Parameters Monitoring Sample Clauses

Parameters Monitoring. In order to maintain the accuracy of the model, Facility Owner shall periodically submit to CEB the operating parameters to determine if there is any decay which should be modelled. Facility Owner shall carry out routine and prototype response tests on voltage and power-frequency controls for the Facility at which major refurbishment or upgrades have taken place. Routine review shall be required at least once every 5 (five) years.
AutoNDA by SimpleDocs

Related to Parameters Monitoring

  • System Monitoring to ensure safe and continuous operation, the Customer must monitor key services and resource use as recommended by Deswik, and provide Deswik with details of monitoring and any relevant alerts as needed. Services to be monitors include, without limitation, disk space, CPU usage, memory usage, database connectivity, and network utilization.

  • Service Monitoring Customer gives express consent for Vodafone to monitor Customer’s use of the Service (and disclose and otherwise use the information obtained) only to: (a) the extent allowed by Applicable Law; (b) comply with Applicable Law; (c) protect the Network from misuse; (d) protect the integrity of the public internet and/or Vodafone’s systems and Networks; (e) the extent necessary to determine if Customer has breached any conditions or restrictions on use of the Service; (f) provide the Service; and/or (g) take other actions agreed or requested by Customer.

  • Program Monitoring The Contractor will make all records and documents required under this Agreement as outlined here, in OEC Policies and NHECC Policies available to the SRO or its designee, the SR Fiscal Officer or their designee and the OEC. Scheduled monitoring visits will take place twice a year. The SRO and OEC reserve the right to make unannounced visits.

  • Compliance Monitoring Grantee must be subject to compliance monitoring during the period of performance in which funds are Expended and up to three years following the closeout of all funds. In order to assure that the program can be adequately monitored, the following is required of Grantee:

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • Quality Monitoring 4.2.1. To prepare a Quality Assurance (QA) Plan

  • Contract Monitoring The criminal background checks required by this rule shall be national in scope, and must be conducted at least once every three (3) years. Contractor shall make the criminal background checks required by Paragraph IV.G.1 available for inspection and copying by DRS personnel upon request of DRS.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Supply Chain Monitoring A copy of the supply chain monitoring process, which should include details of the process for monitoring the financial viability of the supply chain (including timing), together with any known risks to supply chain stability and material changes to the supply chain. This should include extracts from Board level meetings, risk registers etc where any of the above items have been discussed. Annex 1 1 Information from Contractors who are not required to submit form AR01 to Companies House

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

Time is Money Join Law Insider Premium to draft better contracts faster.