Payment of the Project Fees. The Project Fees referred to in Section 3.1.1 above, together with interest at a […***…] percent ([...***...]%) annual interest rate on any unpaid Project Fees accruing from the earlier of (i) the date of completion of the clinical summary report for the Phase 1 clinical trials of the Product as planned according to Appendix 7 unless delayed as described in Section 2.8.3 or (ii) the date that is[...***...] after the Effective Date (each of the alternatives above, the “Due Date”) until paid in full (the Project Fees together with any such interest, referred to as the “Total Amount”), shall become duly payable in accordance with the following schedule: a. In case [...***...], then, beginning from the later of [...***...] in [...***...] installments of [...***...] of the [...***...] (defined below) that [...***...]; provided, however, that in no event will [...***...] of the annual Licensing Revenue [...***...]; provided that, for the avoidance of doubt, [...***...] shall be excluded from [...***...]. b. In case […***…] in one or more lump sum payments within [...***...] from the Due Date. c. [...***...] either [...***...], then [...***...
AutoNDA by SimpleDocs
Payment of the Project Fees. The Project Fees referred to in Section 3.1.1 above, together with interest at a […***…] percent ([...***...]%) annual interest rate on any unpaid Project Fees accruing from the earlier of (i) the date of completion of the clinical summary report for the Phase 1 clinical trials of the Product as planned according to Appendix 7 unless delayed as described in Section 2.8.3 or (ii) the date that is five (5) calendar years after the Effective Date (each of the alternatives above, the “Due Date”) until paid in full (the Project Fees together with any such interest, referred to as the “Total Amount”), shall become duly payable in accordance with the following schedule: a. In case XENCOR has entered into an agreement with at least one Business Partner, then, beginning from the later of (i) the effective date of such agreement or (ii) the Due Date, XENCOR will pay BII the Total Amount in [...***...] installments of [...***...] of the [...***...] (defined below) that [...***...]; provided, however, that in no event will [...***...] of the annual Licensing Revenue [...***...]; provided that, for the avoidance of doubt, [...***...] shall be excluded from [...***...]. b. In case XENCOR decides to proceed with the further development of the Product without a Business Partner, XENCOR will pay BII the Total Amount in one or more lump sum payments within five (5) calendar years from the Due Date. c. As long as XENCOR, notwithstanding its commercially reasonable efforts after the completion of the Phase 1 clinical trial either (i) is not able to further develop the Product for technical and/or scientific reasons or (ii) does not decide to proceed with the further development of the Product without a Business Partner and does not enter into an agreement with a Business Partner within two (2) calendar years from the Due Date, then XENCOR shall have no obligation to pay BII any or all of the Total Amount. For the avoidance of doubt, such obligations will become due as described in this Section 3.1.2, at any time XENCOR enters into an agreement with at least one Business Partner or further develops the Product within ten (10) calendar years following the Effective Date, as provided in Section 10.3.

Related to Payment of the Project Fees

  • Disbursements to Contractors to Pay Costs of the Project The Recipient shall require that as work on the Project and as specified in its contract is performed a Contractor shall promptly submit a detailed project specific invoice to the Project Manager. Within three (3) Business Days following receipt of such invoice from a Contractor, the Project Manager shall review the invoice and, if found to be accurate, shall so certify in writing, forwarding such certification together with a copy of the invoice to the Chief Fiscal Officer. Within five (5) Business Days following receipt of such invoice and certification from the Project Manager, the Chief Fiscal Officer shall conduct such reviews as he considers appropriate and, if he approves such invoice, shall submit to the Director a Disbursement Request together with the information and certifications required by this Section 6(b). The dollar amount set forth in the Disbursement Request shall be calculated based on the Participation Percentage as set forth originally in Appendix D of this Agreement or as may be adjusted from time to time to account for changed conditions in the project financing scheme. Within five (5) Business Days following receipt of the Disbursement Request and all required information and certifications, the Director shall, if such items are deemed by the Director to be accurate and completed, initiate a voucher in accordance with applicable State requirements for the payment of the amount set forth in the Disbursement Request. Upon receipt of a warrant from the Auditor of State drawn in connection with a voucher initiated in accordance with the terms of the preceding sentence, the Director shall forward it by regular first class United States mail or electronic funds transfer, to the contractor or other authorized recipient designated in the Disbursement Request. Prior to any disbursement from the Fund, the following documents shall be submitted to the Director by the Recipient: (i) If the request is for disbursement to a Contractor, an invoice submitted to the Recipient by the Contractor which invoice requests payment of such sums in connection with its performance of the Project; (ii) If the request is for disbursement to the Recipient pursuant to Paragraph (A)(4)(b) of Rule 164-1-22 of the Administrative Code, a xxxx of sale, paid invoice or other evidence satisfactory to the Director that payment of such sums has been made by the Recipient in connection with the portion of the Project for which payment is requested; (iii) The Project Manager's certification pursuant to Section 6(b) of this Agreement; (iv) The Disbursement Request Form and Certification in the form set forth as Appendix E of this Agreement properly executed by the Chief Fiscal Officer and the Chief Executive Officer; and (v) Such other certificates, documents and other information as the Director may reasonably require. If the Director finds that the documents are in compliance with the requirements of this Agreement, the Director is authorized and directed to cause the disbursement of moneys from the Fund for payment of the identified Project costs. A copy of all such documents submitted to the Director shall be retained by the Director. The Recipient represents that the Project was initially constructed, installed or acquired by the Recipient no earlier than the execution date of this Agreement.

