Power Point Template Sample Clauses

Power Point Template. For the project official presentations (both internal and external) a dedicated Power Point template has been created with the official logo, defined colours and fonts. The template includes different slide layouts to cover different contents (text, images, bullet list, …). Each slide includes the project logo and the European commission logo, the section title, subtitle and index number. The default font used is Open Sans.
AutoNDA by SimpleDocs
Power Point Template. A Power Point template was provided. A screenshot of the slides and Styles embedded is shown below/ Figure 13: Power Point template However, due to a request from some partners, an updated version of the Power Point template has been prepared by Polis. The new template includes more layouts for slides with various contents (text, bullet points, images, tables) and page numbers. Figure 14: Updated Power Point template
Power Point Template. The PowerPoint Template is designed to be used for project meetings and official presentations of CADDY project. Theme fonts used are:

Related to Power Point Template

  • OVATIONS FOOD SERVICES, L.P. dba SPECTRA All food and beverage service must be discussed with and approved by Spectra, the OCFEC Master Concessionaire. FORM F-31 AGREEMENT NO. R-026-18 DATE May 16, 2018 REVIEWED APPROVED RENTAL AGREEMENT FAIRTIME INTERIM XX THIS AGREEMENT by and between the 32nd District Agricultural Association dba OC Fair & Event Center, hereinafter called the Association, and B & L Productions, Inc. hereinafter, called the Rentor

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Signaling Parameters All SS7 signaling parameters will be provided in conjunction with traffic exchange trunk groups, where and as available. These parameters include Automatic Number Identification ("ANI"), Calling Party Number ("CPN"), Privacy Indicator, calling party category information, originating line information, charge number, etc. Also included are all parameters relating to network signaling information, such as Carrier Information Parameter ("CIP"), wherever such information is needed for call routing or billing. GTE will provide SS7 via GR-394-SS7 and/or GR-317-SS7 format(s).

  • Network Resource Interconnection Service (check if selected)

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • VACANCIES AND JOB POSTINGS 17.01 When a job vacancy or vacancies occur within the bargaining unit and the Employer intends to fill the vacancy, the Employer will post an announcement of such vacancy or vacancies on all Union bulletin boards. Said postings shall remain posted for a period of five (5) working days. The announcement shall contain the job title of the vacancy, a brief job description and the rate of pay, and the date of the posting and bid deadline date.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!