Positioning requirements Sample Clauses

Positioning requirements. The NORSOK Standard D-10 provides specific well abandonment regulations. This document requires xxxxx to be plugged and maintain their integrity over geological time scales. At least one well barrier is required between a potential source of inflow and the surface, unless a reservoir contains hydrocarbons in which case two well barriers are required. Well barriers should be installed as close to the potential source of inflow as technically possible, sealing all possible leak paths. The primary and secondary well barriers shall be placed at a depth where the estimated formation fracture pressure at the base of the plug is in excess of the potential internal pressure (NORSOK D-10). The final location of the well barrier/WBEs has to be verified. Where casing is part of the permanent barrier, a column of intact cement in the annulus is required as a permanent barrier. A cement plug must be set along the same interval. An open-hole cement plug can be considered a proper well barrier between reservoirs. It should also be used as a primary well barrier, if technically feasible, see Table A 2 in the Appendix. These practices and well configurations are in line with the methodology recommended in UKOOA (2009). When well completion tubulars are left in hole and permanent plugs are installed through and around the tubular, appropriate practices to install and verify the position and quality of the plug inside the tubular, and between the tubular and the casing shall be used. Multiple reservoir zones/perforations within the same pressure regime, isolated with a well barrier placed in between them, can be considered as one reservoir for which a primary and secondary well barrier shall be installed as shown in Figure 2.
AutoNDA by SimpleDocs
Positioning requirements. For all monitoring activities, navigational instruments shall be correctly calibrated before each sampling event.

Related to Positioning requirements

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Training Requirements Grantee shall:

  • Screening Requirements Xxxxxx shall ensure that all prospective and current Covered Persons are not Ineligible Persons, by implementing the following screening requirements.

  • Monitoring Requirements This Schedule sets out the contract management requirements which are applicable to the delivery of the Services.

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.

  • ORDERING REQUIREMENTS Eligible Purchasers shall order Goods and/or Services from this Master Contract, consistent with the terms hereof and by using any ordering mechanism agreeable both to Contractor and Purchaser but including, at a minimum, a purchase order. When practicable, Contractor and Purchaser also shall use telephone orders, email orders, web-based orders, and similar procurement methods (collectively “Purchaser Order”). All Purchase Orders must reference the Master Contract number. The terms of this Master Contract shall apply to any Purchase Order and, in the event of any conflict, the terms of this Master Contract shall prevail. Notwithstanding any provision to the contrary, in no event shall any ‘click-agreement,’ software or web-based application terms and conditions, or any other agreement modify the terms and conditions of this Master Contract.

  • Trunking Requirements 7.2.2.9.1 The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.

  • Testing Requirements 12.1. Workplaces -

  • Switching System Hierarchy and Trunking Requirements For purposes of routing Ymax traffic to Verizon, the subtending arrangements between Verizon Tandems and Verizon End Offices shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to Ymax, the subtending arrangements between Ymax Tandems and Ymax End Offices shall be the same as the Tandem/End Office subtending arrangements that Ymax maintains for the routing of its own or other carriers’ traffic.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!