  • Development of the Project 4.1 TSP's obligations in development of the Project: a. for procuring and maintaining in full force and effect all Consents, Clearances and Permits, required in accordance with Law for development of the Project; b. for financing, constructing, owning and commissioning each of the Element of the Project for the scope of work set out in Schedule 1 of this Agreement in accordance with: i. the Electricity Act and the Rules made thereof; ii. the Grid Code; iii. the CEA Regulations applicable, and as amended from time to time, for Transmission Lines and sub-stations: • the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007; • Central Electricity Authority (Technical Standards for construction of Electrical Plants and Electric Lines) Regulation, 2010; • Central Electricity Authority (Grid Standard) Regulations, 2010; • Central Electricity Authority (Safety requirements for construction, operation and maintenance of Electrical Plants and Electrical Lines) Regulation, 2011; • Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulation, 2010; • Central Electricity Authority (Technical Standards for Communication System in Power System Operation) Regulations, 2020. iv. Safety/ security Guidelines laid down by the Government; v. Prudent Utility Practices, relevant Indian Standards and the Law; not later than the Scheduled COD as per Schedule 2 of this Agreement; c. for entering into a Connection Agreement with the concerned parties in accordance with the Grid Code. d. for owning the Project throughout the term of this Agreement free and clear of any encumbrances except those expressly permitted under Article 15 of this Agreement; e. to co-ordinate and liaise with concerned agencies and provide on a timely basis relevant information with regard to the specifications of the Project that may be required for interconnecting the Project with the Interconnection Facilities; f. for providing all assistance to the Arbitrators as they may require for the performance of their duties and responsibilities; g. to provide to the Nodal Agency and CEA, on a monthly basis, progress reports with regard to the Project and its execution (in accordance with prescribed form) to enable the CEA to monitor and co-ordinate the development of the Project matching with the Interconnection Facilities; h. to comply with Ministry of Power order no. 25-11/6/2018 – PG dated 02.07.2020 as well as other Guidelines issued by Govt. of India pertaining to this; i. to procure the products associated with the Transmission System as per provisions of Public Procurement (Preference to Make in India) orders issued by Ministry of Power vide orders No. 11/5/2018 - Coord. dated 28.07.2020 for transmission sector, as amended from time to time read with Department for Promotion of Industry and Internal Trade (DPIIT) orders in this regard (Procuring Entity as defined in above orders shall deemed to have included Selected Bidder and/ or TSP). Also, to comply with Department of Expenditure, Ministry of Finance vide Order (Public Procurement No 1) bearing File No. 6/18/2019- PPD dated 23.07.2020, Order (Public Procurement No 2) bearing File No. 6/18/2019-PPD dated 23.07.2020 and Order (Public Procurement No. 3) bearing File No. 6/18/2019-PPD, dated 24.07.2020, as amended from time to time, regarding public procurement from a bidder of a country, which shares land border with India; j. to submit to Nodal Agency information in the prescribed format [To be devised by Nodal Agency] for ensuring compliance to Article 4.1 i) above. k. to comply with all its obligations undertaken in this Agreement. 4.2 Roles of the Nodal Agency in implementation of the Project: 4.2.1 Subject to the terms and conditions of this Agreement, the Nodal Agency shall be the holder and administrator of this Agreement and shall inter alia: a. appoint an Independent Engineer within 90 days of the Effective Date b. provide letters of recommendation to the concerned Indian Governmental Instrumentality, as may be requested by the TSP from time to time, for obtaining the Consents, Clearances and Permits required for the Project; c. coordinate among TSP and upstream/downstream entities in respect of Interconnection Facilities; and d. monitor the implementation of the Agreement and take appropriate action for breach thereof including revocation of guarantees, cancellation of Agreement, blacklisting etc e. provide all assistance to the Arbitrators as required for the performance of their duties and responsibilities; and f. perform any other responsibility (ies) as specified in this Agreement.

