Performance and Reliability Testing Sample Clauses

Performance and Reliability Testing. In addition to the warranties set forth in this Agreement and to the acceptance testing described in the previous Section, new Hardware or System models, types, or releases not previously installed or successfully tested by EDS (but specifically excluding XFP 2000 model COM recorders) ("New Hardware") must complete a thirty (30) working day performance and reliability testing period. If New Hardware does not perform in accordance with its Applicable Specifications for at least ninety-five percent (95%) of EDS' normal working hours during such testing period following the actual installation date of the New Hardware, then EDS shall so inform Anacomp in writing. Within ten (10) days of receipt of such notice, Anacomp shall, at EDS' option (i) repair or replace the unacceptable New Hardware at no additional cost to EDS, or (ii) accept the return of the New Hardware and refund to EDS any amounts paid by EDS for such New Hardware, including delivery and return transportation costs and expenses. If EDS elects (i) above, the repaired or replacement New Hardware shall be subject to the performance and reliability tests set forth in this Section. For purposes of New Hardware, "Acceptance Date" shall mean the date upon which New Hardware satisfactorily completes the performance and reliability test described in this Section.
AutoNDA by SimpleDocs
Performance and Reliability Testing. The goals of this task are to perform chassis dynamometer testing and multi-week, on- road reliability testing with loaded trailers of the FCEV and NG PHEV Class 8 drayage trucks. • Plan and conduct performance , emissions, and NG hydrogen and electricity consumption testing at the HD Chassis Dynamometer laboratory of the University of California at Riverside, College of Engineering Center for Environmental Research and Technology (UCR CE-CERT). • Test one EV and one NG PHEVFCEV Class 8 drayage trucks each with a loaded trailers in operation closely simulating the drive cycles typically taken by the end-user fleets for a period of 4 weeks. • Identify and characterize the maximum driving range of the FCEV design in real-world operation and validate the its performance of the NG PHEV design over existing road conditions found in Southern California. • Prepare Chassis Dynamometer Test Report for inclusion in the On-Road Test Report that includes but is not limited to emissions and any resultant anomalies noted during testing. • Chassis Dynamometer Test Report • On-Road Test Report The goals of this task are to procure access to local H2 refueling stations, ensure adequate available H2 storage capacity, install at least 4 EV chargers with accompanying charging infrastructure to support field demonstration, deploy at least 1 EV and 3 NG PHEVs4 FCEVs, and field demonstrate the at least 4 trucks for a 12 month period. • Procure access to local H2 refueling stations and ensure adequate available storage capacity throughout the project demonstration period. • Work with each end-user fleet to install the charging infrastructure. • Deliver 4 FCEVs to end-user fleets and prepare documentation including but not limited to photos of delivered vehicles.

Related to Performance and Reliability Testing

  • Performance and Compliance Purchaser shall have performed all of the covenants and complied, in all material respects, with all the provisions required by this Agreement to be performed or complied with by it on or before the Closing.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Performance Reporting The State of California is required to submit the following financial reports to FEMA:

  • Performance Standards The Contractor agrees to perform all tasks and provide deliverables as set forth in the Contract. The Department and the Customer will be entitled at all times, upon request, to be advised as to the status of work being done by the Contractor and of the details thereof.

  • CONTRACTOR PERFORMANCE AUDIT The Contractor shall allow the Authorized User to assess Contractor’s performance by providing any materials requested in the Authorized User Agreement (e.g., page load times, response times, uptime, and fail over time). The Authorized User may perform this Contractor performance audit with a third party at its discretion, at the Authorized User’s expense. The Contractor shall perform an independent audit of its Data Centers, at least annually, at Contractor expense. The Contractor will provide a data owner facing audit report upon request by the Authorized User. The Contractor shall identify any confidential, trade secret, or proprietary information in accordance with Appendix B, Section 9(a), Confidential/Trade Secret Materials.

  • Performance Assessment 6.1 The Performance Plan (Annexure A) to this Agreement sets out key performance indicators and competencies that needs to be evaluated in terms of – 6.1.1 The standards and procedures for evaluating the Employee’s performance; and 6.1.2 During the intervals for the evaluation of the Employee’s performance. 6.2 Despite the establishment of agreed intervals for evaluation, the Employer may in addition review the Employee’s performance at any stage while the contract of employment remains in force; 6.3 Personal growth and development needs identified during any performance review discussion must be documented in a Personal Development Plan as well as the actions agreed to and implementation must take place within set time frames; 6.4 The Employee’s performance will also be measured in terms of contributions to the goals and strategies set out in the Employer’s Integrated Development Plan (IDP) as described in 6.6 – 6.13 below; 6.5 The Employee will submit quarterly performance reports (SDBIP) and a comprehensive annual performance report at least one week prior to the performance assessment meetings to the Evaluation Panel Chairperson for distribution to the panel members for preparation purposes; 6.6 Assessment of the achievement of results as outlined in the performance plan: 6.6.1 Each KPI or group of KPIs shall be assessed according to the extent to which the specified standards or performance targets have been met (qualitative and quantitative) and with due regard to ad-hoc tasks that had to be performed under the KPI; 6.6.2 A rating on the five-point scale described in 6.9 below shall be provided for each KPI or group of KPIs which will then be multiplied by the weighting to calculate the final score; 6.6.3 The Employee will submit his self-evaluation to the Employer prior to the formal assessment; 6.6.4 In the instance where the employee could not perform due to reasons outside the control of the employer and employee, the KPI will not be considered during the evaluation. The employee should provide sufficient evidence in such instances; and 6.6.5 An overall score will be calculated based on the total of the individual scores calculated above.

