Overburden Sample Clauses

Overburden. Owner shall be responsible for the costs associated with the removal and replacement, as well as any damage caused by the removal and replacement, of any overburden, superstrata or overlays, either permanent or temporary, which include but are not limited to: structures or assemblies added after installation, fixtures or utilities on or through the System or Material, support platforms or bases for Photovoltaic (PV) Arrays (aka – Solar Panels), Garden Roofs, Decks, Patios or any other obstacles that impede access, clear observation, investigation or repairs to the System or Materials, excluding ballast or pavers accepted by Firestone or overburden specifically included in subsequent pages of this Limited Warranty.
AutoNDA by SimpleDocs
Overburden. Owner shall be responsible for the costs associated with the removal and replacement, as well as any damage caused by the removal and replacement, of any overburden, superstrata or overlays, either permanent or temporary, which include but are not limited to: structures or assemblies added after installation, fixtures or utilities on or through the System or Material, support platforms or bases for Photovoltaic (PV) Arrays (aka - Solar Panels), Garden Roofs, Decks, Patios or any other obstacles that impede access, clear observation, investigation, and repair of the System or Materials, excluding ballast or pavers accepted by Holcim or overburden specifically included in subsequent pages of this Limited Warranty.
Overburden. Owner shall be responsible for the costs associated with the removal and replacement, as well as any damage caused by the removal and replacement, of any overburden, superstrata or overlays, either permanent or temporary, which include but are not limited to: structures or assemblies added after installation, fixtures or utilities on or through the System or Material, support platforms or bases for Photovoltaic (PV) Arrays (aka – Solar Panels), Garden Roofs, Decks, Patios or any other obstacles that impede access, clear observation, investigation or repairs to the System or Material, excluding ballast or pavers accepted by GenFlex or overburden specifically included in subsequent pages of this Limited Warranty.
Overburden. (a) Wherever overburden is encountered on a setup, it is agreed that the Contractor’s charge for penetrating such overburden per lineal foot shall be for the Client’s account at the rates listed below. 0 – 50 feet $35.00 per foot $38.00 per foot 50 feet & beyond The greater of footage or Hourly Rate.
Overburden. Shall strip from the deposit any overburden and store in pile adjacent thereto. EXTRACTION: Shall excavate the site as necessary to obtain the material. CLEANUP: Shall spread overburden material uniformly over the bottom of the material source, seed, and fertilize.
Overburden. Owner shall be responsible for the costs associated with the removal and replacement, as well as any damage caused by the removal and replacement, of any overburden, superstrata or overlays, either permanent or temporary, which include but are not limited to: structures or assemblies added after installation, fixtures or utilities on or through the System or Material, support platforms or bases for Photovoltaic (PV) Arrays (aka – Solar Panels), Garden Roofs, Decks, Patios or any other obstacles that impede access, clear observation, investigation or repairs to the System or Materials, excluding ballast or pavers accepted by Uneeke Inc. or overburden specifically included in subsequent pages of this Limited Warranty.
Overburden. THAT Pacific agrees to pay for casing or stand pipe for any Hole(s), on a field cost basis including the following schedule and/or rates: Holes From To Price/Foot 1-7 or more 0 feet to 30 feet $35.00 US funds per foot MOBILIZATION – DEMOBILIZATION THAT NICOLA agrees to move its equipment, personnel, vehicles, and supplies, from their current place of rest to the Mazama property and from the Mazama property back again, on a field cost basis. MOVING BETWEEN HOLES – SETTING UP – TEARING DOWN THAT Pacific agrees that hours employed tearing down the drill and support equipment, moving the drill and support equipment between holes, setting up the drill and support equipment and all related activities, including the drilling of any needed anchors, will be charged on a field cost basis.
AutoNDA by SimpleDocs
Overburden 

Related to Overburden

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Wastewater investments in the construction, material enhancement, or renewal of infrastructure that supports wastewater and storm water collection, treatment, and management systems. Note: Investments in health infrastructure (e.g., hospitals, long-term care facilities, convalescent centres, and senior centres) are not eligible. Eligible Expenditures will be limited to the following: 1. Infrastructure investments – expenditures associated with acquiring, planning, designing, constructing, or renovating a tangible capital asset and any related debt financing charges specifically identified with that asset. 2. Capacity-building costs – for projects eligible under the capacity-building category only, expenditures associated with the development and implementation of: • Capital investment plans, integrated community sustainability plans, integrated regional plans, housing needs assessments, or asset management plans; • Studies, strategies, systems, software, third-party assessments, plans, or training related to asset management; • Studies, strategies, systems, or plans related to housing or land use; • Studies, strategies, or plans related to the long-term management of infrastructure; and • Other initiatives that strengthen the Recipient’s ability to improve local and regional planning. 3. Joint communications and signage costs – expenditures directly associated with joint federal communication activities and with federal project signage.

  • Alpine Areas As of 1 October 2020 the Employer shall pay an Alpine disability allowance of $3.85 worked on Projects in alpine areas. These allowances will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors or ventilating ducts or shafts, of the Building. All trash and refuse shall be placed in receptacles provided by Landlord for the Building or by Tenant for the Premises.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!