  • Project Costs Simultaneously with the execution of this Agreement, the Company shall disclose to the Department all of the Project Costs which the Company seeks to include for purposes of determining the limitation of the amount of the Credit pursuant to Section 5-30 of the Act and provide to the Department a Schedule of Project Costs in the form as attached hereto as Exhibit C.

  • Development Fees 1. To assist the City in meeting expenses resulting from ongoing development, Owner shall pay development fees as follows, as set forth in the Tables below. These amounts are those in effect upon the execution of this Agreement and are subject to the annual Adjustment Factor, as defined herein, implemented each subsequent year on July 1, beginning July 1, 2023. Table A DEVELOPMENT FEES AMOUNT DEVELOPMENT FEES AMOUNT DEVELOPMENT FEES AMOUNT 2. All Table A and Table B Development Fees shall be collected at the time of obtaining a building permit and placed in separate interest bearing accounts established for each of the designated categories (i.e. Police, Fire, Recreation, Public Works and Community Facilities). The City may expend the development funds for any purposes designed to provide 3. Notwithstanding any provision to the contrary contained within this Agreement, the Development Fees are being paid in lieu of any other impact fees, development fees or any other similar fees presently existing or adopted by the City at any time hereafter during the term of this Agreement; provided, however, the Owner and/or Developer(s) shall be subject to the payment of any and all present or future permitting fees enacted by the City that are of City-wide application and that relate to processing applications, development permits, building permits, review of plans, or inspections (but no other capital improvement related impact, development or other extractions). 4. Except as set forth in this Agreement, nothing herein shall be construed as relieving the Owner, Developer, a Secondary Developer, a Builder, or their successors, and assigns, from payment of any such fees or charges as may be assessed by entities other than the City. It is the intent of the parties that the fees and obligations contemplated by this Agreement are the only obligations which will be imposed upon the Property however, the provisions of this paragraph shall not preclude the City or another governmental authority from imposing a fee for services or improvements contemplated under this Agreement which are imposed on a consistent basis throughout the area regulated by such governmental authority imposing such obligations. The City or other governing body shall not be precluded by this Agreement from charging fees for delivery of services to citizens or residents (i.e., an EMS response fee or the like), nor from charging fees statutorily authorized in the future (i.e., a real estate transfer fee or the like) which are not collected as a prerequisite to approval of a plat, plan, or construction. The City shall, at Owner/Developer’s request, together with Owner/Developer, challenge any developer fee, impact fee or other obligation imposed by other governmental authorities to the extent that such fees or obligations are not specifically permitted to be imposed pursuant to the terms of this Agreement. 5. The parties hereto recognize that Jasper County may, now or in the future, impose certain development impact fees upon the Property. The intent hereof is that the Owner shall not be charged in both jurisdictions for the same impact fee (development fee) categories, however, should a dispute arise as to whether Owner/Developer shall pay fees to the County or to the City, the Owner/Developer shall be responsible for settling such dispute with each party. The City shall not offset any development fee contained herein against such fees payable to Jasper County. The same principle shall apply regarding all applicable Development Fee categories hereunder, and any such future agreement shall not be deemed a material amendment or breach hereof. If the City becomes involved in litigation or challenge at the request of the Owner/Developer and/or the City becomes a party to ligitation or challenge at the request of the Owner/Developer, the Owner/Developer shall reimburse the City for all costs associated with such challenge and may be required to make a deposit of such in advance with the City. 6. Any Development Fees paid and/or credits for Development Fees with respect to property conveyed, services performed and/or money paid as provided in this Agreement may be assigned by the Owner and/or Developer(s) owning such credits and all such credits shall remain valid until utilized. The City shall recognize all such written assignments of such rights as long as the City has been given an opportunity to review such assignments for accuracy prior to such assignment and shall credit same against any Development Fees which are owed pursuant to this Agreement. 7. For those units that may qualify for Attainable Housing Reductions, the Owner, or authorized agent, shall pay the Table A City Development Fees upon the issuance of a building permit. At the time a Certificate of Occupancy is granted, the Owner, or authorized agent, will provide to the City a copy of the sales contract. If the base sales price meets the criteria for Attainable Housing as defined herein, then the Owner, or authorized agent, is eligible for reduced Development Fees Upon submittal of a closing statement showing a qualifying base sales price, the City shall calculate the credit amount based upon the reduced amounts identified in Table A- 1. The reduced amount from the year shown on the closing statement shall apply. Owner, or authorized agent, may receive a refund for fees paid in excess or held as a credit for payment for future units. If Owner, or authorized agent, does not submit a request for refund within six (6) months of the closing, that Owner, or authorized agent, will no longer be eligible for the reduced Development Fees. Table B and Table C shall not qualify for Attainable Housing Reductions. 8. The Development Fees set forth in the Fee Chart are based upon 2022 figures. The Development Fee amounts shall be increased annually according to the Adjustment Factor. 9. The City, County, or other governmental entity, may establish, solely or in conjunction with each other, a Tax Increment, fee in lieu of tax (FILOT), Multi-County Business Park, or any other special tax district or financing vehicle authorized by applicable provisions of the Code of Laws of South Carolina (1976), as amended, which does not impose additional ad valorem taxes or assessments against the Project. The establishment by the City, County, or other governmental entity, solely or in conjunction with each other, of a special tax district or financing vehicle authorized by applicable provisions of the Code of Laws of South Carolina (1976), as amended, which increases the assessments within the Property solely, shall require the consent of the Owner or Secondary Developer unless such increase is otherwise expressly permitted pursuant to the terms of this Agreement. It is acknowledged that at the written election of Owner, a Municipal Improvement District may be implemented with the consent of the City for the Project as set forth in this Agreement. 10. Owner agrees to pay the actual costs and reasonable, actual expenses of the City’s consultants and professionals incurred in negotiating, processing and evaluating the Development Agreement, as amended hereby, the PDD, and any other related documents (i.e. Assignments and Estoppel letters) as contemplated and provided for in this Agreement. City will provide sufficient documentation of these charges. Owner shall pay such fees within sixty (60) days of the delivery by City of the invoice(s).

