Placement and Finishing. The concrete sidewalk slabs shall be placed in alternate slabs 30 feet in length except as otherwise ordered. The slabs for sidewalks shall be separated by transverse preformed expansion joint fillers and sealer ½ inch thickness, as specified. Concrete placement shall comply with the requirements as specified under CONCRETE WORK for mixing and placing concrete and as herein specified. Concrete shall not be placed until forms have been checked for line grade. Unless otherwise specified, concrete shall be 4000 psi and shall meet MHD Standard Specifications as specified in Section M4.02.00 of the “Standard Specifications for Highways and Bridges,” Commonwealth of Massachusetts, Department of Public Works, 2023 Edition, as amended and corrected. Subbase shall be moistened as necessary to provide a uniform damp condition at the time of concrete placement. Concrete shall be placed in a continuous operation using methods which prevent segregation of mix. If placement is interrupted for more than ¼ hour, the Contractor shall place a construction joint. Construction joints shall be placed at score lines only, using a standard metal key-way section form. After striking off and consolidating the concrete, the contractor shall smooth the surface by screening and floating. The surface shall then be checked for trueness and troweled to remove irregularities. After troweling, contraction joints shall be scored and edging done. When excess moisture or surface sheen has disappeared, the surface shall be broomed lightly at right angles to the curb or as directed. Tooling of edges and contraction joints shall then be repeated to remove broom finish in these areas. The surface of all concrete sidewalks shall be uniformly scored with contraction joints into block unit of areas not more than 36 square feet as directed. The depth of the scoring shall be 1 inch.
AutoNDA by SimpleDocs

Related to Placement and Finishing

  • Equipment and Facilities For On-Site Courses, you will supply the facility and equipment as set forth at xxx.xxxxxx.xxx/xxxxxxxx/xxxxxxxxx/xxxxxxxxxxxx.xxxx. If Red Hat agrees to provide the training facilities and hardware, you will be liable for any loss or destruction of this equipment and hardware used in connection with the Training.

  • Cut Banks and Fill Slopes (1) Remove slash created by operations.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Equipment and Supplies Independent Contractor, at Independent Contractor's sole expense, shall provide all equipment, tools and supplies necessary to perform the Service.