Operation of Gauging Station Sample Clauses

Operation of Gauging Station. At the Date of this Agreement, Canada operates the Split Lake Gauging Station in accordance with the Canada - Manitoba Water Quantity Surveys Agreement dated April 1, 1975. The Parties agree that, if Canada ceases such operation, Hydro shall forthwith assume such operation. If it becomes necessary to replace or re-locate the Split Lake Gauging Station, it will be replaced by the party responsible for replacement under the applicable provisions, if any, of the Canada - Manitoba Water Quantity Surveys Agreement or any successor agreement, or in the absence of such provisions, by Hydro and the location shall be on Split Lake, in reasonable proximity to the existing location and, subject to improvements in the state of the art, the design shall be the same as the existing one and it shall be tied to a benchmark which has been established to a third order accuracy or better, in accordance with a recognized Canadian standard on vertical control levelling. The data recorded by the Split Lake Gauging Station shall be tied to the Controlling Bench Marks or, where required, adjusted by Hydro to ASL Local Datum. Prior to construction of any replacement gauge or relocation of the Split Lake Gauging Station, the design and location shall be approved by War Lake and Hydro.
AutoNDA by SimpleDocs
Operation of Gauging Station. At the Date of this Agreement, Canada operates the Split Lake Gauge in accordance with the Canada - Manitoba Water Quantity Surveys Agreement dated April 1, 1975. Canada will give not less than one hundred eighty (180) days notice to the other Parties if it intends to cease operating the Split Lake Gauge. The Parties agree that if Canada ceases such operation Hydro shall forthwith assume such duties. If it becomes necessary to replace or re-locate the Split Lake Gauge, it will be replaced by the party responsible for replacement under the applicable provisions, if any, of the Canada - Manitoba Water Quantity Surveys Agreement or any successor agreement, or in the absence of such provisions, by Hydro and the location shall be on Split Lake, in reasonable proximity to the existing location and, subject to improvements in the state of the art, the design shall be the same as the existing one and it shall be tied to a benchmark which has been established to a third order accuracy or better, in accordance with a recognized Canadian standard on vertical control leveling. The data recorded by the Split Lake Gauge shall be tied to the Controlling Bench Marks or, where required, adjusted by Hydro to ASL Local Datum. Prior to construction of any replacement gauge or relocation of the Split Lake Gauge, the design and location shall be approved by York Factory, Hydro, and at its option Canada, as represented by the Inland Waters Directorate of Environment Canada or its successor, but Canada shall be exposed to no liability under this Agreement for a failure to exercise such option.

Related to Operation of Gauging Station

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

  • Air Transport Services 1. For the purposes of this Article:

  • Demarcation Point 98.1 CenturyLink will designate the point of demarcation between CenturyLink’s equipment and CLEC’s collocated equipment, which point of demarcation shall be in or adjacent to its Collocation Space unless otherwise mutually agreed to by the Parties. At CLEC's request, CenturyLink will identify the location(s) of other possible demarcation points available to CLEC, and CLEC will designate from these location(s) the point(s) of demarcation between its collocated equipment and CenturyLink's equipment. CenturyLink will use its best efforts to identify the closest demarcation point to CLEC's equipment that is available.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.