  • Construction of the Project Highway (i) The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The [650th (six hundred and fiftieth) day] from the Appointed Date shall be the scheduled completion date (the “Scheduled Completion Date”) and the Contractor agrees and undertakes that the construction shall be completed on or before the Scheduled Completion Date, including any extension thereof. (ii) The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date specified in Schedule –J and until such Project Milestone is achieved or the Project Highway is completed; provided that if the period for any or all Project Milestones or the Scheduled Completion Date is extended in accordance with the provisions of this Agreement, the dates set forth in Schedule-J shall be deemed to be modified accordingly and the provisions of this Agreement shall apply as if Schedule-J has been amended as above; provided further that in the event the Project Highway is completed within or before the Scheduled Completion Date including any Time Extension, applicable for that work or section, the Damages paid under this Clause 10.3 (ii) shall be refunded by the Authority to the Contractor, but without any interest thereon. The Parties agree that for determining achievement or delays in completion of the Project Milestones or the Project on the due date, the works affected due to delay in providing the site for which time extension has been granted beyond the Scheduled Completion Date will be excluded. For example on the due date to achieve the Project Milestone-I (i.e., Stage Payments of 10% (ten percent) of Contract Price on 180th (one hundred and eighty) day from the Appointed Date), if 5% (five percent) of the project length corresponding to the Project Milestone-I is not handed over or lately handed over resulting in the extension of completion of this 5% (five percent) length beyond Scheduled Completion Date, Stage Payment of 10% X 0.95 = 9.5% only is to be achieved by 180th (one hundred and eighty) day. For the avoidance of doubt, it is agreed that recovery of Damages under this Clause 10.3 (ii) shall be without prejudice to the rights of the Authority under this Agreement including the right of Termination thereof. The Parties further agree that Time Extension hereunder shall only be reckoned for and in respect of the affected Works as specified in Clause 10.5 (ii). (iii) The Authority shall notify the Contractor of its decision to impose Damages in pursuance with the provisions of this Clause 10.3. Provided that no deduction on account of Damages shall be effected by the Authority without notifying the Contractor of its decision to impose the Damages, and taking into consideration the representation, if any, made by the Contractor within 20 (twenty) days of such notice. The Parties expressly agree that the total amount of Damages under Clause 10.3 (ii) shall not exceed 10% (ten percent) of the Contract Price. If the damages exceed 10% (ten percent) of the Contract Price, the Contractor shall be deemed to be in default of this agreement having no cure and the Authority shall be entitled to terminate this Agreement by issuing a Termination Notice in accordance with the provisions of Clause 23.1 (ii). (iv) In the event that the Contractor fails to achieve the Project Completion within a period of 90 (ninety) days from the Schedule Completion Date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, the contractor shall be deemed to be ineligible for bidding any future projects of the Authority, both as the sole party or as one of the parties of Joint Venture/ Consortium during the period from Scheduled Completion Date to issuance of Completion Certificate. This restriction is applicable if the contract value of the delayed project is not less than Rs. 300 Crore.

