PLUMBING AND SEWAGE DISPOSAL SYSTEMS Sample Clauses

PLUMBING AND SEWAGE DISPOSAL SYSTEMS. The operation of plumbing and sewage disposal systems is warranted for a period of one hundred twenty (120) days, except that if in the course of correcting a stoppage, any foreign objects from the Dwelling Owners’ household are found within the system, the Owner will pay the entire cost of correction. Dripping faucets and/or fixtures occurring within one hundred twenty (120) days will be repaired by the Builder. The Owners must insure that exterior faucets are drained and shut off inside before advent of winter. Frozen exterior faucets are never the responsibility of the Builder.
AutoNDA by SimpleDocs

Related to PLUMBING AND SEWAGE DISPOSAL SYSTEMS

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Garbage Disposal You are responsible for ensuring Your and Your guests’ rubbish is removed from the Room, Building and Common Property in a timely manner and properly deposited in the communal rubbish areas allocated by Us for collection. You must use all garbage chutes according to pasted instructions near chutes.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Waste Disposal Tenant shall store its waste either inside the Premises or within outside trash enclosures that are fully fenced and screened in compliance with all Private Restrictions, and designed for such purpose. All entrances to such outside trash enclosures shall be kept closed, and waste shall be stored in such manner as not to be visible from the exterior of such outside enclosures. Tenant shall cause all of its waste to be regularly removed from the Premises at Tenant’s sole cost. Tenant shall keep all fire corridors and mechanical equipment rooms in the Premises free and clear of all obstructions at all times.

  • Air Transportation In accordance with the standard provision entitled International Air Transportation, any international travel requires prior written approval from the FHI360 contracts administrator.

  • Parking and Transportation ‌ The Union agrees that during the life of this Agreement, the University may apply changes in transportation policy, including adjusting parking and U-Pass fees and criteria for assigning parking spots, to the bargaining unit without the obligation to bargain with the Union. The Union may raise issues and concerns about the University’s parking program at Joint Labor/Management Committee meetings or at ad hoc Labor Management Committee meetings. The Union shall have a standing seat on the University’s committee(s) that work on transportation and parking issues.

  • SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State.

  • AIR TRANSPORT 1. Profits derived by an enterprise of a Contracting State from the operation of aircraft in international traffic shall be taxable only in that State.

Time is Money Join Law Insider Premium to draft better contracts faster.