PHASE I & PHASE II ENVIRONMENTAL SERVICES Sample Clauses

PHASE I & PHASE II ENVIRONMENTAL SERVICES. In consideration of the substantial risks to ARRO in performing Phase I and Phase II environmental assessment services, the Client agrees, to the maximum extent permitted by law, to indemnify and hold harmless from any damage, liability or cost, including reasonable attorneys’ fees and costs of defense, arising out of or resulting from the performance of services under this Agreement or related in any manner whatsoever to the existence, identification, release or disposal of hazardous or toxic substances, except those damages, liabilities or costs arising directly from the sole negligence or willful misconduct of ARRO.
AutoNDA by SimpleDocs

Related to PHASE I & PHASE II ENVIRONMENTAL SERVICES

  • Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following: a. Initial Study b. Categorical Exemption (CE) c. Notice of Exemption (XXX) d. Negative Declaration (ND) e. Mitigated Negative Declaration (MND) f. Notice of Preparation (NOP) g. Environmental Impact Report (EIR) i. Initial Document (Screen Check/Administrative Draft) ii. Addendum iii. Supplemental

  • Periodic Review of Costs of Environmental Compliance In the ordinary course of its business, the Company conducts a periodic review of the effect of Environmental Laws on the business, operations and properties of the Company and its subsidiaries, in the course of which it identifies and evaluates associated costs and liabilities (including, without limitation, any capital or operating expenditures required for clean-up, closure of properties or compliance with Environmental Laws or any permit, license or approval, any related constraints on operating activities and any potential liabilities to third parties). On the basis of such review and the amount of its established reserves, the Company has reasonably concluded that such associated costs and liabilities would not, individually or in the aggregate, result in a Material Adverse Change.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Environmental Site Assessment Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Working Environment The Parties agree that a safe and clean working environment is essential in order to carry out work assignments in a satisfactory manner. It will be the Employer's responsibility to ensure that all working areas and Employer-owned vehicles are maintained in a safe and clean condition.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Work Environment It is mutually agreed that the prevention of accidents and injuries to state employees will result in greater efficiency of operations of state government. Toward this end, the Employer shall make every reasonable effort to provide and maintain safe and healthy working conditions and the Union shall fully cooperate by encouraging all employees to perform their assigned tasks in a safe manner.

  • NON-SEXIST ENVIRONMENT 1. A non-sexist environment is defined as that in which there is no discrimination against females or males by portraying them in gender stereotyped roles or by omitting their contributions. 2. The employer does not condone and will not tolerate any written or verbal expression of sexism. In September of each school year the employer and the local shall jointly notify administrative officers and staff, in writing, of their commitment to a non-sexist environment. 3. The employer and the local shall promote a non-sexist environment through the development, integration, and implementation of non-sexist educational programs, activities, and learning resources for both staff and students.

  • O.S.H.A. and Environmental Compliance (a) Except as could not reasonably be expected, individually or in the aggregate, to have a Material Adverse Effect, each Borrower has duly complied with, and its facilities, business, assets, property, leaseholds, Real Property and Equipment are in compliance in all material respects with, the provisions of the Federal Occupational Safety and Health Act, the Environmental Protection Act, RCRA and all other Environmental Laws; there have been no outstanding citations, notices or orders of non-compliance issued to any Borrower or relating to its business, assets, property, leaseholds or Equipment under any such laws, rules or regulations. (b) Except as could not reasonably be expected, individually or in the aggregate, to have a Material Adverse Effect, each Borrower has been issued all required federal, state and local licenses, certificates or permits relating to all applicable Environmental Laws. (i) There are no visible signs of material releases, spills, discharges, leaks or disposal (collectively referred to as “Releases”) of Hazardous Substances at, upon, under or within any Real Property including any premises leased by any Borrower; (ii) to the best knowledge of Borrowers, there are no underground storage tanks or polychlorinated biphenyls on the Real Property including any premises leased by any Borrower, (iii) to the best knowledge of Borrowers, the Real Property including any premises leased by any Borrower has never been used as a treatment, storage or disposal facility of Hazardous Waste; and (iv) to the best knowledge of Borrowers, no Hazardous Substances are present on the Real Property including any premises leased by any Borrower, excepting such quantities as are handled in accordance with all applicable manufacturer’s instructions and governmental regulations and in proper storage containers and as are necessary for the operation of the commercial business of any Borrower or of its tenants.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!