Physical Location and Point of Interconnection Sample Clauses

Physical Location and Point of Interconnection. CAISO transmission access charge area (e.g. PG&E): ___________ Existing zone (e.g. NP-15): ___________ Physical point of interconnection to CAISO Grid: ___________ Point of interconnection address: ___________ Substation: ___________ Discharging and Charging Maximum continuous discharge power (Dmax): ___ MW Minimum continuous discharge power (Dmin): ___ MW Maximum discharge duration at constant Dmax : ___ (hours) Maximum continuous charge power (Cmax): ____ MW Minimum continuous charge power (Cmin): ____ MW Maximum charge duration at constant Cmax: ___ (hours) Amount of Energy released to fully discharge: ___ MWh Amount of Energy required to fully charge: ___ MWh Round-trip efficiency: ______________ %
AutoNDA by SimpleDocs
Physical Location and Point of Interconnection. CAISO transmission access charge area (e.g. PG&E): ___________ Sub-LAP(s): ___________ Point of interconnection: ___________ Substation: ___________ Operating Characteristics Maximum dispatchable level (Dmax of the Project): ___ MW Minimum dispatchable level (Dmin of the Project): ___ MW Maximum dispatch duration at constant Dmax: ___ hours Capacity of the Project: ____ MW
Physical Location and Point of Interconnection. CAISO transmission access charge area (e.g. PG&E): Existing zone (e.g. NP-15): Physical point of interconnection to CAISO Grid: Point of interconnection address: Substation: Discharging and Charging Maximum continuous discharge power (Dmax): MW Minimum continuous discharge power (Dmin): MW Maximum discharge duration at constant Dmax : (hours) Maximum continuous charge power (Cmax): MW Minimum continuous charge power (Cmin): MW Maximum charge duration at constant Cmax: (hours) Amount of Energy released to fully discharge: MWh Amount of Energy required to fully charge: MWh Round-trip efficiency: %

Related to Physical Location and Point of Interconnection

  • Establishment of Point of Interconnection The point where the electric energy first leaves the wires or facilities owned by the Cooperative and enters the wires or facilities provided by DG Owner/Operator is the "Point of Interconnection." Cooperative and DG Owner/Operator agree to interconnect the Facilities at the Point of Interconnection in accordance with the Cooperative's Rules and Regulations and DG Manual relating to interconnection of Distributed Generation (the "Rules") and as described in the attached Exhibit A. The interconnection equipment installed by the customer ("Interconnection Facilities") shall be in accordance with the Rules as well.

  • Point of Interconnection The Point of Interconnection shall be as identified on the one-line diagram attached as Schedule B to this ISA.

  • of Interconnection 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by ENT.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Commencement of Interconnection Activities If the Developer executes the final LGIA, the ISO, Connecting Transmission Owner and the Developer shall perform their respective obligations in accordance with the terms of the LGIA, subject to modification by FERC. Upon submission of an unexecuted LGIA in accordance with Section 30.11.3, the Parties shall promptly comply with the unexecuted LGIA, subject to modification by FERC.

  • Points of Interconnection As and to the extent required by Section 251 of the Act, the Parties shall provide Interconnection of their networks at any technically feasible point as described in Section 4.3. To the extent the originating Party’s POI is not located at the terminating Party’s relevant IP, the originating Party is responsible for transporting its traffic from it’s POI to the terminating Party’s relevant IP.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.