Preheat And Interpass Temperature Sample Clauses

Preheat And Interpass Temperature. A minimum preheat temperature of 400°F shall be achieved through the full thickness of the component prior to the start of hardbanding or application of mild steel (butter-pass) and this temperature shall be maintained as the minimum interpass temperature throughout the welding process. The maximum interpass temperature for the application of hardbanding or mild steel shall be 650°F.
AutoNDA by SimpleDocs
Preheat And Interpass Temperature. Perform preheating as required by the applicable provisions of AWS D1.5M/D1.5 for all welds except that the temperature of the base metal must be at least 70 degrees F. Preheat fracture critical welds in accordance with the requirements specified in AWS D1.5M/D1.5 for ASTM A709/A709M Gr. 50 or 50S. Minimum Preheat and Interpass Temperatures Table and the PQR/WPS. Slowly and uniformly heat the weldments that are required to be preheated by approved means to the prescribed temperature, held at that temperature until the welding is completed and then permitted to cool slowly as required and in accordance with the approved WPS in order to prevent cracking or distortion.
Preheat And Interpass Temperature. Preheating shall be performed as required by AWS D1.1/D1.1M or as otherwise specified except that the temperature of the base metal shall be at least 70 degrees F. The weldments to be preheated shall be slowly and uniformly heated by approved means to the prescribed temperature, held at that temperature until the welding is completed and then permitted to cool slowly in still air.
Preheat And Interpass Temperature. Stainless steel shall not be preheated unless approved by the Government Representative. The interpass temperature shall not exceed 200 degrees F. at a distance of one half-inch maximum in all directions from the point of welding.

Related to Preheat And Interpass Temperature

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Demarcation Point 98.1 CenturyLink will designate the point of demarcation between CenturyLink’s equipment and CLEC’s collocated equipment, which point of demarcation shall be in or adjacent to its Collocation Space unless otherwise mutually agreed to by the Parties. At CLEC's request, CenturyLink will identify the location(s) of other possible demarcation points available to CLEC, and CLEC will designate from these location(s) the point(s) of demarcation between its collocated equipment and CenturyLink's equipment. CenturyLink will use its best efforts to identify the closest demarcation point to CLEC's equipment that is available.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Management and Control Systems Grantee will:

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.