Pavement Performance Testing and Monitoring Sample Clauses

Pavement Performance Testing and Monitoring. The Consultant will be required to provide services to support the pavement performance monitoring and assessment program including Department’s initiatives such as Pavement Acceptance for smoothness and Highway Performance Monitoring System (HPMS) surveys. This involves initial and long-term evaluation of projects that incorporate new and/or improved materials, designs, and construction practices, which may result in longer lasting pavements and cost-effective designs. Testing may be required on experimental projects and during the initial stages of new project construction, and at different time intervals thereafter for long-term performance monitoring. The services may involve activities that include deflection testing, ride evaluation, and distress surveys, as well as any other testing deemed necessary for pavement performance assessment purposes including forensic investigations. The Consultant will provide the necessary resources to perform the testing and data collection activities, and to operate the test equipment and tow vehicles which will be provided by the Consultant and/or by the Department, whichever option is determined to be more feasible and economical. The Consultant will also be responsible for the coordination of the Maintenance of Traffic (MOT) through the appropriate District representatives giving them at least two (2) weeks notice to arrange for MOT. In-house services may include but are not limited to data reduction, evaluation and processing, computer programming for data mining tools, database uploading and query, and Internet file transferring. The testing will be conducted in accordance with FDOT guidelines and procedures.
AutoNDA by SimpleDocs

Related to Pavement Performance Testing and Monitoring

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopts or introduces for the Employer, management and municipal staff of the Employer.

  • Performance Monitoring A. Performance Monitoring of Subrecipient by County, State of California and/or HUD shall consist of requested and/or required written reporting, as well as onsite monitoring by County, State of California or HUD representatives.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • CONTRACTOR PERFORMANCE AUDIT The Contractor shall allow the Authorized User to assess Contractor’s performance by providing any materials requested in the Authorized User Agreement (e.g., page load times, response times, uptime, and fail over time). The Authorized User may perform this Contractor performance audit with a third party at its discretion, at the Authorized User’s expense. The Contractor shall perform an independent audit of its Data Centers, at least annually, at Contractor expense. The Contractor will provide a data owner facing audit report upon request by the Authorized User. The Contractor shall identify any confidential, trade secret, or proprietary information in accordance with Appendix B, Section 9(a), Confidential/Trade Secret Materials.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • The Performance Improvement Process (a) The Performance Improvement Process will focus on the risks of non- performance and problem-solving. It may include one or more of the following actions:

  • Contractor Performance Evaluations The Contract Administrator will evaluate Contractor’s performance as often as the Contract Administrator deems necessary throughout the term of the contract. This evaluation will be based on criteria including the quality of goods or services, the timeliness of performance, and adherence to applicable laws, including prevailing wage and living wage. City will provide Contractors who receive an unsatisfactory rating with a copy of the evaluation and an opportunity to respond. City may consider final evaluations, including Contractor’s response, in evaluating future proposals and bids for contract award.