  • Performance Expectations The Charter School’s performance in relation to the indicators, measures, metrics and targets set forth in the CPF shall provide the basis upon which the SCSC will decide whether to renew the Charter School’s Charter Contract at the end of the charter term. This section shall not preclude the SCSC from considering other relevant factors in making renewal decisions.

  • Performance Requirements A. There is no guaranteed minimum amount of work which will be ordered under this Contract. B. The total Contract amount will not exceed $4,900,000. C. This is a Contract for work specified in individual Job Orders. Work ordered prior to but not completed by the expiration of the Contract period, and any additional work required as a result of unforeseen conditions encountered during construction up to six (6) months after the contract expiration date, will be completed with all provisions of this Contract still in force. Performance time for each Job Order issued under this Contract will be determined in accordance with the Contract. This performance time will be determined and agreed upon by both Parties for each individual Job Order. Contractor must self-perform 20% of the Work under this Contract for ‘A’ and ‘B’ licenses. Contractor must self-perform 75% of the Work under this Contract, unless otherwise approved by the County, for ‘C’ licenses. D. This is an indefinite-quantity Contract for the supplies or services specified and effective for the period stated. Work or performance shall be made only as authorized by Job Orders issued in accordance with the ordering procedures clause. The Contractor agrees to furnish to the County when and if ordered, the supplies or services specified in the Contract up to and including the quantity designated in the Job Orders issued as the maximum designated in the Contract.

  • Performance Levels (a) The Performance Levels which apply to the performance by the respective Parties of their obligations under this Agreement are set out in Part 1 of Schedule 5. A failure by either Party to achieve the relevant Performance Level will not constitute a breach of this Agreement and the only consequences of such failure as between the Parties shall be the consequences set out in this Clause 5.6. (b) If the Operator does not comply with the Operator Performance Level then the Access Holder must pay to QR Network the amount determined in accordance with Schedule 5 as part of the invoice issued by QR Network for Access Charges and other charges for the Billing Period immediately following QR Network becoming entitled to that amount. Where there is no next Billing Period, the Operator must pay such amount to QR Network within fourteen (14) days after receipt of a Tax Invoice from QR Network. (c) If QR Network does not comply with the QR Network Performance Level then QR Network will credit to the Access Holder the amount determined in accordance with Schedule 5 by way of a deduction from the invoice issued by QR Network for Access Charges and other charges for the Billing Period immediately following the Access Holder becoming entitled to that amount. Where there is no next Billing Period, QR Network must pay such amount to the Access Holder within fourteen (14) days after receipt of a Tax Invoice from the Access Holder. (d) The Parties must, if requested by either Party, meet to review the Performance Levels subject to such review not occurring within six (6) Months after the Commitment Date or any previous review of the Performance Levels. If either Party notifies the other that it considers that the Performance Levels are no longer appropriate, the Parties may agree on varied Performance Levels and any associated variations to the Agreement including the Base Access Charges and the Train Service Description. If the Parties are unable to agree to such variations, then the existing Performance Levels shall continue to apply unless varied by QR Network in accordance with the provisions of Clause 5.6(e). (e) In the event that the Access Holder and/or the Operator (i) does not comply in any material respect with the Train Service Description; and (ii) the Access Holder fails to demonstrate to the reasonable satisfaction of QR Network when requested to do so, that the Access Holder will consistently comply with the Train Service Description for the remainder of the Term then, following consultation with the Access Holder, QR Network will be entitled to: (iii) vary the Train Service Description to a level it reasonably expects to be achievable by the Access Holder for the remainder of the Term having regard to the extent of previous compliance with the Train Service Description (ignoring, for the purpose of assessing previous compliance, any non-compliance to the extent that the non-compliance was attributable to a Railway Operator (other than the Access Holder) or to QR Network); and (iv) vary the Agreement (including, without limitation, the Operator Performance Level and the Base Access Charges) to reflect the impact of the change in the Train Service Description. (f) The Access Holder shall be entitled to dispute any variation proposed by QR Network pursuant to Clause 5.6(e) and such dispute will be referred to an expert for resolution in accordance with Clause 17.3.