PCC Pole Sample Clauses

PCC Pole. 9 Mtr. Long. No 56 2 Pre-fabricated Hot dip Galvanised steel items like DC cross arm (100x50x6 mm), back clamps (65x8 mm), pole clamp (65x8 mm), DO mounting channel (100x50x6 mm), transformer mounting channel (100x50x6 mm), transformer clamping set (50x50x6 mm), transformer belting set ( 50x50x6 mm) as per technical specification, approved drawings and scope of work. MT 3.741
AutoNDA by SimpleDocs
PCC Pole. 09 Mtr. Long. No 1218 2 Galvanised Stay Set with anchor plate (200x200x6mm), 50x8mm stay clamp, Stay guy insulator, nut bolts, 2 Nos turn buckles, 1.8 m long, 16 mm diameter solid GS Stay rod & 7/3.15 mm Dia GI stranded wire etc as required as per technical specification, approved drawings and scope of work. No. 420 3 Earthing as per approved drawings, technical specifications and scope of work
PCC Pole. 09 Mtr. Long. No 4
PCC Pole. 3 Earthing as per approved drawings, technical specifications and scope of work

Related to PCC Pole

  • New utilities and roads 11.3.1 The Concessionaire shall allow, subject to such conditions as the Authority may specify, access to, and use of the Site for laying telephone lines, water pipes, electric cables or other public utilities. Where such access or use causes any financial loss to the Concessionaire, it may require the user of the Site to pay compensation or damages as per Applicable Laws. For the avoidance of doubt, it is agreed that use of the Site under this Clause shall not in any manner relieve the Concessionaire of its obligation to maintain the Bus Terminal in accordance with this Agreement and any damage caused by such use shall be restored forthwith.

  • New utilities (i) The Contractor shall allow, subject to the permission from the Authority and such conditions as the Authority may specify, access to, and use of the Site for laying telephone lines, water pipes, electricity lines/ cables or other public utilities. Where such access or use causes any financial loss to the Contractor, it may require the user of the Site to pay compensation or damages as per Applicable Laws. For the avoidance of doubt, it is agreed that use of the Site under this Clause 9.3 shall not in any manner relieve the Contractor of its obligation to construct and maintain the Project Highway in accordance with this Agreement and any damage caused by such use shall be restored forthwith at the cost of the Authority.

  • Body Armor In recognition of the need to enhance the personal safety of security personnel at DHMH and Correctional Facilities, the parties agree that non-probationary security personnel who have contact with forensic patients and/or inmates should generally have the opportunity to have individually fitted stab proof vests and, in addition, individually fitted bullet proof vests will be provided to officers on an “as-needed” basis. The sharing of vests shall not be considered an acceptable practice and vests may transferred from employee to employee only if such vests are a proper fit and are appropriately sanitized in accordance with practices necessary to eliminate the risk of the spread of MRSA and other communicable diseases. The parties agree to meet and agree to policies, including any limitations or exclusions, for the provision of stab proof vests to correctional officers and security attendants by January 31, 2008. In developing the policies, the committee shall:

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • MSEA SEIU shall have exclusive rights to payroll deduction of membership dues, service fees, and premiums for current MSEA-SEIU spon- sored insurance programs. Deductions for other programs may be mutually agreed to by the parties.

  • Role of the Central Parties and Crown a) The central parties shall each have the following rights:

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Crossing Picket Lines The Company will not expect an employee to cross a picket line, including a picket line at a customer site, if to do so would place the employee's life, limb or personal property in jeopardy.

  • DHS Seal, Logo, and Flags The Contractor shall not use the Department of Homeland Security (DHS) seal(s), logos, crests, or reproductions of flags or likeness of DHS agency officials without specific FEMA pre-approval.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

Time is Money Join Law Insider Premium to draft better contracts faster.