S/N DESCRIPTION AMOUNT (Rs) 1 (Civil Work) 2 (Repair and Renovation Lab)

Related to No Cost Escalation in the project

  • Operating Costs The Assuming Institution agrees, during its period of use of any Leased Data Management Equipment, to pay to the Receiver or to appropriate third parties at the direction of the Receiver all operating costs with respect thereto and to comply with all relevant terms of any existing Leased Data Management Equipment leases entered into by the Failed Bank, including without limitation the timely payment of all rent, taxes, fees, charges, maintenance, utilities, insurance and assessments.

  • Operating Expenses Unless modified in accordance with Exhibit D, Landlord maintenance addendum, attached hereto, it is the intention of the parties and they hereby agree that this shall be a triple net Lease, and the Landlord shall have no obligation to provide any services, perform any acts or pay any expenses, charges, obligations or costs of any kind whatsoever with respect to the Premises, and Tenant hereby agrees to pay one hundred percent (100%) of any and all Operating Expenses as hereafter defined for the entire term of the Lease and any extensions thereof in accordance with specific provisions hereinafter set forth. The term Operating expenses shall include all costs to Landlord of operating and maintaining the Building and related parking areas, and shall include, without limitation, real estate and personal property taxes and assessments, management fee, heating, electricity, water, waste disposal, sewage, operating materials and supplies, service agreements and charges, lawn care, snow removal, restriping, repairs, repaving, cleaning and custodial, security, insurance, the cost of contesting the validity or applicability of any governmental acts which may affect operating expenses, and all other direct operating costs of operating and maintaining the Building and related parking areas, unless expressly excluded from operating expenses. Notwithstanding the foregoing, operating costs (and Tenant's obligations in relation thereto) shall not include (i) any expense chargeable to a capital account or capital improvement, ground leases; principal or interest payments on any mortgage or deed of trust on the premises; (ii) any amount for which Landlord is reimbursed through insurance, by third persons, or directly by other tenants of the premises, (iii) repair costs occasioned by fire, windstorm or other casualty, (iv) any construction, repair or maintenance expenses or obligations that are the sole responsibility of Landlord (not to be reimbursed by Tenant), (v) leasing commissions and other expenses incurred in connection with leasing any other area located on the premises to any other party, (vi) any expense representing an amount paid to an affiliate or subsidiary of Landlord which is in excess of the amount which would be paid in the absence of such relationship, and (vii) costs of items and services for which Tenant reimburses Landlord or pays third persons directly.

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.