Post Commingling Point Gas Entry Conditions Sample Clauses

Post Commingling Point Gas Entry Conditions. 7.1 All Natural Gas leaving the Commingling Point shall not contain any solid, liquid or gaseous material which would interfere with the integrity or operation of the System or any pipeline connected to such System or any appliance which a consumer might reasonably be expected to have connected to the System. In addition, all Natural Gas leaving the Commingling Point shall be in accordance with the following values: (a) Hydrogen Sulphide not more than 3.3 ppm. (b) Total Sulphur not more than 15 ppm. (d) Hydrogen Content Oxygen Content not more than 0.1 mol%. not more than 10 ppm. (e) Hydrocarbon Dewpoint not more than minus two degrees Celsius (-2°C) at any pressure up to the delivery pressure provided in paragraph (p). (f) Water Dewpoint not such as would cause a water dewpoint more than minus ten degrees Celsius (-10ºC) at the delivery pressure provided in paragraph (p). (g) Xxxxx Number shall be between 48.14 MJ/SCM, and 51.41 MJ/SCM. (h) Incomplete Combustion not more than 0.48. Factor (ICF) (i) Soot Index (SI) not more than 0.60.
AutoNDA by SimpleDocs
Post Commingling Point Gas Entry Conditions. 7.1 All Natural Gas leaving the Commingling Point shall not contain any solid, liquid or gaseous material which would interfere with the integrity or operation of the System or any pipeline connected to such System or any appliance which a consumer might reasonably be expected to have connected to the System. In addition, all Natural Gas leaving the Commingling Point shall be in accordance with the following values: (a) Hydrogen Sulphide not more than 3.3 ppm. (b) (c) Total Sulphur Hydrogen Content not more than 15 ppm. not more than 0.1 mol%.

Related to Post Commingling Point Gas Entry Conditions

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.

  • Delivery Conditions (a) The Delivery Conditions are as follows: (i) At Seller’s expense, Seller shall have secured all Governmental and grid operations approvals as are necessary for the safe and lawful operation and maintenance of the Project and to enable Seller to deliver Distribution Services at the Initial Contract Capacity to Buyer. (ii) Seller shall have posted collateral as required by Section 10.4(a)(ii). (iii) Seller shall have submitted for Buyer’s review a Project Safety Plan incorporating the elements described in Appendix XII, which must demonstrate Seller’s ability to comply with the Safety Requirements on the IDD and for the Delivery Term. (iv) Seller shall have delivered to Buyer the Safety Attestation in accordance with Section 2(a) of Appendix XIV. (v) As of the IDD, no Seller’s Event of Default shall have occurred and remain uncured. (vi) At Seller’s expense, Seller or Contractor shall have constructed or caused to be constructed the Project as of the IDD and submitted the Certification for Commercial Operation in Appendix VII-A to enable (A) Seller to satisfy the obligations of the Seller herein and (B) the Project to deliver Distribution Services at the Contract Capacity to Buyer. (vii) At Seller’s expense, Seller shall have installed any necessary metering to deliver the applicable Distribution Services in accordance with Section 4.1 and any applicable tariffs of the Utility Distribution Company. (viii) Seller shall have met each Critical Milestone set forth in Appendix VI pursuant to Section 2.3.

  • Emergency Conditions “Emergency Condition” shall mean a condition or situation: (1) that in the judgment of the Party making the claim is imminently likely to endanger life or property; or (2) that, in the case of the Transmission Provider, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to the Transmission System, the Transmission Owner’s Interconnection Facilities or the Transmission Systems of others to which the Transmission System is directly connected; or (3) that, in the case of the Interconnection Customer, is imminently likely (as determined in a non-discriminatory manner) to cause a material adverse effect on the security of, or damage to, the Small Generating Facility or the Interconnection Customer’s Interconnection Facilities. Under Emergency Conditions, the Transmission Owner may immediately suspend interconnection service and temporarily disconnect the Small Generating Facility. The Transmission Provider shall notify the Interconnection Customer promptly when it becomes aware of an Emergency Condition that may reasonably be expected to affect the Interconnection Customer’s operation of the Small Generating Facility. The Interconnection Customer shall notify the Transmission Provider promptly when it becomes aware of an Emergency Condition that may reasonably be expected to affect the Transmission Owner’s Transmission System or other Affected Systems. To the extent information is known, the notification shall describe the Emergency Condition, the extent of the damage or deficiency, the expected effect on the operation of both Parties’ facilities and operations, its anticipated duration, and the necessary corrective action.

  • Delivery Condition Subtenant acknowledges that it takes possession of the Subleased Premises in its “as is” condition, and further acknowledges that Sublandlord has made no representations or warranties of any kind or nature, whether express or implied, with respect to the Subleased Premises, the remainder of the Premises, the common areas, or the Building, nor has Sublandlord agreed to undertake or perform any modifications, alterations, or improvements to the Subleased Premises, the remainder of the Premises, the common areas or the Building which would inure to Subtenant’s benefit.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • How Do I Correct an Excess Contribution? If you make a contribution in excess of your allowable maximum, you may correct the excess contribution and avoid the 6% penalty tax under Section 4973 of the Internal Revenue Code for that year by withdrawing the excess contribution and its earnings on or before the due date, including extensions, of the tax return for the tax year for which the contribution was made (generally October 15th). Any earnings on the withdrawn excess contribution may be subject to a 10% early distribution penalty tax if you are under age 59½. In addition, in certain cases an excess contribution may be withdrawn after the time for filing your tax return. Finally, excess contributions for one year may be carried forward and applied against the contribution limitation in succeeding years.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!