  • Payment of Project Activities County will reimburse Subrecipient for eligible project-related costs only. Subrecipient shall submit requests for reimbursement to County on a monthly basis beginning on August 1, 2021, and must provide adequate documentation as required by County in accordance with the OC Community Resources Contract Reimbursement Policy, as set forth in Exhibit 1, attached hereto and incorporated herein by reference. In addition, Subrecipient will provide a progress Grantee Performance Report (“GPR Information Form”) for the time period covered, as prescribed by County. Failure to provide any of the required documentation and reporting will cause County to withhold all or a portion of a request for reimbursement, or return the entire reimbursement package to Subrecipient, until such documentation and reporting has been received and approved by County.

  • Operating and Maintenance Expenses Subject to the provisions herein addressing the use of facilities by others, and except for operations and maintenance expenses associated with modifications made for providing interconnection or transmission service to a third party and such third party pays for such expenses, Developer shall be responsible for all reasonable expenses including overheads, associated with: (1) owning, operating, maintaining, repairing, and replacing Developer Attachment Facilities; and (2) operation, maintenance, repair and replacement of Connecting Transmission Owner’s Attachment Facilities. The Connecting Transmission Owner shall be entitled to the recovery of incremental operating and maintenance expenses that it incurs associated with System Upgrade Facilities and System Deliverability Upgrades if and to the extent provided for under Attachment S to the NYISO OATT.

  • Operating and Maintenance Costs The Participating Generator shall be responsible for all its costs incurred in connection with operating and maintaining the Generating Units identified in Schedule 1 for the purpose of meeting its obligations under this Agreement.

  • Completion of the Project The Participating County acknowledges it is obligated to undertake and complete the design and construction of the Project in compliance with all of the applicable terms and conditions of the Project Documents and the Participating County agrees to use its best efforts to cause the completion of design and construction of the Project in compliance with the applicable terms and conditions of such documents. The Participating County agrees to complete the Project in accordance with this Agreement and consistent with the scope, cost and schedule established by the Board and attached hereto in Exhibit A, as such scope, cost and schedule may be modified with the approval of Finance and the recognition of the Board.

  • Development of the Property Except as modified by this Agreement, the Development and the Property will be developed in accordance with all applicable local, state, and federal regulations, including but not limited to the City’s ordinances and the zoning regulations applicable to the Property, and such amendments to City ordinances and regulations that that may be applied to the Development and the Property under Chapter 245, Texas Local Government Code, and good engineering practices (the “Applicable Regulations”). If there is a conflict between the Applicable Regulations and the Development Standards, the Development Standards shall control.